Tender Details
Particulars | Details |
---|---|
Title |
Monsoon Preparedness Work In Stage 2 Ash Dyke Of Tstps, Kaniha
|
Description |
Monsoon Preparedness Work In Stage 2 Ash Dyke Of Tstps, Kaniha
|
Organisation | NTPC Limited | Public Sector Undertakings |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 1 Lakh |
Tender Value | |
Place | Talcher Super Thermal Power Station |
Link |
AAAAAAAAAA Login to view |
Start Date | May 17, 2025 23:30 |
End Date |
24/05/2025 ( 5 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Phase-2 - driver and final stage amplifiers for 2 sets of
Phase-2 - driver and final stage amplifiers for 2 sets of
 iter icrf sources
Read moreImprovement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr
Improvement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr
Read moreConsultancy services for authoritys engineer for supervision of construction of four lane of chausa_buxar bypass from km 45.000 to km 65.915 (package 2) of nh 319a in the state of bihar on epc mode.
Consultancy services for authoritys engineer for supervision of construction of four lane of chausa_buxar bypass from km 45.000 to km 65.915 (package 2) of nh 319a in the state of bihar on epc mode.
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad design ch km 46 440 to 78 358 section of nh 752 h in the state of maharashtra on epc mode
Read moreRoutine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate
Routine maintenance and incident management work of four lane talaja- mahua- kagvadar section of nh-8e (new nh-51) from km 53.585 to km 139.915 (design chainage from km 54.990 to km 140.470) in the state of gujarat (pkg-ii and pkg-iii) on item rate
Read moreRfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Rfp for the work of widening and strengthening from km 0.000 to km 38.853 of nh-330d (sitapur to kurain section) to two lane with paved shoulder configuration under epc mode in the state of uttar pradesh.
Read moreConstruction of 220kv and 132kv transmission lines associated with 220kv gss betina (dist jaisalmer) in raj incl. survey, supply of all equipment/materials, erection (incl. civil work), testing and commissioning (turnkey project) bn9019002503
Construction of 220kv and 132kv transmission lines associated with 220kv gss betina (dist jaisalmer) in raj incl. survey, supply of all equipment/materials, erection (incl. civil work), testing and commissioning (turnkey project) bn9019002503
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to 2l with ps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of mandla - nainpur section of nh 543 from km 190/400 to km 236/500 to 2l with ps configuration in the state of madhya pradesh on epc mode
Read moreBalance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Balance work for rehabilitation of landslide location along with slope protection and drainage improvement at paglajhora on nh-55 from km 43.500 to km 43.950 in phase-i, in darjeeling district of west bengal -job no. 110-wb-2024-25-564.
Read moreRepair and rehabilitation of br no. 316/1, 331/1, 332/1, 338/1, 341/1, 354/2, 361/2 on nh 15 under annual plan for the year 2024-25 under pwd under nagaon nh division, nagaon in the state of assam on epc mode.(job no br/15/as/2024-25/284).
Repair and rehabilitation of br no. 316/1, 331/1, 332/1, 338/1, 341/1, 354/2, 361/2 on nh 15 under annual plan for the year 2024-25 under pwd under nagaon nh division, nagaon in the state of assam on epc mode.( job no br/15/as/2024-25/284).
Read moreof your Industry type