Particulars | Details |
---|---|
Title |
A)repairing Of Head Drum Supporting Structure Of Unit No. 934 Belt Conveyor And B)dismantling, Repairing And Installation Of Take Up Bend Pulley (02 Nos.) Size 1600 X 400 X 10 Mm Of Unit No. 949 Belt Conveyor In Rlb Section Of Kathara Washery
|
Description |
A)repairing Of Head Drum Supporting Structure Of Unit No. 934 Belt Conveyor And B)dismantling, Repairing And Installation Of Take Up Bend Pulley (02 Nos.) Size 1600 X 400 X 10 Mm Of Unit No. 949 Belt Conveyor In Rlb Section Of Kathara Washery
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2024_CCL_314663_1 |
Reference Number |
PO/KTW/EnM/eTen/24-25/91 Dated-08.08.2024 |
Tender Fee | 0 |
EMD | 3400 |
Tender Value | |
Place | Kathara Washery |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=326090 |
Start Date | August 09, 2024 16:30 |
End Date |
19/08/2024 ( Expired 292 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Prive maintenance and repair of extended reject / wpc belt conveyor and its take up unit of bhojudih coal washery.
Prive maintenance and repair of extended reject / wpc belt conveyor and its take up unit of bhojudih coal washery.
Read moreRepairing , replacement and maintenance of drive unit , driven drum structure , side plates carrying rollers and rollers of conveyor gathering belt no. 1 of preparation plant at bhojudih coal washery.
Repairing , replacement and maintenance of drive unit , driven drum structure , side plates carrying rollers and rollers of conveyor gathering belt no. 1 of preparation plant at bhojudih coal washery.
Read moreRepairing/ strengthening of approaching stair case and its support for stairs going up to unit 502, c-1 and c-2 conveyor belt at moonidih coal washery.
Repairing/ strengthening of approaching stair case and its support for stairs going up to unit 502, c-1 and c-2 conveyor belt at moonidih coal washery.
Read moreFabrication and installation of new slider frame after dismantling and removal of existing worn-out slider of slidding pulley of unit c-1 and c-2 belt conveyor at moonidih coal washery.
Fabrication and installation of new slider frame after dismantling and removal of existing worn-out slider of slidding pulley of unit c-1 and c-2 belt conveyor at moonidih coal washery.
Read moreRepairing/ strengthening of take-up structure, side stairs and bracing of unit 704 belt conveyor of moonidih coal washery.
Repairing/ strengthening of take-up structure, side stairs and bracing of unit 704 belt conveyor of moonidih coal washery.
Read moreRepairing/ prive maintenance of damaged portion of structure and repairing of tailend drum along with structure of conveyor belt rc-5 at bhojudih coal washery.
Repairing/ prive maintenance of damaged portion of structure and repairing of tailend drum along with structure of conveyor belt rc-5 at bhojudih coal washery.
Read moreReplacement of 2 nos. of snub drum assembly after dismantling of existing worn-out drum for unit c-1 belt conveyor and refitting of all its accessories at moonidih coal washery.
Replacement of 2 nos. of snub drum assembly after dismantling of existing worn-out drum for unit c-1 belt conveyor and refitting of all its accessories at moonidih coal washery.
Read moreRepairing/ strengthening of base structure and other supporting structures for drive system (drive drum, snub drum, gear box and motor) of 403-a belt conveyor at moonidih coal washery.
Repairing/ strengthening of base structure and other supporting structures for drive system (drive drum, snub drum, gear box and motor) of 403-a belt conveyor at moonidih coal washery.
Read moreThe work of repairing / strengthening of base structure for drive system (gearbox, motor, drive drum and snub drum) including their supporting structure along with its alignment and repairing of its change-over gate for unit 502 belt conveyor at mnd
The work of repairing / strengthening of base structure for drive system (gearbox, motor, drive drum and snub drum) including their supporting structure along with its alignment and repairing of its change-over gate for unit 502 belt conveyor at mnd
Read moreReplacement, repairing of damaged intermediate frame and deck plates, installation of idler frame with rollers fabrication and erection of same at unit no. 1401 belt conveyor at loading section at madhuban coal washery under block-ii area, bccl .
Replacement, repairing of damaged intermediate frame and deck plates, installation of idler frame with rollers fabrication and erection of same at unit no. 1401 belt conveyor at loading section at madhuban coal washery under block-ii area, bccl .