Tender Details

About Tender

🏗️ Bid Invitation: Satsiling Naaghar Khoona Motor Road Upgradation 🛣️ The National Rural Roads Development Agency (Nrrda), Under The Central Government, Invites Bids For The Upgradation Of Satsiling Naaghar Khoona Motor Road Under Package No. Ut09501 T01. 🚧 📅 Bid Submission Deadline: April 27, 2024, 1:00 Pm Tender Fee: Inr 5900 Earnest Money Deposit (Emd): Inr 11,45,000 The Project Is Located In Ee, Id, Pmgsy, Pithoragarh. Interested Contractors With Expertise In Road Construction And Upgradation Are Encouraged To Submit Detailed Bids, Including Technical And Financial Proposals, In Compliance With The Specifications And Guidelines Provided In The Tender Document. Keywords: Nrrda, Road Upgradation, Satsiling Naaghar Khoona Motor Road, Central Government, Tender, Bid, Pithoragarh, Infrastructure Development
Particulars Details
Title
Package No. Ut09501 T01 Satsiling Naaghar Khoona Motor Road Upgradation
Description
Package No. Ut09501 T01 Satsiling Naaghar Khoona Motor Road Upgradation
Organisation National Rural Roads Development Agency (NRRDA) | Central Govt. Ministry/Department
Tender Id 2024_CCUK_133073_1
Reference
Number
UT9501
Tender Fee 5900
EMD 11.45 Lakh
Tender Value
Place EE, ID, PMGSY, Pithoragarh
Link https://pmgsytendersuk.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=208954
Start Date March 19, 2024 18:30
End Date

07/05/2024 ( Expired 413 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Development of 8-lane elevated flyover at tier-1 on single pier including upgradation of ex. road to 4-6 lane with 2l service road on both sides of nashik phata to khed (km 12.190-km 42.113) section of nh (nh)-60 in the maharashtra on bot(toll) mode

Read more
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode

Read more
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode

Read more
Engineering, procurement and construction work of 04 lane railoverheadbridge, 04 lane flyover on gt road and 02 lane flyover on ghantaghar road in lieu of level crossing no. 02 special (nearjarib chowki) of kanpur-anwarganj-rawatpur railway section

Engineering, procurement and construction work of 04 lane railoverheadbridge, 04 lane flyover on gt road and 02 lane flyover on ghantaghar road in lieu of level crossing no. 02 special (nearjarib chowki) of kanpur-anwarganj-rawatpur railway section

Read more
Rehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr

Rehabilitation upgradation of existing road to 2 lane 4 lane with paved shoulders configuration of murum alur waghdari akkalkot nagansur tolnur maharashtra state border nh 548b design chainage km 289.300 to 342.890 length 52.556 km approx) distr

Read more
Construction of link between already constructed three-legged elevated rotary on amritsar taran taran road mdr103 to amritsar bhikhiwind khemkaran road nh 354 in district amritsar punjab ic construction of rob near closed lc no c 11 at km 701 betwe

Construction of link between already constructed three-legged elevated rotary on amritsar taran taran road mdr103 to amritsar bhikhiwind khemkaran road nh 354 in district amritsar punjab ic construction of rob near closed lc no c 11 at km 701 betwe

Read more
Improvement of harshila to pudkuni motor road under one time maintenance in kapkot constituency of district bageshwar.

Improvement of harshila to pudkuni motor road under one time maintenance in kapkot constituency of district bageshwar.

Read more
Providing, laying, jointing, testing and commissioning of 315 mm dia hdpe pipeline at from mahima smart city super corridor road of zone no.16 ward no.15 (as per schedule)

Providing, laying, jointing, testing and commissioning of 315 mm dia hdpe pipeline at from mahima smart city super corridor road of zone no.16 ward no.15 (as per schedule)

Read more
Construction of cc road and drain from samay gest house to purana galla mandi road and khilona machine to haweli ke piche thagan wali gali at ward no 09 tikamgarh

Construction of cc road and drain from samay gest house to purana galla mandi road and khilona machine to haweli ke piche thagan wali gali at ward no 09 tikamgarh

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise