Tender Details

Particulars Details
Title
Nit 18/23 24/W 5/Sl 2
Description
Construction And Repairing Of Concrete Road And Side Wall At Different Places Under Ward 5
Organisation Government of West Bengal
Tender Id 2023_MAD_546163_2
Reference
Number
MAD/MM/NIT-18/23-24
Tender Fee 0
EMD 21825
Tender Value
Place MAHESHTALA MUNICIPALITY
Link https://wbtenders.gov.in
Start Date July 10, 2023 22:30
End Date

25/07/2023 ( Expired 661 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Ie services for construction of 6-lane greenfield highway ing from its junction with nh-4b (new nh-348) near pagote (km.0.000) till its junction on nh-48 at chowk (km.29.219) in maharashtra to be d on bot (toll) mode under nh (o)

Read more
Ca no. ge af no.1/gur-11/2025-26 repair to chajja, aluminium fitting, wall tiles, plastering, flooring, joinery, including upvc door windows, pathway and repair to swts at 54 asp under ge(af) gurgaon no 1

Ca no. ge af no.1/gur-11/2025-26 repair to chajja, aluminium fitting, wall tiles, plastering, flooring, joinery, including upvc door windows, pathway and repair to swts at 54 asp under ge(af) gurgaon no 1

Read more
Engineering, procurement and construction of civil infrastructure and vacuum infrastructure for establishing ligo india observatory at aundha, hingoli district, maharashtra-431705, india, on epc mode-i basis

Engineering, procurement and construction of civil infrastructure and vacuum infrastructure for establishing ligo india observatory at aundha, hingoli district, maharashtra-431705, india, on epc mode-i basis

Read more
Selection of epc contractor for integrated manufacturing cluster imc palakkad

Rfq cum rfp for design, construction, testing, commissioning and operation and maintenance of infrastructure works at pudussery central and kannambra of palakkad node under extension of chennai bengaluru industrial corridor cbic on epc basis.

Read more
Construction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn

Construction of road from cheema to leechi nallah km 16.950 to km 56.200 to nhsl with paved shoulder specifications and connecting road to gurdaligali post length 3.170 and sarson post length 1.310 km to nhsl specification 99 rcc 760 tf p bcn

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane ef at tier1 on single pier sec frm nashik phata to alandi phata pkgi of nh60 frm km.12.190 to km.28.890 in maharashtra on bot basis under nh o

Read more
Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Upgrad of exist road to 4/6 lane with 2lane service road on both sides and const. of 8lane elevated flyover at tier1 on single pier sect from alandi phata to khed pkgii of nh60 from km28.890 to km42.100 in maharashtra on bot basis under nh (o)

Read more
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c

Read more
Supply, installation, testing and commissioning of solar power plant and comprehensive operations and maintenance for 5 years at central workshop sivasagar for on lstk basis

Supply, installation, testing and commissioning of solar power plant and comprehensive operations and maintenance for 5 years at central workshop sivasagar for on lstk basis

Read more

Supply, delivery and installation overhead pole at para water supply scheme (intake site) and other allied works under pmd, phe dte.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise