Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Removal Of Vegetation And Wild Growth
|
| Description |
Removal Of Vegetation And Wild Growth
|
| Organisation | Defence eProcurement Portal |
| Tender Id | 2023_DRDO_610697_2 |
|
Reference Number |
P-5000/3296 |
| Tender Fee | 0 |
| EMD | 36500 |
| Tender Value | - |
| Place | MMG |
| Link |
View Original Tender Notice
https://defproc.gov.in |
| Start Date | October 25, 2023 23:00 |
| End Date |
Expired
29/11/2023
Expired 1047 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Removal of silt under the manholes for maintenance of underground draiange in vikarabad municipality under municipal general funds
Removal of silt under the manholes for maintenance of underground draiange in vikarabad municipality under municipal general funds
Read moreExpression of interest (eoi) for dismantling and disposal/removal of materials of old government rcc building in greater warangal municipal corporation
Expression of interest (eoi) for dismantling and disposal/removal of materials of old government rcc building in greater warangal municipal corporation
Read moreEstimate for jungle clearance and accumulated earth removal from km 11.215 to 20.635 of wazeerabad major under nslbc of damercherla mandal, nalgonda dist(2nd call)
Estimate for jungle clearance and accumulated earth removal from km 11.215 to 20.635 of wazeerabad major under nslbc of damercherla mandal, nalgonda dist(2nd call)
Read moreRemoval of water stagnation by laying of swd from ypr kaman to existing pipe culvert at adibatla tcs road in ward 55 adibatla adibatla circle - 15 ghmc.
Removal of water stagnation by laying of swd from ypr kaman to existing pipe culvert at adibatla tcs road in ward 55 adibatla adibatla circle - 15 ghmc.
Read moreProcurement of 33kv xlpe 3cx120 sq.mm cable for removal of one span of 33kv feeder no.13 and 14 oht lines at ocp3, chp by aws, rg-1 area
Procurement of 33kv xlpe 3cx120 sq.mm cable for removal of one span of 33kv feeder no.13 and 14 oht lines at ocp3, chp by aws, rg-1 area
Read moreEstimate for jungle clearance and accumulated earth removal on wazeerabad major, chillapur major, r1 minor, l2 minor and l2/r1 sub minors of wazeerabad major in miryalaguda mandal, nalgonda(d) .(allotted for st communities)(2nd call).
Estimate for jungle clearance and accumulated earth removal on wazeerabad major, chillapur major, r1 minor, l2 minor and l2/r1 sub minors of wazeerabad major in miryalaguda mandal, nalgonda(d) .(allotted for st communities)(2nd call).
Read moreKtps-v vi stages-civil -o m-ii - clearing of thick jungle, vegetation and bushes along the railway track at certain locations in marshalling yard and gajulagudem area in ktps v vi stages and ktps-v vi stages- civil- o m-ii- clearing of residual coal fallen from bobr wagons along the railway track at certain locations in marshalling yard of ktps v vi stages
Ktps-v vi stages-civil -o m-ii - clearing of thick jungle, vegetation and bushes along the railway track at certain locations in marshalling yard and gajulagudem area in ktps v vi stages and ktps-v vi stages- civil- o m-ii- clearing of residual coal fallen from bobr wagons along the railway track at certain locations in marshalling yard of ktps v vi stages
Read moreHiring of 1 no. 0.50 to 0.75 cu.m long boom shovel with 20 meters boom length for removal of fire coal and repair of existing ground level 16000t capacity bunkers in ocp3 chp, rg2 for a period of 100 hrs or 30 days whichever is earlier.
Hiring of 1 no. 0.50 to 0.75 cu.m long boom shovel with 20 meters boom length for removal of fire coal and repair of existing ground level 16000t capacity bunkers in ocp3 chp, rg2 for a period of 100 hrs or 30 days whichever is earlier.
Read moreSupply, installation and commissioning of a 500 kw solar central inverter with ups set and acdb along with acb arrangements and hot air duct; removal of existing 250kw inverter with duct and lt panel-1, and supervision of the entire work at the 1mwp solar plant, pjhes, revulapally
Supply, installation and commissioning of a 500 kw solar central inverter with ups set and acdb along with acb arrangements and hot air duct; removal of existing 250kw inverter with duct and lt panel-1, and supervision of the entire work at the 1mwp solar plant, pjhes, revulapally
Read moreof your Industry type