Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Belrayan Boiler No 1,2,3,4 And 5 Wet Scrubber Ash Removal Work
|
| Description |
Belrayan Boiler No 1,2,3,4 And 5 Wet Scrubber Ash Removal Work
|
| Organisation | Government of Uttar Pradesh |
| Tender Id | 2023_SSCML_859597_1 |
|
Reference Number |
BELRAYAN 1299/PO/Gen-6/2023-24 DT 04.11.2023 |
| Tender Fee | 354 |
| EMD | 6000 |
| Tender Value | - |
| Place | SARJOO SAHKARI CHINI MILLS LTD, BELRAYAN KHERI |
| Link |
View Original Tender Notice
https://etender.up.nic.in |
| Start Date | November 04, 2023 21:30 |
| End Date |
Expired
09/11/2023
Expired 1074 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - removing ash from the wet scrubber removing ash from the wet scrubber buyer
Repair, maintenance, and installation of plant/ systems/equipments (version 2) - removing ash from the wet scrubber removing ash from the wet scrubber buyer
Read moreRemoval of technological waste from boiler furnace seal area, cpp dry ash silo system area including compressor and panel room, seal air blower room and air compressor room of cpp boiler
Removal of technological waste from boiler furnace seal area, cpp dry ash silo system area including compressor and panel room, seal air blower room and air compressor room of cpp boiler
Read moreProcurement of bottom ash and wet ash system spares for overhauling of u-1 and 2 at bktps.
Procurement of bottom ash and wet ash system spares for overhauling of u-1 and 2 at bktps.
Read moreAnnual running contract for operation and maintenance of automated plc controlled comprehensive hydropneumatic wet and dry vacuum based ash handling system including ash silos and ash water recovery system of 2x600 mw units, rgtpp, khedar, hisar
Annual running contract for operation and maintenance of automated plc controlled comprehensive hydropneumatic wet and dry vacuum based ash handling system including ash silos and ash water recovery system of 2x600 mw units, rgtpp, khedar, hisar
Read moreTtps mechii ahp ash slurry disposal lines of unit iv v scrapping removal of ash slag under the culverts near unit iv v entrance 457 5 e road crossing and cleaning of pipes in all ash slurry disposal lines
Ttps mechii ahp ash slurry disposal lines of unit iv v scrapping removal of ash slag under the culverts near unit iv v entrance 457 5 e road crossing and cleaning of pipes in all ash slurry disposal lines
Read moreProcurement of stainless steel wire mesh, trough seal and plate and refractory anchor for bottom ash hopper installed at boiler of 1x500mw, sgtps, mppgcl, birsingpur.
Procurement of stainless steel wire mesh, trough seal and plate and refractory anchor for bottom ash hopper installed at boiler of 1x500mw, sgtps, mppgcl, birsingpur.
Read moreProvision of concertina fencing over the boundary wall extending from piyala gate to the wet ash disposal lines, including a part chain-link fencing.job no. 961 /dpps.
Provision of concertina fencing over the boundary wall extending from piyala gate to the wet ash disposal lines, including a part chain-link fencing.job no. 961 /dpps.
Read moreRemoval of dredged ash/silt/debris and other deposits from the banks of kosasthalaiyar river in the area between western side of kosasthalaiyar river and railway crossing at northern and southern side of ash slurry pipe line road
Removal of dredged ash/silt/debris and other deposits from the banks of kosasthalaiyar river in the area between western side of kosasthalaiyar river and railway crossing at northern and southern side of ash slurry pipe line road
Read moreTtps operation circle mpm i unit iii removal of all the damaged insulation in the hot primary air ducts from airpreheaters to mills and insulating the duct with lrb wool mattresses and cladding with gi sheet of 0.63 mm thickness and removal of ash
Ttps operation circle mpm i unit iii removal of all the damaged insulation in the hot primary air ducts from airpreheaters to mills and insulating the duct with lrb wool mattresses and cladding with gi sheet of 0.63 mm thickness and removal of ash
Read moreof your Industry type