Tender Details
Particulars | Details |
---|---|
Title |
Repairing Of (A) 03 Nos. Magnetic Amplifier Units (Hoist, Crowd And Swing/Propel) And (B) Repairing Of Vcb Assembly And (C) Reapiring Of Isolator Assembly Of Ekg 5 A Shovel Sl. No. 561 Of Kedla Ocp
|
Description |
Repairing Of (A) 03 Nos. Magnetic Amplifier Units (Hoist, Crowd And Swing/Propel) And (B) Repairing Of Vcb Assembly And (C) Reapiring Of Isolator Assembly Of Ekg 5 A Shovel Sl. No. 561 Of Kedla Ocp.
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_CCL_316550_1 |
Reference Number |
PE(X)/KOCP/NIT/24-25/05 Dated -03.09.2024 |
Tender Fee | 0 |
EMD | 4100 |
Tender Value | |
Place | Kedla OCP |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=328036 |
Start Date | September 03, 2024 19:30 |
End Date |
11/09/2024 ( Expired 244 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Loading, transportation and unloading of ck300d shovel m/c sl. no. b-768/ exc-2940 from dhori area to sirka ocp, argada area. using low bed trailer.
Loading, transportation and unloading of ck300d shovel m/c sl. no. b-768/ exc-2940 from dhori area to sirka ocp, argada area. using low bed trailer.
Read moreComplete repairing / overhauling of both side (lhs and rhs), 02 nos. propel gearbox assembly (part no. 4106002575) with providing of spares of be-195, 10 m3 rope shovel working at bina project.
Complete repairing / overhauling of both side (lhs and rhs), 02 nos. propel gearbox assembly (part no. 4106002575) with providing of spares of be-195, 10 m3 rope shovel working at bina project.
Read moreRepairing of 02 nos. welding transformers 40kva and repairing of 02 transformers 63kva, 3.3kv/220v for ekg shovel of tapin north ocp.
Repairing of 02 nos. welding transformers 40kva and repairing of 02 transformers 63kva, 3.3kv/220v for ekg shovel of tapin north ocp.
Read moreRepairing of cracked and bended portion of chassis and platform and (b) repairing of mast rest assembly, air cleaner housings, railings and welding of 04 nos. jack pads of idm 30 drill machine sl. no. 757 of jharkhand ocp.
Repairing of cracked and bended portion of chassis and platform and (b) repairing of mast rest assembly, air cleaner housings, railings and welding of 04 nos. jack pads of idm 30 drill machine sl. no. 757 of jharkhand ocp.
Read moreRepairing of (a) propeller shaft bearing housing, its foundation and prg box foundation (b) cracked and bended rh stand of hoist drum in ekg 5a shovel sl. no. 596 of jharkhand ocp.
Repairing of (a) propeller shaft bearing housing, its foundation and prg box foundation (b) cracked and bended rh stand of hoist drum in ekg 5a shovel sl. no. 596 of jharkhand ocp.
Read moreRepairing of isolator, vcb and main transformer 63 kva, 3.3 kv alongwith magnetic amplifiers -03 nos. (hoist, crowd and swing/ propel) in hmb-581 shovel of jharkhand ocp
Repairing of isolator, vcb and main transformer 63 kva, 3.3 kv alongwith magnetic amplifiers -03 nos. (hoist, crowd and swing/ propel) in hmb-581 shovel of jharkhand ocp.
Read moreRepairing replacement of steering clutch assembly both sides denting of operator cabin fabrication of upper carrier roller foundation 03 nos along with repairing of end bit and cutting edge of blade assembly of dozer sl no 11900 make beml model bd355
Repairing replacement of steering clutch assembly both sides denting of operator cabin fabrication of upper carrier roller foundation 03 nos along with repairing of end bit and cutting edge of blade assembly of dozer sl no 11900 make beml model bd355
Read moreRepairing replacement of swing gear pinion assembly denting fabrication of er weight repairing of bucket cylinder assembly and its fitment along with fitment of 02 nos cabing glass of lnt ck 300 hydraulic shovel sl no b782 working at ttk ocp und
Repairing replacement of swing gear pinion assembly denting fabrication of er weight repairing of bucket cylinder assembly and its fitment along with fitment of 02 nos cabing glass of lnt ck 300 hydraulic shovel sl no b782 working at ttk ocp und
Read moreRepairing of front wall, base plate of bucket assembly and replacement of cabin glass in ekg shovel sl. no. 554 tapin north ocp.
Repairing of front wall, base plate of bucket assembly and replacement of cabin glass in ekg shovel sl. no. 554 tapin north ocp.
Read moreRepairing of two nos take up wheels eye housing (as float) by line boring with fitting of bushes into ekg shovel sl. no. 576 working at ilbl ocp, lakhanpur area, mcl.
Repairing of two nos take up wheels eye housing (as float) by line boring with fitting of bushes into ekg shovel sl. no. 576 working at ilbl ocp, lakhanpur area, mcl.
Read moreof your Industry type