Tender Details
Particulars | Details |
---|---|
Title |
Design, Development, Implementation, Support / Maintenance/ Upgradation / Schemes Integration Of Centralized (Dashboard) Web Portal For State Water And Sanitation Mission State Water And Sanitation Mission (Swsm) Lucknow, Uttar Pradesh
|
Description |
Design, Development, Implementation, Support / Maintenance/ Upgradation / Schemes Integration Of Centralized (Dashboard) Web Portal For State Water And Sanitation Mission State Water And Sanitation Mission (Swsm) Lucknow, Uttar Pradesh
|
Organisation | UPTRON Powertronics Limited | State Govt. and UT |
Tender Id | 2025_UPPOW_1032665_1 |
Reference Number |
UPL/SW/2025-26/05 |
Tender Fee | 2360 |
EMD | 0 |
Tender Value | |
Place | Lucknow |
Link | https://etender.up.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1868963 |
Start Date | April 25, 2025 23:15 |
End Date |
09/05/2025 ( Expired 29 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Consultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)
Consultancy services as ie during o and m period for the project two laning with paved shoulders of aligarh-moradabad section of nh-509 from km. 79.000 to km.232.020 in the state of uttar pradesh on performance -based maintenance contract (pbmc)
Read moreProviding, running and maintenance of commercial vehicle innova hycross model or equivalent and scorpio-n model or equivalent for regional office-up west lucknow, uttar pradesh 5th call
Providing, running and maintenance of commercial vehicle innova hycross model or equivalent and scorpio-n model or equivalent for regional office-up west lucknow, uttar pradesh 5th call
Read moreDevelopment of internal infrastructure for uttar pradesh defence industrial corridor, agra node with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode
Development of internal infrastructure for uttar pradesh defence industrial corridor, agra node with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode
Read moreDevelopment of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.
Development of internal infrastructure for uttar pradesh defence industrial corridor, aligarh node, phase ii with defect liability period and operation and maintenance for concurrent period of five 05 years on epc mode.
Read moreDesign and construction of flyover at sijwaha tiraha at ch 1377.750 on shivpuri jhansi section of nh27 for permanent rectification of morth identified blackspot location in the state of uttar pradesh on epc mode
Design and construction of flyover at sijwaha tiraha at ch 1377.750 on shivpuri jhansi section of nh27 for permanent rectification of morth identified blackspot location in the state of uttar pradesh on epc mode
Read moreJal jeevan mission kulakkada - phase ii - design, construction, commissioning and maintenance for a period of two years from the date of commissioning 3mld water treatment plant in the compound of existing water treatment plant at kulakkada using pla
Jal jeevan mission kulakkada - phase ii - design, construction, commissioning and maintenance for a period of two years from the date of commissioning 3mld water treatment plant in the compound of existing water treatment plant at kulakkada using pla
Read moreRfp for the rehabilitation and upgradation of pratapgarh - sultanpur road section of nh-330, from design chainage km 53.00 to km 96.417 to four lane with paved shoulder divided carriageway flexible pavement in the state of uttar pradesh on epc mode.
Rfp for the rehabilitation and upgradation of pratapgarh - sultanpur road section of nh-330, from design chainage km 53.00 to km 96.417 to four lane with paved shoulder divided carriageway flexible pavement in the state of uttar pradesh on epc mode.
Read moreRoutine maintenance and incident management services for two lane palia khutar section of nh 731 pkg 1a from km 0.000 to km 40.000 in the state of uttar pradesh
Routine maintenance and incident management services for two lane palia khutar section of nh 731 pkg 1a from km 0.000 to km 40.000 in the state of uttar pradesh
Read moreRequest for proposal (rfp) for appointment of a technology partner for maintenance, support, development of additional functions and ai integration on the abhilekh patal portal
Request for proposal (rfp) for appointment of a technology partner for 
 maintenance, support, development of additional functions and ai integration 
 on the abhilekh patal portal
Read moreDevelopment, operation and maintenance of wayside amenities 3 o -m sites in uttar pradesh and 1 o-m site in odisha (4 o-m sites)nh-27/kushinagar-harihar pur/up
Development, operation and maintenance of wayside amenities 3 o -m sites in uttar pradesh and 1 o-m site in odisha (4 o-m sites)nh-27/kushinagar-gopalganj/ 355-202/rhs/ harihar pur/uttar pradesh
Read moreof your Industry type