Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Tc9756105046: Dt St Coupling, 1/2" Ss, G1 A 16,Tc9756105089: Dt St Coupling, 1" , Ss, G1 A 25,Tc97561
|
| Description |
|
| Organisation | Department of Heavy Industry | Ministry of Heavy Industries and Public Enterprises |
| Tender Id | GEM/2023/B/3753728 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://gem.gov.in/ |
| Start Date | July 28, 2023 19:20 |
| End Date |
Expired
07/08/2023
Expired 1163 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
WINTECH ENGINEERSRACHANA INDUSTRIES
Technical Evaluation Results
| S.No. | Seller Name | Offered Item | Participated On | MSE/MII Status | Status |
|---|---|---|---|---|---|
| 1 | CARLO DYNATECH INDUSTRIES | Make : OEM Model : G1A DT Title : DT COUPLING 1A SERIES | 09-08-2023 14:59:31 | MSE | Evaluated |
| 2 | EXCEL HYDRO PNEUMATICS PVT LTD | Make : EXCELOCK Model : Dt St Coupling, 1/2" Ss, G1a 16 Title : Dt St Coupling, 1/2" Ss, G1a 16 | 02-08-2023 16:09:03 | N/A | Evaluated |
| 3 | GURUNANAK ENGINEERING WORKS | Make : GNEW Model : SPIDER JOINT COUPLING STUD & NUT,GUIDR PIN SHAFT AND SPIDER FIXING Title : SPIDER JOINT COUPLING STUD & NUT, GUIDR PIN SHAFT AND SPIDER FIXING | 14-08-2023 13:11:08 | MSE | Evaluated |
| 4 | M/S RACHANA INDUSTRIES | Make : RI Model : RAI1111 Title : UNION NUT; DRG NO 04-04- 011 SIZE: M 24 | 14-08-2023 12:55:47 | MSE | Evaluated |
| 5 | NEW BHARAT ENGINEERING WORKS | Make : NEWBHARAT Model : STUD Title : STUD | 07-08-2023 13:02:28 | MSE | Evaluated |
| 6 | WINTECH ENGINEERS | Make : WINSEAL Model : WINSEAL Title : 3-PIECE DESIGN FITTINGS | 07-08-2023 13:13:22 | MSE | Evaluated |
Ordered Items & Contract Pricing
| Product | Brand | Model | Ordered Quantity | Price |
|---|---|---|---|---|
| 3-PIECE DESIGN FITTINGS | WINSEAL | WINSEAL | 500 | ₹ 442000.000 |
| UNION NUT; DRG NO 04-04- 011 SIZE: M 24 | RI | RAI1111 | 200 | ₹ 108880.000 |
| MALE CONECTOR: 1" SS NPT | RAI | RI-114 | 500 | ₹ 187300.000 |
Dt st coupling, 1inch, ss, g1a 25,dt st coupling, 3by4 inch, ss, g1a 20,dt blind sheet, size 20, ss, g1-20-8
Dt st coupling, 1inch, ss, g1a 25,dt st coupling, 3by4 inch, ss, g1a 20,dt blind sheet, size 20, ss, g1-20-8
Read moreSbd 19 dt. 16-10-25 gate53
River erosion mitigation measure by repairing and extending reclamation spur no 2 opposite border fencing near gate no 53 bop dharamparkash on left side of river ravi
Read moreSbd 18 dt. 16-10-25 gate55
River erosion mitigation measure by repairing and restoration of revetment near reclamation spur no 1 opposite border fencing near gate no 55 of bop dharamparkash on left side of river ravi
Read more452/ssm/2026(sl-16), dt. 09.10.2026
Installation of fan(221 nos.) and water purifier (66 nos.) with alied works in different schools(55 nos.) under gangarampur clrc, gangarampur block in the district of dakshin dinajpur
Read moreSbd 18 dt. 16-10-25 rd 6000
River erosion mitigation by restoring spur rd 6000 damaged during heavy flood 2025 to save c-land, border fencing, flood lights etc in kakkar complex on l/s of river ravi in district amritsar
Read moreSbd 19 dt. 16-10-25 rd 12000
River erosion mitigation measure by repair ,restoration and bringing to design section revetment and studs on u/s of spur rd 12000 at advance bundh for the safety of c-land,advance bundh and village abadies on left side of river ravi.
Read moreSbd 19 dt. 16-12-25 rd 88200
River erosion mitigation by repair of spur apron along with stud and shank portion at rd 88200 of main fpe on left side of river ravi
Read moreSbd 19 dt. 16-10-25 rd 2000
River erosion mitigation measure by repair ,restoration and bringing to design section spur at rd 2000 along with repair and restoration of revetment and t-studs on u/s of spur rd 2000 in chaharpur complex.
Read moreSbd 19 dt. 16-10-25 rd 6070
River erosion mitigation measure by repair ,restoration and bringing to design section of spur at rd 6070 of earthen bundh in chaharpur complex on left side of river ravi
Read moreSbd 18 dt. 16-10-25 rd 7550
River erosion mitigation by restoring spur rd 7550 damaged during heavy flood 2025 to save c-land, border fencing, flood lights etc in kakkar complex on l/s of river ravi in district amritsar
Read moreof your Industry type