Tender Details
Particulars | Details |
---|---|
Title |
Loading, Unloading, Transportation And Installation Of 02 Nos. Of 55 Kw, 800mm Belt Conveyor Drive Head Complete With Electrical In E 8 Bagdona Seam Of Tawa I Mine, Wcl Pathakhera Area.
|
Description |
Loading, Unloading, Transportation And Installation Of 02 Nos. Of 55 Kw, 800mm Belt Conveyor Drive Head Complete With Electrical In E 8 Bagdona Seam Of Tawa I Mine, Wcl Pathakhera Area.
|
Organisation | Coal India Limited (CIL) |
Tender Id | 2023_WCL_296804_1 |
Reference Number |
PK3550-ENM-0031-2023-24 |
Tender Fee | |
EMD | 7900 |
Tender Value | |
Place | Office of the SO(ENM), GM Office, WCL PKD Area. |
Link | https://coalindiatenders.nic.in |
Start Date | December 24, 2023 23:00 |
End Date |
06/01/2024 ( Expired 496 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Proposal of installation and dismantling of 800mm drive head installation of belt conveyors and establishing of haulage track line in proposed working panel at damini ug mine at sohagpur area.
Proposal of installation and
 dismantling of 800mm drive head
 installation of belt conveyors and
 establishing of haulage track line in
 proposed working panel at damini
 ug mine at sohagpur area
Read moreTransportation of explosive and related works of blasting operation by contractual means at tawa ii mine, pathakhera area, wcl
Transportation of explosive and related works of blasting operation by contractual means at tawa ii mine, pathakhera area, wcl
Read moreAssistance required for dust suppression in all running faces in district of lws and bagdona seam at tawa-ii mine, pathakhera area, wcl
Assistance required for dust suppression in all running faces in district of lws and bagdona seam at tawa-ii mine, pathakhera area, wcl
Read moreTransportation of material like roof bolts with nuts bear-ing plates, w-strap capsules, props or planks and stemming material from surface to ug panel of lws and bagdona seam in all running district at tawa-ii mine, pathakhera area, wcl
Transportation of material like roof bolts with nuts bear-ing plates, w-strap capsules, props or planks and stemming material from surface to ug panel of lws and bagdona seam in all running district at tawa-ii mine, pathakhera area, wcl
Read moreCleaning/removal of spill coal/fallen coal along all trunk belts and district belts of lower workable seam and bagdona seam at tawa-ii mine, pathakhera area, wcl
Cleaning/removal of spill coal/fallen coal along all trunk belts and district belts of lower workable seam and bagdona seam at tawa-ii mine, pathakhera area, wcl
Read moreSuppression of dust after blasting in faces in all running lhd depillaring panels and where required in bagdona seam at tawa mine of pathakhera area, wcl
Suppression of dust after blasting in faces in all running lhd depillaring panels and where required in bagdona seam at tawa mine of pathakhera area, wcl
Read moreCleaning of spillage coal/shale along all running belts of bagdona seam and lower workable seam at tawa mine, pathakhera area, wcl
Cleaning of spillage coal/shale along all running belts of bagdona seam and lower workable seam at tawa mine, pathakhera area, wcl
Read moreRemoval of coal/shale debris below belt conveyor (all existing belt at ug) at chhatarpur mine no.1, pathakhera area, wcl
Removal of coal/shale debris below belt conveyor (all existing belt at ug) at chhatarpur mine no.1, pathakhera area, wcl
Read moreDismantling, loading, transportation and unloading of below mentioned items from one location to other location for the preparation of 29d-ii depillaring district in lws of tawa-ii mine, pathakhera area. a) 03 no. 90kw, 1200mm belt conveyor complete
Dismantling, loading, transportation and unloading of below mentioned items from one location to other location for the preparation of 29d-ii depillaring district in lws of tawa-ii mine, pathakhera area. a) 03 no. 90kw, 1200mm belt conveyor complete
Read moreFabrication of 03 nos. of complete tension trolley with its wheel assembly for conveyor belt at oc 1n2 mine under orient sub area.
Fabrication of 03 nos. of complete tension trolley with its wheel 
 assembly for conveyor belt at oc 1n2 mine under orient sub area.
Read moreof your Industry type