Tender Details
Particulars | Details |
---|---|
Title |
Providing And Fixing Of Asbestos Coated And Graphite Lubricated H/D Packing Nut Bolt Coupling Bolt With Rubber Bush And Bypass Cooling Arrangement Of Pumps As And When Required For The Period Of 6 Months For Operation Of 2000 Gpm And 1300 Gpm Pumps U
|
Description |
Providing And Fixing Of Asbestos Coated And Graphite Lubricated H/D Packing Nut Bolt Coupling Bolt With Rubber Bush And Bypass Cooling Arrangement Of Pumps As And When Required For The Period Of 6 Months For Operation Of 2000 Gpm And 1300 Gpm Pumps U
|
Organisation | Central Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_CCL_333268_1 |
Reference Number |
PO(KDH)/PE(EnM)/NIT/2024-25/20 |
Tender Fee | 0 |
EMD | 9400 |
Tender Value | |
Place | KDH OCP |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=345474 |
Start Date | March 27, 2025 14:30 |
End Date |
05/04/2025 ( Expired 15 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Arrangement of replacement and fixing of graphite packing for different pumps installed at dakra project, n.k area.
Arrangement of replacement and fixing of graphite packing for different pumps installed at dakra project, n.k area.
Read moreProviding and fixing of asbestos coated and graphite lubricated h/d packing nut bolt coupling bolt with rubber bush and bypass cooling arrangement of pumps as and when required for the period of 6 months for operation of 2000 gpm and 1300 gpm pumps u
Providing and fixing of asbestos coated and graphite lubricated h/d packing nut bolt coupling bolt with rubber bush and bypass cooling arrangement of pumps as and when required for the period of 6 months for operation of 2000 gpm and 1300 gpm pumps u
Read moreFabrication of 10 inch dia and 8 inch dia delivery bends, suction bend, nipple and providing and fixing of nr valve and foot valve for operation of 1300 gpm and 2000 gpm pump at jehlitand sump under kdh ocp, nk area
Fabrication of 10 inch dia and 8 inch dia delivery bends, suction bend, nipple and providing and fixing of nr valve and foot valve for operation of 1300 gpm and 2000 gpm pump at jehlitand sump under kdh ocp, nk area
Read moreInstallation of 2000 gpm pump- motor with base frame, fabrication modification followed by supplying and fixing tire coupling r-140, base frame foot bolt, suction and delivery nipple fabrication fitting to install additional pump at main sump
Installation of 2000 gpm pump- motor with base frame, fabrication modification followed by supplying and fixing tire coupling r-140, base frame foot bolt, suction and delivery nipple fabrication fitting to install additional pump at main sump
Read moreProviding and fixing of different size of coupling nut bolt with double spring washer and rubber bush for smooth operation of pumps installed at main sump (2000 gpm and 1300 gpm), face sump (2000 gpm), mohan nagar pond (500 gpm) under dakra ocp
Providing and fixing of different size of coupling nut bolt with double spring washer and rubber bush for smooth operation of pumps installed at main sump (2000 gpm and 1300 gpm), face sump (2000 gpm), mohan nagar pond (500 gpm) under dakra ocp
Read moreComplete repair work of 1000 gpm pump make grw,and day to day consumable spares like coupling bolts,cooling pipes,base bolt with washer leather, gland packing etc.for operation of different pumps of aadocm
Complete repair work of 1000 gpm pump make grw,and day to day consumable spares like coupling bolts,cooling pipes,base bolt with washer leather, gland packing etc.for operation of different pumps of aadocm
Read moreMaking of new pin and rubber bush coupling assembly with other accessories of the four nos. of 2000 g.p.m., 150 m head pump set, in operation at karo ocp, bnk area
Making of new pin and rubber bush coupling assembly with other accessories of the four nos. of 2000 g.p.m., 150 m head pump set, in operation at karo ocp, bnk area
Read moreArrangement of replacement and fixing of 18mm,20mm and 24mm graphite packing and coupling bolts for different pumps installed at topa project under kuju area.
Arrangement of replacement and fixing of 18mm,20mm and 24mm graphite packing and coupling bolts for different pumps installed at topa project under kuju area.
Read more(a) repairing of nde side oil tank of 2000 gpm pump, rkb 250/46k, make-kirloskar (b) repairing of bypass cooling system of rkb 150/34, 1300 gpm pump and rkb 250/46, 2000 gpm pump (c) machining of 3 of coupling with drilling holes for coupling b
(a) repairing of nde side oil tank of 2000 gpm pump, rkb 250/46k, make-kirloskar (b) repairing of bypass cooling system of rkb 150/34, 1300 gpm pump and rkb 250/46, 2000 gpm pump (c) machining of 3 of coupling with drilling holes for coupling b
Read moreProviding and fixing of 05 of cast steel coupling complete with coupling nut bolts washer and rubber bush for 2000 gpm and 1300 gpm pump for mine dewatering operation in under kdh ocp, nk area.
Providing and fixing of 05 of cast steel coupling complete with coupling nut bolts washer and rubber bush for 2000 gpm and 1300 gpm pump for mine dewatering operation in under kdh ocp, nk area.
Read moreof your Industry type