Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Bm Attending Boiler Eroded Tubes Repalcement And Weding Works At Economizer Coils In Unit 9 During Annual Overhaul Period Of Unit 9.
|
| Description |
Bm Attending Boiler Eroded Tubes Replacement And Welding Works At Economizer Coils In Unit 9 During Annual Overhaul Period Of Unit 9.
|
| Organisation | Information Technology Electronics and Communication Department Telangana | State Govt. and UT |
| Tender Id | 575909 |
|
Reference Number |
e-33/BM/SE/OM/KTPS-V |
| Tender Fee | 1644 |
| EMD | 69652 |
| Tender Value | |
| Place | TS |
| Link |
View Original Tender Notice
http://eprocurement.telangana.gov.in/ |
| Start Date | March 13, 2025 01:30 |
| End Date |
Expired
02/04/2025
Expired 457 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Annual maintenance and upkeeping of archaeological gardens under aizawl circle, aizawl (in the states of tripura and manipur) for the period from july, 2026 to march, 2027 during the financial year 2026-27
Annual maintenance and upkeeping of archaeological gardens under aizawl circle, aizawl (in the states of tripura and manipur) for the period from july 2026 to march 2027 during the financial year 2026-27
Read moreAnnual percentage rate contract on mes ssr 2020 for civil maintenance/ repair works of traverse, toe wall, drain and gantry including other connected works in filling area inside at ofk.
Annual percentage rate contract on mes ssr 2020 for civil maintenance/ repair works of traverse, toe wall, drain and gantry including other connected works in filling area inside at ofk.
Read moreTtps mech ii bm unit ii replacement of plugged eroded boiler pressure parts tubes in economizer coil assemblies in unit ii boiler during overhaul for the year 2024 2025
Ttps mech ii bm unit ii replacement of plugged eroded boiler pressure parts tubes in economizer coil assemblies in unit ii boiler during overhaul for the year 2024 2025
Read moreNctps ii mi circle bm unit i 600 mw boiler attending annual overhaul works of rectification of corroded eroded and damaged
Nctps ii mi circle bm unit i 600 mw boiler attending annual overhaul works of rectification of corroded eroded and damaged
Read moreTtps mechii bm unit iv replacement of eroded economizer upper and lower banks in unit iv boiler during the overhaul for the year 2024 2025
Ttps mechii bm unit iv replacement of eroded economizer upper and lower banks in unit iv boiler during the overhaul for the year 2024 2025
Read moreTtps mech ii bm unit v replacement of eroded economizer upper and lower banks in unit v boiler during the overhaul for the year 2024 2025
Ttps mech ii bm unit v replacement of eroded economizer upper and lower banks in unit v boiler during the overhaul for the year 2024 2025
Read moreMtps i bm aoh 2024 unit i boiler rectification replacement of defective tubes in ltsh coils and economizer hanger tubes at boiler iind pass area
Mtps i bm aoh 2024 unit i boiler rectification replacement of defective tubes in ltsh coils and economizer hanger tubes at boiler iind pass area
Read moreTtps mech ii bm unit v replacement of plugged eroded economizer upper and lower banks in unit v boiler during the overhaul for the year 2025 2026
Ttps mech ii bm unit v replacement of plugged eroded economizer upper and lower banks in unit v boiler during the overhaul for the year 2025 2026
Read moreTtps mech ii bm unit iv replacement of plugged eroded economizer upper and lower banks in unit iv boiler during the overhaul for the year 2025 2026
Ttps mech ii bm unit iv replacement of plugged eroded economizer upper and lower banks in unit iv boiler during the overhaul for the year 2025 2026
Read moreTtps mech ii bm unit iv certain specified works to be carried out in different locations of unit iv boiler in final sh ltsh ltsh terminal tubes sh hanger tubes steam cooled wall tubes eco hanger tubes and economizer coils etc during overhaul for the
Ttps mech ii bm unit iv certain specified works to be carried out in different locations of unit iv boiler in final sh ltsh ltsh terminal tubes sh hanger tubes steam cooled wall tubes eco hanger tubes and economizer coils etc during overhaul for the
Read moreof your Industry type