Tender Details
Particulars | Details |
---|---|
Title |
Nhidcl/Ro/An/Fy 2024 25/07
|
Description |
Special Repair Of Nh 04 Through Provision Of Road Safety Furniture And Other Miscellaneous Works In The Stretch From Km 12.00 To Km 45.00 (Excluding Km 21.00 To Km 28.00) In The Ut Of A And N Islands On Percentage Rate Basis In The Fy 2024 25
|
Organisation | National Highways and Infrastructure Development Corporation | Central Govt. Ministry/Department |
Tender Id | 2025_NHIDC_851282_1 |
Reference Number |
NHIDCL/RO/AN/FY 2024-25/07 |
Tender Fee | 11800 |
EMD | 5.93 Lakh |
Tender Value | |
Place | NHIDCL RO SRI VIJAYA PURAM |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=894872 |
Start Date | March 01, 2025 14:30 |
End Date |
20/03/2025 ( Expired 59 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Strengthening/ overlaying of the existing bituminous surface in thanjavur - trichy section from km 128.480 to km 136.490 of nh-83 (nh-67) in the state of tamil nadu on item rate (percentage) basis
Strengthening/ overlaying of the existing bituminous surface in thanjavur - trichy section from km 128.480 to km 136.490 of nh-83 (nh-67) in the state of tamil nadu on item rate (percentage) basis
Read moreStrengthening of tumsar to bhandara section of nh-543k from km 82.00 to km 112.00 (excluding section from km 108.00 to 110.00) on epc mode in the state of maharashtra. total length 28.00 km
Strengthening of tumsar to bhandara section of nh-543k from km 82.00 to km 112.00 (excluding section from km 108.00 to 110.00) on epc mode in the state of maharashtra. total length 28.00 km
Read moreO and mincluding routine maintenance and incident management of four lane nagpur wainganga bridge section from km 498.000 to km 544.200 of nh-53 in the state of maharashtra on item rate percentage.
O and mincluding routine maintenance and incident management of four lane nagpur wainganga bridge section from km 498.000 to km 544.200 of nh-53 in the state of maharashtra on item rate percentage.
Read moreRoutine maintenance including incident management (excluding ambulance services) and safety improvements for nellore bypass (4l length of 14.668 km) section of nh-16 and badvel to chunchuluru section (2l length 23.645 km) of nh-67 in the state of ap.
Routine maintenance including incident management (excluding ambulance services) and safety improvements for nellore bypass (4l length of 14.668 km) section of nh-16 and badvel to chunchuluru section (2l length 23.645 km) of nh-67 in the state of ap.
Read morePeriodic overlay and strengthening of pavement from km 175 to km 252 of kashipur sitarganj section of nh 74 in the state of uttar pradesh and uttarakhand on item rate percentage basis
Periodic overlay and strengthening of pavement from km 175 to km 252 of kashipur sitarganj section of nh 74 in the state of uttar pradesh and uttarakhand on item rate percentage basis
Read moreRepair and maintenance works on damaged sections of 4-lane ahmedabad-godhra section of nh-47 from km 60.00 to km 105.00 (length 45.0 km) in the state of gujarat on item rate (percentage) basis at the risk and cost of contractor
Repair and maintenance works on damaged sections of 4-lane ahmedabad-godhra section of nh-47 from km 60.00 to km 105.00 (length 45.0 km) in the state of gujarat on item rate (percentage) basis at the risk and cost of contractor
Read moreRepair and maintenance works on damaged sections of 4-lane elevated corridor in deesa town between km 565.85 to km 569.60 (length 3.75 km) on east-west corridor of nh-27 (old nh-14) in gujarat on item rate (percentage) basis at risk and cost of contr
Repair and maintenance works on damaged sections of 4-lane elevated corridor in deesa town between km 565.85 to km 569.60 (length 3.75 km) on east-west corridor of nh-27 (old nh-14) in gujarat on item rate (percentage) basis at risk and cost of contr
Read moreConstruction of balance works for 4 lane palanpur-radhanpur-samakhiyali section of nh-27 from km 430.10 to km 536.00 in the state of gujarat on tot mode (tot bundle-5a2) on item rate (percentage) basis at the risk and cost of concessionaire
Construction of balance works for 4 lane palanpur-radhanpur-samakhiyali section of nh-27 from km 430.10 to km 536.00 in the state of gujarat on tot mode (tot bundle-5a2) on item rate (percentage) basis at the risk and cost of concessionaire
Read moreShort term maintenance of four laning of parwanoo solan section of nh 22 now nh 05 from km 67000 to km 106139 under nhdp phase iii in the state of himachal pradesh on item rate percentage basis
Short term maintenance of four laning of parwanoo solan section of nh 22 now nh 05 from km 67000 to km 106139 under nhdp phase iii in the state of himachal pradesh on item rate percentage basis
Read morePrive long term safety measures for slope protection at dukkar khind chandani chowk and provision of street lighting at accident spots on pune satara section of nh 48 from km 725 000 to km 865 350 in the state of maharashtra
Prive long term safety measures for slope protection at dukkar khind chandani chowk and provision of street lighting at accident spots on pune satara section of nh 48 from km 725 000 to km 865 350 in the state of maharashtra
Read moreof your Industry type