Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Construction Of Pipe Culvert Across The Stream Flowing Through Rajendranagar On The Western Side Of Shivaji University Campus.
|
| Description |
Construction Of Pipe Culvert Across The Stream Flowing Through Rajendranagar On The Western Side Of Shivaji University Campus.
|
| Organisation | Shivaji University Kolhapur | State Govt. and UT |
| Tender Id | 2025_SUK_1169410_1 |
|
Reference Number |
2025-26-25 |
| Tender Fee | 1534 |
| EMD | 8761 |
| Tender Value | |
| Place | shivaji university kolhapur |
| Link |
View Original Tender Notice
https://mahatenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=2034044 |
| Start Date | April 16, 2025 22:30 |
| End Date |
Expired
22/04/2025
Expired 430 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Construction of new major hl bridge across river ong at km. 43.500 on nh-26 in the state of odisha on epc mode
Construction of new major hl bridge across river ong at km. 43.500 on nh-26 in the state of odisha on epc mode
Read more1 - construction of causeway / culvert at bhoikhera to bcw on berach river in uit area, chittorgarh
1 - construction of causeway / culvert at bhoikhera to bcw on berach river in uit area, chittorgarh
Read moreEngagement of user fee collection agency on the basis of cb through e-tender for ujara fee plaza for widening to 2 lane with paved shoulders and strengthening including construction of cd structures on nh-86 in the state of mp
Engagement of user fee collection agency on the basis of cb through e-tender for ujara fee plaza for widening to 2 lane with paved shoulders and strengthening including construction of cd structures on nh-86 in the state of mp
Read moreGeneral-monsoon preparedness 2026- puthukudi thodu-temporary side protection works to house no. 464 in ward no. 5 on d/s side of puthukudi culvert at puthukudi in keezhallur panchayath in mattannur constituency, kannur district-general civil work-1
General-monsoon preparedness 2026- puthukudi thodu-temporary side protection works to house no. 464 in ward no. 5 on d/s side of puthukudi culvert at puthukudi in keezhallur panchayath in mattannur constituency, kannur district-general civil work-1
Read moreComprehensive annual maintenance contract amc for different capacities different makes that is voltas hitachi daikin blue star lg and others split duct able types a c machines in the campus of vidyasagar university
Comprehensive annual maintenance contract amc for different capacities different makes that is voltas hitachi daikin blue star lg and others split duct able types a c machines in the campus of vidyasagar university
Read moreEngagement of user fee agency on the basis of competitive bidding through e-tender at sathyagala fee plaza at design km 359.800 of brt tiger reserve boundary to bangalore section of nh209 in the state of karnataka
Engagement of user fee agency on the basis of competitive bidding through e-tender at sathyagala fee plaza at design km 359.800 of brt tiger reserve boundary to bangalore section of nh209 in the state of karnataka
Read moreEngagement of user fee agency through eq on (8 nos/11 nos) fee plazas (07 no fee plazas in the state of haryana and 04 no fee plaza in the state of punjab) for project four-lane greenfield delhi-amritsar-katra expressway (ne-5) on ham
Engagement of user fee agency through eq on (8 nos/11 nos) fee plazas (07 no fee plazas in the state of haryana and 04 no fee plaza in the state of punjab) for project four-lane greenfield delhi-amritsar-katra expressway (ne-5) on ham
Read moreConstruction of a cc road and drain in ward no. 03, arya nagar, gosaiganj extending from the west of the main road, passing through the harijan basti, and connecting back to the main road
Construction of a cc road and drain in ward no. 03, arya nagar, gosaiganj extending from the west of the main road, passing through the harijan basti, and connecting back to the main road
Read moreEngagement of user fee collection agency on the basis of e quotation through e-tender at semalkhedi fee plaza at km 84.200 of ujjain jhalawar (upto rajasthan border) section of nh 552(g) in the state of madhya pradesh
Engagement of user fee collection agency on the basis of e quotation through e-tender at semalkhedi fee plaza at km 84.200 of ujjain jhalawar (upto rajasthan border) section of nh 552(g) in the state of madhya pradesh
Read moreRfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh
Read moreof your Industry type