Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Electrical Works Development Of Half Rake Siding In Up Direction At Aubr Into Full Rake Siding In Ddu/Divn.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 72496383 |
|
Reference Number |
DDU-EL-G-GS-23-24-20 |
| Tender Fee | 0 |
| EMD | 41900 |
| Tender Value | - |
| Place | Hazipur |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/012024/72496383/viewNitPdf_4421373.pdf |
| Start Date | December 26, 2023 16:44 |
| End Date |
Expired
24/01/2024
Expired 996 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply of bolt and nut of various sizes with full thread and half thread
Supply of bolt and nut of various sizes with full thread and half thread
Read moreOhe work for provision of two new full length line approx. 750 mtr. one common loop in up direction and one in dn direction at chhatna station in adra division
Ohe work for provision of two new full length line approx. 750 mtr. one common loop in up direction and one in dn direction at chhatna station in adra division
Read moreHalf sleeve t shirt,knicker,jersey full sleeve,track suit set,full sleeve t shirt,winter pant,socks summer and winter,thermal set
Half sleeve t shirt,knicker,jersey full sleeve,track suit set,full sleeve t shirt,winter pant,socks summer and winter,thermal set
Read moreConstruction of fob, pf shed and ramp in connection with the work of provision of two new full length line approx. 750 mtr. one common loop in up direction and one in dn direction at chhatna (cjn) station
Construction of fob, pf shed and ramp in connection with the work of provision of two new full length line approx. 750 mtr. one common loop in up direction and one in dn direction at chhatna (cjn) station
Read moreConstruction of full-length stabling lines by extending existing short-length hot axle siding in barlanga station yards of ranchi division.
Construction of full-length stabling lines by extending existing short-length hot axle siding in barlanga station yards of ranchi division.
Read moreBolt, hex, ms, 4.6, full, 5 by 8 in, 2.5 in with nut,bolt, hex, ms, 4.6, full, 5 by 8 in, 3 in with nut,bolt, hex, ms, 4.6, full, 5 by 8 in, 3.5 in with nut,bolt, hex, ms, 4.6, full, 5 by 8 in, 4 in with nut,bolt, hex, ms, 4.6, full, 3 by 4 in, 4 in with nut,bolt, hex, ms, 4.6, half, 3 by 4 in, 6 in with nut,bolt, hex, ms, 4.6, half, 0.5 in, 3 in with nut,bolt, hex, ms, 4.6, full, 3 by 8 in, 3 in with nut,bolt, hex, ms, 4.6, full, 5 by 16 in, 2.5 in with nut,bolt, hex, ms, 4.6, half, 5 by 8 in, 1.5 in with nut,bolt, hex, ms, 4.6, half, 0.5 in, 1.5 in with nut,bolt, hex, ms, 4.6, half, 0.5 in, 2 in with nut,bolt, hex, ms, 4.6, half, 5 by 8 in, 2 in with nut
Bolt, hex, ms, 4.6, full, 5 by 8 in, 2.5 in with nut,bolt, hex, ms, 4.6, full, 5 by 8 in, 3 in with nut,bolt, hex, ms, 4.6, full, 5 by 8 in, 3.5 in with nut,bolt, hex, ms, 4.6, full, 5 by 8 in, 4 in with nut,bolt, hex, ms, 4.6, full, 3 by 4 in, 4 in with nut,bolt, hex, ms, 4.6, half, 3 by 4 in, 6 in with nut,bolt, hex, ms, 4.6, half, 0.5 in, 3 in with nut,bolt, hex, ms, 4.6, full, 3 by 8 in, 3 in with nut,bolt, hex, ms, 4.6, full, 5 by 16 in, 2.5 in with nut,bolt, hex, ms, 4.6, half, 5 by 8 in, 1.5 in with nut,bolt, hex, ms, 4.6, half, 0.5 in, 1.5 in with nut,bolt, hex, ms, 4.6, half, 0.5 in, 2 in with nut,bolt, hex, ms, 4.6, half, 5 by 8 in, 2 in with nut
Read moreSteel sheet carbon hot rolled 2500 into 1250,steel bar carbon hot rolled flat 20 into 6m,sprayer hand anti insects,beater fire mk1,flask thermos refill half liter,fire extinguisher dry powder 2 kilogram,camoflage nets 7 point 3 into 7 point 3
Steel sheet carbon hot rolled 2500 into 1250,steel bar carbon hot rolled flat 20 into 6m,sprayer hand anti insects,beater fire mk1,flask thermos refill half liter,fire extinguisher dry powder 2 kilogram,camoflage nets 7 point 3 into 7 point 3
Read moreRope manila,para rope 10.5mm,wairejali 15x16,mannequins half body,mannequins full body,laser pointer,stop watch,camp stool,directive stand
Rope manila,para rope 10.5mm,wairejali 15x16,mannequins half body,mannequins full body,laser pointer,stop watch,camp stool,directive stand
Read moreConstruction of high level platform, station building, submersible pump, side drain and road in connection with the work of provision of two new full length line approx. 750 mtr. one common loop in up direction and one in dn direction at chhatna station.
Construction of high level platform, station building, submersible pump, side drain and road in connection with the work of provision of two new full length line approx. 750 mtr. one common loop in up direction and one in dn direction at chhatna station.
Read moreExecution of p way work and construction of rcc box bridge with jacketing in connection with the work of provision of two new full length line approx. 750 mtr. one common loop in up direction and one in dn direction at chhatna station.
Execution of p way work and construction of rcc box bridge with jacketing in connection with the work of provision of two new full length line approx. 750 mtr. one common loop in up direction and one in dn direction at chhatna station.
Read moreof your Industry type