Tender Details
Particulars | Details |
---|---|
Title |
Construction Of Road By Way Of Providing And Laying Wmm And 25 Mm Thick Ogpc On Hazuri Bagh Near Ho Neeraj Gupta Talab Tillo
|
Description |
Construction Of Road By Way Of Providing And Laying Wmm And 25 Mm Thick Ogpc On Hazuri Bagh Near Ho Neeraj Gupta Talab Tillo
|
Organisation | PWD | State Govt. and UT |
Tender Id | 2024_PWDJK_245573_1 |
Reference Number |
eNIT 78 of 2023-24 Dated 22-02-2024 |
Tender Fee | 600 |
EMD | 6360 |
Tender Value | |
Place | Jammu |
Link | https://jktenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=718468 |
Start Date | February 22, 2024 19:30 |
End Date |
27/02/2024 ( Expired 439 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Rectification of blackspot through long term measures by construction of 3-lane unidirectional vup with service road near roladungri at km 326.570 (black spot id gj-02-129) on nh-48 in the state of gujarat on epc mode
Rectification of blackspot through long term measures by construction of 3-lane unidirectional vup with service road near roladungri at km 326.570 (black spot id gj-02-129) on nh-48 in the state of gujarat on epc mode
Read moreConstruction of vup including approaches near naibag (blackspot id no.ga-(02)-006) at km. 485.345 on nh-66 in the state of goa on epc mode under road safety annual plan 2024-25
Construction of vup including approaches near naibag (blackspot id no.ga-(02)-006) at km. 485.345 on nh-66 in the state of goa on epc mode under road safety annual plan 2024-25
Read moreP and l of dbm 7.50 cm, bc 4.00 cm with hmp mix, laying by p/finisher and including cleaning of rd surface, applying p/coat and t/coat, road marking 2.5 mm thick for surf wks bet km 98.5 and km 107.2 on rd birdhwal-pugal-bajju under 101 rcc/49 brtf
P and l of dbm 7.50 cm, bc 4.00 cm with hmp mix, laying by p/finisher and including cleaning of rd surface, applying p/coat and t/coat, road marking 2.5 mm thick for surf wks bet km 98.5 and km 107.2 on rd birdhwal-pugal-bajju under 101 rcc/49 brtf
Read moreSurfacing works of gsb 15 cm thick wbm 75 mm thick dbm 50 mm thick and bc 40 mm thick with tack coat and prime coat as per morth specification between km 0.000 to km 14.350 on puwarti gomaguda road
Surfacing works of gsb 15 cm thick wbm 75 mm thick dbm 50 mm thick and bc 40 mm thick with tack coat and prime coat as per morth specification between km 0.000 to km 14.350 on puwarti gomaguda road
Read moreProviding and laying and compaction of wbm, sand blanketing, ilcb (m50 grade) and casting of edge block in between km 0.910 to km 12.00 on nelya- dhaula road for surfacing works under 42 brtf of project vartak in arunachal pradesh
Providing and laying and compaction of wbm, sand blanketing, ilcb (m50 grade) and casting of edge block in between km 0.910 to km 12.00 on nelya- dhaula road for surfacing works under 42 brtf of project vartak in arunachal pradesh
Read moreConstruction of cc road ward no. 23 near house of bind sardar, near house of subhash gupta and near house of ajju gupta shahdol as per nit and estimate
Construction of cc road ward no. 23 near house of bind sardar, near house of subhash gupta and near house of ajju gupta shahdol as per nit and estimate
Read moreConstruction of link road to sanit beema (by way of r/wall , b/wall and s/drain). under capex.
Construction of link road to sanit beema (by way of r/wall , b/wall and s/drain). under capex.
Read moreConstruction of road by providing soling and full grout at aksan in v.p. madkai of marcaim constituency. ( under tribal sub - plan).
Construction of road by providing soling and full grout at aksan in v.p. madkai of marcaim constituency. ( under tribal sub - plan).
Read moreProviding and laying of 30 mm thick (consolidated) bituminous concrete layer on road sector between km 15.00 to km 42.00 at different stretches on road pithoragarh-tawaghat and tack coat with bitumen emulsion over existing surface, correction work w
Providing and laying of 30 mm thick (consolidated) bituminous concrete layer on road sector between km 15.00 to km 42.00 at different stretches on road pithoragarh-tawaghat and tack coat with bitumen emulsion over existing surface, correction work w
Read moreCridp work -2024-25 soil slope stabilizationkm.44.8 iii top of hill side
Providing soilslope stabilization work and protective work at km.44.8 slopelength50m of ooty kotagiri mettupalayam sathy gobi erode road&#x0d construction of breast wall at km.44.8 iii top of hill sideofooty kotagiri mettupalayamsathygobi erode road
Read moreof your Industry type