Tender Details
About Tender
🏭 Procurement Opportunity: Gas Distribution Pipeline Project 🛠️ Oil India Limited, A Leading Public Sector Undertaking, Is Calling For Bids For The Laying Or Construction Of A 250mm Nb Diameter 3 Lpe Coated Gas Distribution Pipeline In Assam. 🗺️🏗️ 📅 Bid Submission Deadline: June 25, 2024, 11:00 Am The Project Spans From Moran Ocs To Lakwagaon Ggs Within Oil's Operational Area. Interested Bidders Must Submit An Earnest Money Deposit (Emd) Of Inr 12,82,000. Detailed Bids, Including Method Statements, Safety Plans, And Compliance With Environmental And Safety Regulations, Are Expected. Keywords: Gas Distribution Pipeline, Oil India Limited, Public Sector Undertaking, Infrastructure Project, Assam, Construction, Bidding, EmdParticulars | Details |
---|---|
Title |
Laying Or Construction Of 250mm Nb Diameter 3 Lpe Coated Gas Distribution Pipeline From Moran Ocs To Lakwagaon Ggs In Oi Ls Operational Area In The State Of Assam
|
Description |
Laying Or Construction Of 250mm Nb Diameter 3 Lpe Coated Gas Distribution Pipeline From Moran Ocs To Lakwagaon Ggs In Oi Ls Operational Area In The State Of Assam
|
Organisation | Oil India Limited | Public Sector Undertakings |
Tender Id | T1607282 |
Reference Number |
CDO6639P25 |
Tender Fee | 0 |
EMD | 12.82 Lakh |
Tender Value | |
Place | Assam |
Link | https://www.oil-india.com/pdf/tenders/national/NIT_CDO6639P25.pdf |
Start Date | June 04, 2024 16:30 |
End Date |
02/07/2024 ( Expired 341 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of cc road from babadiya kala ward no.22 (pallavi nagar) to rishi nagar road in bhopal city length 1.00 km
Construction of cc road from babadiya kala ward no.22 (pallavi nagar) to rishi nagar road in bhopal city length 1.00 km
Read moreWork of laying pipeline as per requirement at various places in the central area from achhnera road to ludhawai toll plaza under the jurisdiction of executive engineer ii in the authority area. (annual)
Work of laying pipeline as per requirement at various places in the central area from achhnera road to ludhawai toll plaza under the jurisdiction of executive engineer ii in the authority area. (annual)
Read moreGiddalur nagara panchayat - bps2019 lrs 2020 grant - drilling of 165mm dia borewell fixing of 7.50 hp motor pump at rtc depo oppsite site area and laying of distribution net work from nandyala vara lakshmi house (d.no 8-17-78/6 to kasireddy house (d.no 8-17-50) in ward no 1
Giddalur nagara panchayat - bps2019 lrs 2020 grant - drilling of 165mm dia borewell fixing of 7.50 hp motor pump at rtc depo oppsite site area and laying of distribution net work from nandyala vara lakshmi house (d.no 8-17-78/6) to kasireddy house (d.no 8-17-50) in ward no 1
Read moreConstruction of roads, link roads, pathways or any other road with or without drainage system (construction of street in mc area from ward no. 1 to 29)
Construction of roads, link roads, pathways or any other road with or without drainage system (construction of street in mc area from ward no. 1 to 29)
Read moreLaying & construction of 4, 6 nb underground & above ground steel pipeline network & associated works at district at angul & dhenkanal ga- odisha
Laying, construction of 6 & 4 nb underground and above ground steel pipeline network & associated works for cgd infrastructure in the geographical area of angul & dhenkanal
Read moreLaying of hdpe pipeline and formation of gravel
Laying of hdpe pipeline and formation of gravel and laying of wet mix and construction of cc drain from h.no.16-2-209 to end of the road and 16-2-189/1/3/a/2 to 16-2-189/1/9 and various place at kareemabad, warangal in div.no.32 (general funds 2024-25)
Read moreConstruction of footpath, d...
Construction of footpath, drain and laying of shoulder tiles along the road asid 1086 from kc cinema road to mulla hotel and asid 1088 from bhagat singh chowk to bk chowk in nit area, faridabad.
Read moreShifting of iron elimination plant from its existing position behind the pump house and construction of new foundation and drain to place the same and distribution pipeline laying at the premises of power house complex, wbsedcl, siliguri
Shifting of iron elimination plant from its existing position behind the pump house and construction of new foundation and drain to place the same and distribution pipeline laying at the premises of power house complex, wbsedcl, siliguri
Read moreLaying distribution main pipe line from 2nd pump house to distribution system, repairing of damaged fhtc, construction of valve chembers and its allied works of sasra pwss in gopiballavpur-i block within jhargram district under jhargram division, phe
Laying distribution main pipe line from 2nd pump house to distribution system, repairing of damaged fhtc, construction of valve chembers and its allied works of sasra pwss in gopiballavpur-i block within jhargram district under jhargram division, phe
Read moreLaying of 100mmdia di water supply pipeline in unserved area for providing water supply from p.no.15 to p.no.93 in road no.9,sri rama krishna nagar colony,hayathnagar under kamalanagar section,sd-ii,om divn-xi
Laying of 100mmdia di water supply pipeline in unserved area for providing water supply from p.no.15 to p.no.93 in road no.9,sri rama krishna nagar colony,hayathnagar under kamalanagar section,sd-ii,o and m divn-xi
Read moreof your Industry type