Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Kit Of Clamp V Band Consisting Of 02 Items For 1400 Hp Demu/Dpc
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 106475408 |
|
Reference Number |
20242160 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | Kolkata |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/supply/pdfdocs/102024/106475408/viewNitPdf_4717209.pdf |
| Start Date | September 17, 2024 15:56 |
| End Date |
Expired
14/10/2024
Expired 729 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Gasket,gasket,cord,buffer,diaphragm,gasket,hose 25 mm,hose 10 mm,hose 18 mm,clamp patti band
Gasket,gasket,cord,buffer,diaphragm,gasket,hose 25 mm,hose 10 mm,hose 18 mm,clamp patti band
Read moreOver head wire rope suspension assy consisting of 6 mm galvanised wire rope‘ d’ link rope clamp
Over head wire rope suspension assy consisting of 6 mm galvanised wire rope‘ d’ link rope clamp
Read moreAlternator 24 v 75 amp,generator assy,bearing,trim door rh,clamp hose,bush,spark plug
Alternator 24 v 75 amp,generator assy,bearing,trim door rh,clamp hose,bush,spark plug
Read moreSupply of various sizes of orifices for hp 803 mills in units iv and v
Supply of various sizes of orifices for hp 803 mills in units iv and v
Read moreTarget 2026-27- fabrication of 11 kv v cross arm 7000 nos,1.8m c x arms 1400 nos,2.4m c x arms 1400 nos,3m c x arms 850 nos,4 line c x arms 13000 nos,2 line c x arms 10000 nos,16mm dia lt stay rod 8000 nos. at mf1 angamaly.
Target 2026-27-fabrication of 11 kv v cross arm 7000 nos,1.8m c x arms 1400 nos,2.4m c x arms 1400 nos,3m c x arms 850 nos,4 line c x arms 13000 nos,2 line c x arms 10000 nos,16mm dia lt stay rod 8000 nos. at mf1 angamaly.
Read moreTtps mech ii bm unit v renewal of damaged hp valves and worn out boiler tubes in steam feed water lines of boiler during overhaul for the year 2026 2027
Ttps mech ii bm unit v renewal of damaged hp valves and worn out boiler tubes in steam feed water lines of boiler during overhaul for the year 2026 2027
Read moreBrake test arrangement with two spring balance of 0 to 25 kg rating,halogen incandescent lamp with holder , choke , capacitor,low-pressure sodium lamp with holder , choke , capacitor,rcc pole with accessories and materials 6 meter,magnetic flux mete 0-500 tesla,star delta strater manual for ac motor 2 to 5 hp,star delta strater soft starter for ac motor 2 to 5 hp,motor ac single phase 230 v, 50 cycles capacitor type with starter switch 1 hp.,coil winding machine manual with step arbor,shaded pole motor fractional hp, 240 v, 50 hz,single phase smart energy meter,three phase smart energy meter,variable auto transformer 0-270 v 10a air cooled,network switch 24 port,mini dongle for bluetooth devices connection
Brake test arrangement with two spring balance of 0 to 25 kg rating,halogen incandescent lamp with holder , choke , capacitor,low-pressure sodium lamp with holder , choke , capacitor,rcc pole with accessories and materials 6 meter,magnetic flux mete 0-500 tesla,star delta strater manual for ac motor 2 to 5 hp,star delta strater soft starter for ac motor 2 to 5 hp,motor ac single phase 230 v, 50 cycles capacitor type with starter switch 1 hp.,coil winding machine manual with step arbor,shaded pole motor fractional hp, 240 v, 50 hz,single phase smart energy meter,three phase smart energy meter,variable auto transformer 0-270 v 10a air cooled,network switch 24 port,mini dongle for bluetooth devices connection
Read moreRepair to roof treatment and repair sunken floor treatment and other connected items in otm and md accn aor of age b/r-v of ge (n) bathinda at bathinda mil stn
Repair to roof treatment and repair sunken floor treatment and other connected items in otm and md accn aor of age b/r-v of ge (n) bathinda at bathinda mil stn
Read moreLight,hour meter,hyd oil temp gauge,ignition switch,hyd filter,bucket tooth,bucket tooth nut bolt,hand lever assy,horn,water pump gauge,fan switch,fuel gauge,hose clamp 1 inch,hose clamp 2 inches,hose clamp 3 inches,anabond,bty terminal positive,bty terminal negative,grease nipple,bolt,latch assy comp rh,latch assy comp lh,cross bar,filter air outer,filter air ,fuel filter water separator 12,engine oil filter,pump,hyd pump assy,cabin harness for skid steer,belt v,hose assembly,head leaver assembly,element hydraulic filter
Light,hour meter,hyd oil temp gauge,ignition switch,hyd filter,bucket tooth,bucket tooth nut bolt,hand lever assy,horn,water pump gauge,fan switch,fuel gauge,hose clamp 1 inch,hose clamp 2 inches,hose clamp 3 inches,anabond,bty terminal positive,bty terminal negative,grease nipple,bolt,latch assy comp rh,latch assy comp lh,cross bar,filter air outer,filter air ,fuel filter water separator 12,engine oil filter,pump,hyd pump assy,cabin harness for skid steer,belt v,hose assembly,head leaver assembly,element hydraulic filter
Read moreOxytocin 5 units per 1 point 0 ml amp inj,methylergometrine maleate 0 point 2mg 1 ml inj,magnesium sulphate 50 percent w v inj,misoprostol 600 mcg tab,mifepristone 200 mg tab,carboprost tromethamine 250 mcg per ml 1ml inj,cord clamp
Oxytocin 5 units per 1 point 0 ml amp inj,methylergometrine maleate 0 point 2mg 1 ml inj,magnesium sulphate 50 percent w v inj,misoprostol 600 mcg tab,mifepristone 200 mg tab,carboprost tromethamine 250 mcg per ml 1ml inj,cord clamp
Read moreof your Industry type