Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Provision Of 150x100mm Tubewell In Ro Campus Bhagalpur Upto 100 Meters Development Of The Boring Connection Of Existing Boring Of Ro Building With The New Boring And Misc Civil Work
|
Description |
Provision Of 150x100mm Tubewell In Ro Campus Bhagalpur Upto 100 Meters Development Of The Boring Connection Of Existing Boring Of Ro Building With The New Boring And Misc Civil Work
|
Organisation | Department of Posts | Central Govt. Ministry/Department |
Tender Id | 2025_DOP_862973_1 |
Reference Number |
06/AE/PCSD/25-26/BGP |
Tender Fee | 0 |
EMD | 4316 |
Tender Value | |
Place | Bhagalpur RO |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=907314 |
Start Date | June 03, 2025 21:10 |
End Date |
09/06/2025 ( Expired 25 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428
1.civil works for creating storage facility to stack cable material,other electrical materials in between 132kv switchyard and mtdd lab and floor repairing 2.closing the chambers at corridor area of old building at ipr campus,bhat, gandhinagar382428
Read moreBalance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode
Balance work of up-gradation of tirora gondia section of nh 753 to two lane with paved shoulders / 4 lane in km. 87/000 to 92/152 and km. 98/100 to 105/405 total length 12/457 km in gondia district in the state of maharashtra on epc mode
Read moreIntegration of boys hostel with dmrc academy, construction of new simulator room backside of a-block dmrc academy, development of lounge area on 1st and 2nd floor of boys hostel and provision of new entry/exit at shastri park depot.
Integration of boys hostel with dmrc academy, construction of new simulator room backside of a-block dmrc academy, development of lounge area on 1st and 2nd floor of boys hostel and provision of new entry/exit at shastri park depot.
Read moreDesign, engineering, supply, erection, testing and commissioning of 220/66/33kv gis substation with complete civil works and automation at existing 220kv gis maharani bagh substation, new delhi (india) on turnkey basis.
Design, engineering, supply, erection, testing and commissioning of 220/66/33kv gis substation with complete civil works and automation at existing 220kv gis maharani bagh substation, new delhi (india) on turnkey basis.
Read moreDevelopment of new shop are...
Development of new shop area 344 to 352 with parking and s/r of mandi roads in n.g.m. at gohana, distt. sonepat ( mandi work plan 2023-24)
Read moreProvision of ups with batteries in hawk tech area, provision of geyser and associated works services in certain md accn at hawk enclave and provision of certain e/m work services for otm accn at afs bidar
Provision of ups with batteries in hawk tech area, provision of geyser and associated works services in certain md accn at hawk enclave and provision of certain e/m work services for otm accn at afs bidar
Read moreEngineering, procurement and construction(epc) of a new four lane bridge over river ganga located 50 meters upstream of the existing damage ganga bridge, along with the construction of approach roads connecting kanpur nagar to shuklaganj in unnao di
Engineering, procurement and construction(epc) of a new four lane bridge over river ganga located 50 meters upstream of the existing damage ganga bridge, along with the construction of approach roads connecting kanpur nagar to shuklaganj in unnao di
Read moreConstruction of 01 no. (gplus2) 4 unit c type building with provision of extension up to (gplus3) and its allied work at chiranjibpur colony complex under haldia area office
Construction of 01 no. (gplus2) 4 unit c type building with provision of extension up to (gplus3) and its allied work at chiranjibpur colony complex under haldia area office
Read moreAugmentation of water supply system by providing and commissioning one new tubewell in development scheme maharaja narindra enclave, patiala.
Augmentation of water supply system by providing and commissioning one new tubewell in development scheme maharaja narindra enclave, patiala.
Read moreAugmentation of water supply system by providing and commissioning one new tubewell in development scheme transport nagar, patiala.
Augmentation of water supply system by providing and commissioning one new tubewell in development scheme transport nagar, patiala.
Read moreof your Industry type