Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Oottukuzhi Footpath Interlock Second Stage In Ward 1 Poovar Gp Pro.No 125
|
| Description |
Oottukuzhi Footpath Interlock Second Stage In Ward 1 Poovar Gp Pro.No 125
|
| Organisation | Government of Kerala |
| Tender Id | 2023_LSGD_609488_14 |
|
Reference Number |
T03/AE/LSGD/PVR2023-24 |
| Tender Fee | 335 |
| EMD | 1038 |
| Tender Value | - |
| Place | Office of the Assistant Engineer, LID EW Section, |
| Link |
View Original Tender Notice
https://etenders.kerala.gov.in |
| Start Date | October 09, 2023 15:30 |
| End Date |
Expired
18/10/2023
Expired 1093 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Maintenence of manchadi road second stage in manalur gp
Maintenence of manchadi road second stage in manalur gp
Read moreImprovement works to posolige banthadi megina belinja road-second stage
Improvement works to posolige banthadi megina belinja road-second stage
Read moreMaintenence of karamuck 4 cent colony road second stage in manalur gp
Maintenence of karamuck 4 cent colony road second stage in manalur gp
Read moreAnnual plan 2026-27, pro.no 289-kallukulam - kallarikkum vila colony road maintenance second reach ward 2
Annual plan 2026-27, pro.no 289-kallukulam - kallarikkum vila colony road maintenance second reach ward 2
Read moreAnnual plan-pro.no.128/27 construction of cheriyakandoth cheruvatham kandy footpath in atholi gp-general civil work
Annual plan-pro.no.128/27 construction of cheriyakandoth cheruvatham kandy footpath in atholi gp-general civil work
Read moreAnnual plan-2026-27- p.no.125-26-27-chooriyatta kariyankandy unnathi footpath concreting ,side protection in vengapally gp
Annual plan-2026-27- p.no.125-26-27-chooriyatta kariyankandy unnathi footpath concreting side protection in vengapally gp
Read moreBalance integrated infrastructure including road (stage-i), footpath, sw drains, sewerline, water supply in sector-14 , 15 at kharghar, navi mumbai
Balance integrated infrastructure including road (stage-i), footpath, sw drains, sewerline, water supply in sector-14 , 15 at kharghar, navi mumbai
Read moreNew construction work of the goi chhanas motor road from the mussoorie-chakrata national highway in the chakrata constituency of dehradun district under the state sector (second phase stage-2).
New construction work of the goi chhanas motor road from the mussoorie-chakrata national highway in the chakrata constituency of dehradun district under the state sector (second phase stage-2).
Read moreUnder the state plan, new construction work of km 6 to 7 of pothig to toli motor road (total length 2.00 km) of kapkot assembly constituency of bageshwar (second phase stage-i).
Under the state plan, new construction work of km 6 to 7 of pothig to toli motor road (total length 2.00 km) of kapkot assembly constituency of bageshwar (second phase stage-i).
Read moreof your Industry type