Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
๐ญ Procurement Alert: Compressor Spare Parts ๐ ๏ธ Balmer Lawrie And Company Limited, A Public Sector Undertaking, Is Seeking Bids For The Supply Of Spare Parts For Compressors Used In Its Plant Located In Asaoti. ๐ญ ๐ Bid Submission Deadline: July 15, 2024, 3:00 Pm (Local Time) The Location For The Supply Of These Spare Parts Is Faridabad. ๐ Interested Suppliers Are Requested To Submit Detailed Bids, Including Specifications, Pricing, And Delivery Schedules, By The Stipulated Deadline. ๐ Keywords: Compressor Spare Parts, Balmer Lawrie And Company Limited, Public Sector Undertaking, Procurement, Industrial Supplies, Tender, Bid Submission| Particulars | Details |
|---|---|
| Title |
Supply Of Spare Parts Of Compressor
|
| Description |
Supply Of Spare Parts Of Compressor For Our Plant At Asaoti
|
| Organisation | Balmer Lawrie and Company Limited | Public Sector Undertakings |
| Tender Id | 20262 |
|
Reference Number |
1050LM014 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | FARIDABAD |
| Link |
View Original Tender Notice
https://www.balmerlawrie.com/pages/tenderdetails/20262 |
| Start Date | July 04, 2024 23:30 |
| End Date |
Expired
15/07/2024
Expired 809 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Fabrication, supply and installation of bus ducts and associated works for upgradation of power supply system for nrg facilities
Fabrication, supply and installation of bus ducts and associated works for upgradation of power supply system for nrg facilities
Read moreSupply and commissioning of turbo ventilators for use at mws, kgm of sccl. in division no:corp-mp.
Supply and commissioning of turbo ventilators for use at mws, kgm of sccl. in division no:corp-mp.
Read moreSupply of 245kv, 3-phase, spring operated sf6 circuit breaker along with retrofitting material for 220kv switchyard of ktps-v stage under psd funds
Supply of 245kv, 3-phase, spring operated sf6 circuit breaker along with retrofitting material for 220kv switchyard of ktps-v stage under psd funds
Read moreRevamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).
Revamping the existing air conditioning system of capacity 4x100tr with latest/advance system including design, supply, erection, testing and commissioning as well as dismantling its existing system in ktps v stage (2x250mw).
Read moreStmc for maintenance of stretch from km 289.500 to km 299.000 on kota darah section of nh-52 in the state of rajasthan.
Stmc for maintenance of stretch from km 289.500 to km 299.000 on kota darah section of nh-52 in the state of rajasthan.
Read moreConsultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Consultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Read moreConsultancy services for dpr preparation for oti of nh-43, nh-543 and nh-45 (total length 25.15 km) in the state of madhya pradesh
Consultancy services for dpr preparation for oti of nh-43, nh-543 and nh-45 (total length 25.15 km) in the state of madhya pradesh
Read moreProcurement of medical equipments for hospitals in shimoga
Procurement of medical equipments for hospitals in shimoga
Read moreDate: 10.09.2026 rfp for construction arch in division no:chief engineer office, tsiic.
Date: 10.09.2026 rfp for construction arch in division no:chief engineer office, tsiic.
Read moreof your Industry type