Tender Details
Particulars | Details |
---|---|
Title |
Vpt Tsi Qln &Amp Ten Tsi Section: Clearing Of Side Drains At Isolated Locations From Km: 638.130 To 688.451 &Amp 78.000 To 98.979 In Between Pbks Sct &Amp Kky Tsi Station In Sse/P/Way/Sct Section For A Period Of One Year.
|
Description |
For Complete Deion And Other Details, Please Refer To Tender
|
Organisation | Ministry of Railways | Central Govt. Ministry/Department |
Tender Id | 77269577 |
Reference Number |
MDU-W-21-2024-02 |
Tender Fee | 0 |
EMD | 40900 |
Tender Value | |
Place | Chennai |
Link | https://www.ireps.gov.in/ireps/works/pdfdocs/102024/77269577/viewNitPdf_4706708.pdf |
Start Date | September 09, 2024 21:40 |
End Date |
01/10/2024 ( Expired 203 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Nctps i cm circle cm ii maintenance works towards the minor plastering wooden doors and pvc doors in p type quarters at vallur camp for the period of one year from 01.04.2025 to 31.03.2026.
Nctps i cm circle cm ii maintenance works towards the&#x0d minor plastering wooden doors and pvc doors in p type quarters at vallur camp for the&#x0d period of one year from 01.04.2025 to 31.03.2026.
Read moreNctps i cm circle cm i clearing and removing the ash silt deposits in all the drains around esp ahp foph and dm plant area for the period of one year from 01.04.2025 to 31.03.2026.
Nctpsi cm circle cm i clearing and removing the ash silt deposits in all the drains around esp ahp foph and dm plant area for the period of one year from 01.04.2025 to 31.03.2026.
Read moreNctps i cm circle cm ii clearing the scrub jungle and sweeping clearing of litters and dry leaves along road side in vallur camp for the period of one year from 01.04.2025 to 31.03.2026.
Nctps i cm circle cm ii clearing the scrub jungle and&#x0d sweeping clearing of litters and dry leaves along road side in vallur camp for the period&#x0d of one year from 01.04.2025 to 31.03.2026.
Read moreNctps i cm circle cm ii clearing the light jungle scrub behind p q r s t u type block and park area for the period of one year from 01.04.2025 to 31.03.2026.
Nctps i cm circle cm ii clearing the light jungle scrub&#x0d behind p q r s t u type block and park area for the period of&#x0d one year from 01.04.2025 to 31.03.2026.
Read moreCutting side slope protection with gabion wall,rcc drain between km.608/6-8 east and west side and other locations, km.644/5-6 east, km.650/4-5 e/w, km.648/9-0 under sse/p/btjl section.
For complete deion and other details, please refer to tender
Read moreSw i : bengaluru - sampige road and lottegollahalli - yelahanka section : construction of rcc side drain for a length of 4.60 km at isolated location between km 19/300 to 26/900 (dn line - 3.65 km) of bengaluru - arasikere and km 10/750-15/00 (up line - 950m) in sse/pway/ypr section. sw ii : yelahanka - bangarpet section : construction of rcc side drain for a length of 4.60 km at isolated location between km 17/000-75/200 between yelahanka - chintamani stations in sse/pway/ynk section. mainte
For complete deion and other details, please refer to tender
Read moreBengaluru - dharmavaram section : construction of rcc drain for 4.5 kms at isolated locations between km 128/700-134/700 between rangepalli (repi) - penukonda (pkd) in sse/pway/pkd section. maintenance period is 6 months
For complete deion and other details, please refer to tender
Read moreBengaluru - salem section : slope stabilization by widening of slopes of cuttings from km 50/000-100, 50/800-51/050, 51/300-500, 51/760-880 in sse/pway/tpp between muttampatti (mpc) and sivadi (szv) stations. maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreAll repairs & maintenance of p. way zonal works for a period upto 30/9/2025 from km. 334.74 to 353.80 between jajpur keonjhar road - jenapur station and km 180.00 to 147.00 on j-d line under sse(p.way)/ jajpur-keonjhar road of khurda road division.
For complete deion and other details, please refer to tender
Read moreBengaluru - sampige road section : proposed construction of rub of size 1x6x3m in lieu of lc no. 50 at km 85/800-900 between mallasandra (mlsa) - gubbi (gbb) station for double track. maintenance period is 6 months or one monsoon period whichever is later.
For complete deion and other details, please refer to tender
Read moreof your Industry type