Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Upgrading Of Existing Kutcha Wbm Road To Pavered Road Or Over Jaleswar Vihar 3rd, 4th, 5th Lane Kutcha Road
|
| Description |
Upgrading Of Existing Kutcha Wbm Road To Pavered Road Or Over Jaleswar Vihar 3rd, 4th, 5th Lane Kutcha Road
|
| Organisation | Government of Odisha |
| Tender Id | 2023_ORULB_93866_31 |
|
Reference Number |
BeMC(BAM)/279/2023-24 |
| Tender Fee | 7080 |
| EMD | 21880 |
| Tender Value | - |
| Place | Berhampur Municipal Corporation |
| Link |
View Original Tender Notice
https://tendersodisha.gov.in |
| Start Date | September 07, 2023 20:30 |
| End Date |
Expired
22/09/2023
Expired 1120 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Macadamization of chobia link road in km 1st to 4th (double lane) (under city and town roads 2026-27) (5th call)
Macadamization of chobia link road in km 1st to 4th (double lane) (under city and town roads 2026-27) (5th call)
Read moreAdvanced motorised stereo zoom microscope,camc for 1st year,camc for 2nd year,camc for 3rd year,camc for 4th year,camc for 5th year
Advanced motorised stereo zoom microscope,camc for 1st year,camc for 2nd year,camc for 3rd year,camc for 4th year,camc for 5th year
Read moreProvision of kavach (tcas) alteration ( medha make) in connection with 5th and 6th line work in borivali (bvi) and virar (vr) section and 3rd and 4th line work in virar (vr) and dahanu road (drd) sections
Provision of kavach (tcas) alteration ( medha make) in connection with 5th and 6th line work in borivali (bvi) and virar (vr) section and 3rd and 4th line work in virar (vr) and dahanu road (drd) sections
Read moreVap care,rates filter tubing frozen for ten year,collection container tubing,lumen,cmc 1st year,cmc 2nd year,cmc 3rd year,cmc 4th year,cmc 5th year,cmc 6th year,cmc7th year,cmc 8th year
Vap care,rates filter tubing frozen for ten year,collection container tubing,lumen,cmc 1st year,cmc 2nd year,cmc 3rd year,cmc 4th year,cmc 5th year,cmc 6th year,cmc7th year,cmc 8th year
Read moreAlternator 24 volts 45 amp,lock assy gate side lh,driven plate for clutch,assy mag valve,synchroring 5th speed,shifter sleeve 1st 2nd and 3rd 4th,pin retention,compression spring,carrier,suspension bush kit,cable comp speedometer,cable comp front brake
Alternator 24 volts 45 amp,lock assy gate side lh,driven plate for clutch,assy mag valve,synchroring 5th speed,shifter sleeve 1st 2nd and 3rd 4th,pin retention,compression spring,carrier,suspension bush kit,cable comp speedometer,cable comp front brake
Read moreRepairs to various snow machines viz tata lpt 713 mc26 snow cats sonalika cat 1st 2nd 3rd 5th and 6th preet snow cat 7thand 8th farmtrac snow cat 9th and 18th new holland snow cat 4th rolba 1500 of sccr kulgam bathipora of mech
Repairs to various snow machines viz tata lpt 713 mc26 snow cats sonalika cat 1st 2nd 3rd 5th and 6th preet snow cat 7thand 8th farmtrac (snow cat 9th and 18th), new holland (snow cat 4th rolba 1500 of sccr kulgam bathipora of mech
Read moreBlood gas analyser machine,abg samples fifty sample per day,cmc for 1st year post warranty,cmc for 2nd year post warranty,cmc for 3rd year post warranty,cmc for 4th year post warranty,cmc for 5th year post warranty,cmc for 6th year post warranty,cmc for 7th year post warranty,cmc for 8th year post warranty
Blood gas analyser machine,abg samples fifty sample per day,cmc for 1st year post warranty,cmc for 2nd year post warranty,cmc for 3rd year post warranty,cmc for 4th year post warranty,cmc for 5th year post warranty,cmc for 6th year post warranty,cmc for 7th year post warranty,cmc for 8th year post warranty
Read morePolysomnography psg with video eeg,eeg electrodes,conduction paste,cleaning gel,psg sensor kit,nasal cannula adult,nasal cannula padiatrics,respiratory effort belts reusable,respiratory effort belts disposable,respiratory effort belts cut to fit types,dvd,cmc 3rd year,cmc 4th year,cmc 5th year,cmc 6th year,cmc 7th year,cmc 8th year,cmc 9th year,cmc 10th year
Polysomnography psg with video eeg,eeg electrodes,conduction paste,cleaning gel,psg sensor kit,nasal cannula adult,nasal cannula padiatrics,respiratory effort belts reusable,respiratory effort belts disposable,respiratory effort belts cut to fit types,dvd,cmc 3rd year,cmc 4th year,cmc 5th year,cmc 6th year,cmc 7th year,cmc 8th year,cmc 9th year,cmc 10th year
Read moreSitc of fire engine as per soj and stc at hazira ird,pwamc visit charges 1st year as per soj and stc at hazira ird,breakdown visit charges 1st year as per soj and stc at hazira ird,pwamc visit charges 2nd year as per soj and stc at hazira ird,breakdown visit charges 2nd year as per soj and stc at hazira ird,pwamc visit charges 3rd year as per soj and stc at hazira ird,breakdown visit charges 3rd year as per soj and stc at hazira ird,pwamc visit charges 4th year as per soj and stc at hazira ird,breakdown visit charges 4th year as per soj and stc at hazira ird,breakdown visit charges 5th year as per soj and stc at hazira ird,breakdown visit charges 5th year as per soj and stc at hazira ird
Sitc of fire engine as per soj and stc at hazira ird,pwamc visit charges 1st year as per soj and stc at hazira ird,breakdown visit charges 1st year as per soj and stc at hazira ird,pwamc visit charges 2nd year as per soj and stc at hazira ird,breakdown visit charges 2nd year as per soj and stc at hazira ird,pwamc visit charges 3rd year as per soj and stc at hazira ird,breakdown visit charges 3rd year as per soj and stc at hazira ird,pwamc visit charges 4th year as per soj and stc at hazira ird,breakdown visit charges 4th year as per soj and stc at hazira ird,breakdown visit charges 5th year as per soj and stc at hazira ird,breakdown visit charges 5th year as per soj and stc at hazira ird
Read moreSupply of self- propelled articulating boom lift at various site of wr-ii,amc for 1st year as per scope of work and ts,amc for 2nd year as per scope of work and ts,amc for 3rd year as per scope of work and ts,amc for 4th year as per scope of work and ts,amc for 5th year as per scope of work and ts,supply of self- propelled articulating boom lift at various site of wr-ii,amc for 1st year as per scope of work and ts,amc for 2nd year as per scope of work and ts,amc for 3rd year as per scope of work and ts,amc for 4th year as per scope of work and ts,amc for 5th year as per scope of work and ts,supply of self- propelled articulating boom lift at various site of wr-ii,amc for 1st year as per scope of work and ts,amc for 2nd year as per scope of work and ts,amc for 3rd year as per scope of work and ts,amc for 4th year as per scope of work and ts,amc for 5th year as per scope of work and ts,supply of self- propelled articulating boom lift at various site of wr-ii,amc for 1st year as per scope of work and ts,amc for
Supply of self- propelled articulating boom lift at various site of wr-ii,amc for 1st year as per scope of work and ts,amc for 2nd year as per scope of work and ts,amc for 3rd year as per scope of work and ts,amc for 4th year as per scope of work and ts,amc for 5th year as per scope of work and ts,supply of self- propelled articulating boom lift at various site of wr-ii,amc for 1st year as per scope of work and ts,amc for 2nd year as per scope of work and ts,amc for 3rd year as per scope of work and ts,amc for 4th year as per scope of work and ts,amc for 5th year as per scope of work and ts,supply of self- propelled articulating boom lift at various site of wr-ii,amc for 1st year as per scope of work and ts,amc for 2nd year as per scope of work and ts,amc for 3rd year as per scope of work and ts,amc for 4th year as per scope of work and ts,amc for 5th year as per scope of work and ts,supply of self- propelled articulating boom lift at various site of wr-ii,amc for 1st year as per scope of work and ts,amc for
Read moreof your Industry type