Tender Details

Particulars Details
Title
C16 A250045 5845040033 Coupling Assembly Zlfx 6 Of Low Speed Shaft For Gn 32 S Gearbox. (Coupling Bet
Description
Organisation CHENNAI PETROLEUM Corporation Limited | Ministry of Petroleum and Natural Gas
Tender Id GEM/2025/B/6217918
Reference
Number
Tender Fee
EMD
Tender Value
Place
Link https://bidplus.gem.gov.in/all-bids
Start Date May 09, 2025 23:32
End Date

19/05/2025 ( Expired 20 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Tender Result
Tender Status: Active
Additional Information:
Buyer Details
Name: Baranikumar Munuswamy
Address: Baranikumar Munuswamy,[email protected],Chennai Petroleum Corporation Limited, Manali, Chennai,Tiruvallur,TAMIL NADU,600068,India,044-25944598-
Ministry: Ministry Of Petroleum And Natural Gas
Department: Chennai Petroleum Corporation Limited
Organisation: Chennai Petroleum Corporation Limited
Office Address: Chennai
Similar Tenders
Procurement of spares and complete assembly for sleeve coupling for dry ash lines ntpc unchahar

Procurement of spares and complete assembly for sleeve coupling for dry ash lines ntpc unchahar

Read more
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Selection of consultant for independent safety assessment (isa) of mumbai-ahmedabad high speed rail (mahsr) project

Selection of consultant for independent safety assessment (isa) of mumbai-ahmedabad high speed rail (mahsr) project

Read more
Design and construction of 05 nos various span major minor pmt bridge on open foundation with steel superstructure through type and steel girder type and 03 nos of sub structure for modular bridges bet km 49.200 to 92.400 on nimmu padam darcha road

Design and construction of 05 nos various span major minor pmt bridge on open foundation with steel superstructure through type and steel girder type and 03 nos of sub structure for modular bridges bet km 49.200 to 92.400 on nimmu padam darcha road

Read more
Lot ii package hydromechanical works for all gates and pressure shaft liners for the implementation of the 240 mw uri i stage ii h.e project, located near boniyar, uri villages in the baramulla district of ut of jammu and kashmir

Lot ii package hydro mechanical works for all gates and pressure shaft liners for the implementation of the 240 mw uri i stage ii h.e project, located near boniyar, uri villages in the baramulla district of ut of jammu and kashmir, india

Read more
Consultancy services for detailed project report (dpr) for construction of 4/6-lane ring road / bypass (180 km) to decongest nh-66 in the state of goa.

Consultancy services for detailed project report (dpr) for construction of 4/6-lane ring road / bypass (180 km) to decongest nh-66 in the state of goa.

Read more
Overhauling of condensate extraction pumps weir make and hydraulic coupling voith make for unit 3 of 3x210mw, atps anpara

Overhauling of condensate extraction pumps weir make and hydraulic coupling voith make for unit 3 of 3x210mw, atps anpara

Read more
Independent engineer services during o and m for 6 lane ahmedabad-vadodara section of nh-48 from km 6.400 to km 108.700 (102.3 km) and ahmedabad-vadodara expressway ne-1 from km 0.000 to km 93.302 (93.302 km) in the state of gujarat nhdp-v dbfot toll

Independent engineer services during o and m for 6 lane ahmedabad-vadodara section of nh-48 from km 6.400 to km 108.700 (102.3 km) and ahmedabad-vadodara expressway ne-1 from km 0.000 to km 93.302 (93.302 km) in the state of gujarat nhdp-v dbfot toll

Read more
Balance job for revival of integrated ash water recovery system of ahp at unit#6 under capex 2023-2024 at stps.

Balance job for revival of integrated ash water recovery system of ahp at unit#6 under capex 2023-2024 at stps.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise