Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Amc For Controlling Leakage And Seepage In Metro Stations And Its Ancillary Structures, Tunnels And Maintenance Of Drainage System Of Viaduct From Udb To Hcc Section Of L 2 South. (For 03 Years).
|
| Description |
Amc For Controlling Leakage And Seepage In Metro Stations And Its Ancillary Structures, Tunnels And Maintenance Of Drainage System Of Viaduct From Udb To Hcc Section Of L 2 South. (For 03 Years).
|
| Organisation | Delhi Metro Rail Corporation Limited | Central Govt. Ministry/Department |
| Tender Id | 2024_DMRC_829067_1 |
|
Reference Number |
OCM-1724 |
| Tender Fee | 5900 |
| EMD | 87940 |
| Tender Value | |
| Place | New Delhi |
| Link |
View Original Tender Notice
https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=871186 |
| Start Date | November 01, 2024 14:30 |
| End Date |
Expired
06/11/2024
Expired 605 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repair of viaduct walkway and subsequent painting with anti-carbonation paint from qutub minar to millennium city centre gurugram metro stations of line-2 (2 years).
Repair of viaduct walkway and subsequent painting with anti-carbonation paint from qutub minar to millennium city centre gurugram metro stations of line-2 (2 years).
Read moreComprehensive maint including day to day online complaint mgmt system/offline orders with scope of repair of leakage/seepage in any point of the external and all misc b/r and e/m work etc in otm accn at ratnuchak mil stn under ge kaluchak
Comprehensive maint including day to day online complaint mgmt system/offline orders with scope of repair of leakage/seepage in any point of the external and all misc b/r and e/m work etc in otm accn at ratnuchak mil stn under ge kaluchak
Read moreMaintenance contract for inspection and rectification/ replacement of bearing, grout and bed blocks from jw to dwarka mor (excluding) of line-3 in phase-i section (lot-3).
Maintenance contract for inspection and rectification/ replacement of bearing, grout and bed blocks from jw to dwarka mor (excluding) of line-3 in phase-i section (lot-3).
Read moreCleaning of existing road gullies and allied structures for storm water drainage in the area under the jurisdiction of sde sewerage sub division no. 1 chandigarh at sector 16,17,22,23,24,10 (part) chandigarh for 3 months (ch. to 2215 (np) urban water
Cleaning of existing road gullies and allied structures for storm water drainage in the area under the jurisdiction of sde sewerage sub division no. 1 chandigarh at sector 16,17,22,23,24,10 (part) chandigarh for 3 months (ch. to 2215 (np) urban water
Read moreProject management consultancy services for up-gradation of instrumentation system of cpp units (6, 7 and 8) from existing contronic-3 system to dcs based system and installation of electro hydraulic governing system in cpp turbines
Project management consultancy services for up-gradation of instrumentation system of cpp units (6, 7 and 8) from existing contronic-3 system to dcs based system and installation of electrohydraulic governing system in cpp turbines.
Read moreConsultancy work for preparation of detailed project report (dpr) including land acquisition and detailed design and drawings of all required structures coming in alignment for construction of a new four lane road from madarpur road to new riico btp
Consultancy work for preparation of detailed project report (dpr) including land acquisition and detailed design and drawings of all required structures coming in alignment for construction of a new four lane road from madarpur road to new riico btp
Read moreAnnual maintenance contract of 02 number 25kw industrial air conditioner installed in 24 96 draglines saurav and gaurav of bina project for 02 years. (work to be carried out at ncl site).
Annual maintenance contract of 02 number 25kw industrial air conditioner installed in 24 96 draglines saurav and gaurav of bina project for 02 years. (work to be carried out at ncl site).
Read moreConsultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Consultancy services for authoritys engineer for supervision of work of upgradation and reconstruction of sirmaur-dabhaura section of nh-135b from km 36/700 to km 73/813 to 2lps configuration in the state of madhya pradesh on epc mode
Read moreConsultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Consultancy services for ae for supervision of imp. and upgradation to 2 lane with ps configuration from existing km 7.410 to km56.245(design chainage km0.000 to km49.235) hadia chauraha to karmaini ghat section ofnh328 in the state of up on epc mode
Read moreConstruction and maintenance of road from l223-tangarbahal to saradhapasi baghajantiasahi road under pmgsy-iv batch-i for the package no.or-17-673 in the district of keonjhar.
Construction and maintenance of road from l223-tangarbahal to saradhapasi baghajantiasahi road under pmgsy-iv batch-i for the package no.or-17-673 in the district of keonjhar.
Read moreof your Industry type