Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Procurement Of Hydraulic Hoses For Stage 1 (3 X660 Mw Boiler) Milling System At Ntpc Barh
|
| Description |
Procurement Of Hydraulic Hoses For Stage 1 (3 X660 Mw Boiler) Milling System At Ntpc Barh
|
| Organisation | NTPC Limited | Public Sector Undertakings |
| Tender Id | 2025_NTPC_97876_1 |
|
Reference Number |
NTPC/USSC-CPG3/9900305313 |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | Barh Super Thermal Power Plant |
| Link |
View Original Tender Notice
https://eprocurentpc.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=101077 |
| Start Date | June 17, 2025 15:30 |
| End Date |
Expired
23/06/2025
Expired 474 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply of spares for soot blowing system of air preheaters of ktps-vi stage boiler
Supply of spares for soot blowing system of air preheaters of ktps-vi stage boiler
Read moreTggenco-ytps - supply of dynamic classifier belt, feeder door seals and mill hoses for hp1103 bowl mill in be-i and be-ii, stage-i.
Tggenco-ytps - supply of dynamic classifier belt, feeder door seals and mill hoses for hp1103 bowl mill in be-i and be-ii, stage-i.
Read moreTggenco-ktps vii stage/paloncha - supply of smart positioner for hwl and mefcv hydraulic control valves
Tggenco-ktps vii stage/paloncha - supply of smart positioner for hwl and mefcv hydraulic control valves
Read moreTggenco-btps-stage-ii-bm-division- complete overhauling of burner assemblies of unit-4 boiler during the overhaul in 2026-27
Tggenco-btps-stage-ii-bm-division- complete overhauling of burner assemblies of unit-4 boiler during the overhaul in 2026-27
Read moreKtps-vii stage-chp-mm-charges for reconditioning of wagon tippler , side arm charger and stacker cum reclaimer hydraulic cylinders.
Ktps-vii stage-chp-mm-charges for reconditioning of wagon tippler , side arm charger and stacker cum reclaimer hydraulic cylinders.
Read moreKtps-v stage- bm- provide skilled labor, specifically ibr welders and grinders, to replace the boiler tubes in unit-x of the ktps-v stage during the annual overhaul period for the year 2026-27-reg
Ktps-v stage- bm- provide skilled labor, specifically ibr welders and grinders, to replace the boiler tubes in unit-x of the ktps-v stage during the annual overhaul period for the year 2026-27-reg
Read moreTggenco btps stage ii bm-division- overhauling and servicing of various valves and safety valves in unit-4 boiler during the overhaul in fy 2026-27
Tggenco btps stage ii bm-division- overhauling and servicing of various valves and safety valves in unit-4 boiler during the overhaul in fy 2026-27
Read moreTggenco-ytps-construction of cabins for o and m staff shift operations at various locations of the tg building and boiler-1 and 2 areas at stage-i of ytps
Tggenco-ytps-construction of cabins for o and m staff shift operations at various locations of the tg building and boiler-1 and 2 areas at stage-i of ytps
Read moreTggenco- ytps(5x800mw)-stage-1-unit-2-carrying out breakdown maintenance of gates and dampers in unit-ii boiler flue gas and air path as and when required from the actual date of commencement to 31.03.2027.
Tggenco- ytps(5x800mw)-stage-1-unit-2-carrying out breakdown maintenance of gates and dampers in unit-ii boiler flue gas and air path as and when required from the actual date of commencement to 31.03.2027.
Read moreInspection of headers in unit-3 boiler stage-1 of ntpc barh (3x660mw)
Inspection of headers in unit-3 boiler stage-1 of ntpc barh (3x660mw)
Read moreof your Industry type