Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Supply Of 200 Nb Ss 316 Gr Gate Valves For Sea Water Filtration Plant Of Cooling Water Pump House Ii
|
| Description |
Supply Of 200 Nb Ss 316 Gr Gate Valves For Sea Water Filtration Plant Of Cooling Water Pump House Ii
|
| Organisation | TNEB Limited | State Govt. and UT |
| Tender Id | 2025_EB_586355_1 |
|
Reference Number |
CE/TTPS/4337M |
| Tender Fee | 0 |
| EMD | 14500 |
| Tender Value | |
| Place | TTPS |
| Link |
View Original Tender Notice
https://tntenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=700392 |
| Start Date | July 28, 2025 18:30 |
| End Date |
Expired
18/08/2025
Expired 318 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repairs/ replacement of water supply pump, control valves and connected items of wellington station under ge wellington
Repairs/ replacement of water supply pump, control valves and connected items of wellington station under ge wellington
Read moreSupply of potable water from allikulam to voc wharf pump house through private water lorry for a period of one year as and when required inside green gate at vocpa.
Supply of potable water from allikulam to voc wharf pump house through private water lorry for a period of one year as and when required inside green gate at vocpa.
Read moreFabrication supply and erection of 200 nb ss 316 gr seamless pipe sch 80 fittings for sea water booster pump of filtration plant suction line in unit v at cwph ii
Fabrication supply and erection of 200 nb ss 316 gr seamless pipe sch 80 fittings for sea water booster pump of filtration plant suction line in unit v at cwph ii
Read moreSupply of 200nb ss316 gr gate valves for pressure sand filter and back wash pump discharge line in sea water filtration plant of cooling water pump house 2
Supply of 200nb ss316 gr gate valves for pressure sand filter and back wash pump discharge line in sea water filtration plant of cooling water pump house 2
Read moreSupply of 300 nb ss 316 gr gate valve for quick filling interconnection pipe line for cooling water tunnel of unit i to iii in cooling water pump house i
Supply of 300 nb ss 316 gr gate valve for quick &#x0d filling interconnection pipe line for cooling water tunnel of unit i to iii in cooling water pump house i
Read moreSupply erection and commissioning of 150 nb ss 316 gr cooling water pump emergency gland seal water line gland cooling line in unit iv at cwph ii
Supply erection and commissioning of 150 nb ss 316 gr cooling water pump emergency gland seal water line gland cooling line in unit iv at cwph ii
Read moreSupply erection and commissioning of 150 nb ss 316 gr cooling water pump emergency gland seal water line gland cooling line in unit v at cwph ii
Supply erection and commissioning of 150 nb ss 316 gr cooling water pump emergency gland seal water line gland cooling line in unit v at cwph ii
Read moreFabrication, supply, erection and commissioning of 100 nb seamless pipe and fittings for filtration plant of cooling water pump house ii
Fabrication, supply, erection and commissioning of 100 nb seamless &#x0d pipe and fittings for filtration plant of cooling water pump house ii
Read moreSupply erection and commissioning of gland cooling sea water booster pump of higher capacity 60 m3 hr with 11 kw motor for filtration plant of cooling water pump house ii
Supply erection and commissioning of gland cooling sea water booster pump of higher capacity 60 m3 hr with 11 kw motor for filtration plant of cooling water pump house ii
Read moreSupply of 200 nb and 150 nb ss 316 gr pipe fittings for seal water over head tank to glr tank of ash water pump house in unit iv and v
Supply of 200 nb and 150 nb ss 316 gr pipe fittings for seal water over head tank to glr tank of ash water pump house in unit iv and v
Read moreof your Industry type