Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Bwn/Rs.56.87/Work For Installation Of Fire Fighting System At Ch Bansi Lal Polytechnic Bhiwani Haryana
|
Description |
Work For Installation Of Fire Fighting System At Ch Bansi Lal Polytechnic Bhiwani Haryana
|
Organisation | Haryana Government | State Govt. and UT |
Tender Id | 2025_HRY_447113_1 |
Reference Number |
202508D031E3 70EE 402C 9E0D 3591BF781C40612BAR |
Tender Fee | 6180 |
EMD | 1.14 Lakh |
Tender Value | |
Place | Bhiwani |
Link | https://etenders.hry.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=524586 |
Start Date | May 16, 2025 16:30 |
End Date |
21/05/2025 ( Expired 24 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Leasing of land for installation of a modern fueling station and allied facilities on malabar cements ltd (mcl) owned land at mcl cgu unit, pallipuram, cherthala, alapuzha district
Leasing of land for installation of a modern fueling station and allied facilities on malabar cements ltd (mcl) owned land at mcl cgu unit, pallipuram, cherthala, alapuzha district
Read moreSupply, installation, testing, commissioning and training of electrical, plumbing and fire protection works for 19 underground stations from madhavaram milk colony station to royapettah govt hospital
Station including bored tunnel between stations (ch 76.000 to ch 17250.000) for corridor 3 of chennai metro rail project phase ii.
Read moreLandslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Landslide treatment work on nh-58 (new 07) at bachelikhal ch. 279.400 to 279.600 (200 m length) and chamdhar ch.337.940 to 338.165 (225 m length) under epc mode in the state of uttarakhand under annual plan 2024-25
Read moreSupply, installation, testing and commissioning of eandm (electrical, vac and fire protection) works from jln stadium station (excluding station) to infopark station including 10 elevated stations, pd areas and associated viaduct for phase ii of kmrl
Supply, installation, testing and commissioning of eandm (electrical, vac and fire protection) works from jln stadium station (excluding station) to infopark station including 10 elevated stations, pd areas and associated viaduct for phase ii of kmrl
Read moreRectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Rectification work under risk and cost for rehabilitation and up gradation of pal phata phulambri khultabad section of nh 752 h from km. 137 758 to 105 700 design ch km 46 440 to km 78 358 on epc mode in the state of maharashtra
Read moreSupply,installation, testing, commissioning and training of electrical, fire alarm and detection, fire fighting, vac and bms works for nine elevated stations
Sholinganallur lake to sipcot 2 station including stabling lines, viaduct between the stations (ch 35044.000 to 44671.000) for corridor- 3 of chennai metro rail project phase-ii.
Read moreCompletion of incomplete work for provn of plinth adjoining mehar dispersal at af stn leh
Completion of incomplete work for provn of plinth adjoining mehar dispersal at af stn leh
Read moreSelection of system integrator for annual maintenance of items installed at mgm medical college jamshedpur
Selection of system integrator for annual maintenance of items installed at mgm medical college jamshedpur&#x0d
Read moreProcurement of automated on-line crude blending system for cdu 2 and 3 at mtf area - cpcl, manali.
Procurement of automated on-line crude blending system for cdu 2 and 3 at mtf area - cpcl, manali.
Read moreContractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta
Contractor risk and cost basis rehabilitation and up gradation to two lanes with paved shoulder four lane configurations for the work of nh 561 a pandharpur mangalwedha marwade umdai from ch. 40.800 to ch.95.136 package no.ii length 54.336 in the sta
Read moreof your Industry type