Tender Details

Particulars Details
Title
Construction Of Compound Wall At South End Of Colony Premises For Ftii, Pune
Description
Construction Of Compound Wall At South End Of Colony Premises For Ftii, Pune
Organisation Prasar Bharati, Broadcasting Corporation of India | Autonomous Bos
Tender Id 2025_PrasarBharati_26529
Reference
Number
10/EEC/CCW/AKASHVANI/PUNE/2025-26
Tender Fee 0
EMD 24496
Tender Value
Place Delhi
Link
View Original Tender Notice

https://prasarbharati.eproc.in

Start Date July 23, 2025 21:00
End Date
Expired 30/07/2025

Expired 357 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Construction of roads in converted colony pulak vihar and new pulak vihar revenue village sukher. 2808

Construction of roads in converted colony pulak vihar and new pulak vihar revenue village sukher. 2808

Read more
Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.

Construction of retaining wall and pitching work in km 21.200 to 21.700 and km 50.700 to 50.900 total length 700 m. of nh 63 in chhattisgarh state under road safety annual plan 2026-27.

Read more
Construction of drainage at mgr nagar in narasingarayanpettai

Construction of drainage at mgr nagar in narasingarayanpettai

Read more
Consultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam

Consultancy services for preparation of detailed project report (dpr) for construction of second parallel tube adjacent to existing nagabasti single tube tunnel (ch. 138) for its conversion into twin tube 4 lane configuration in the state of assam

Read more
Detailed design construction testing and commissioning of light house museum at national maritime heritage complex at lothal gujarat through epc mode

Detailed design construction testing and commissioning of light house museum at national maritime heritage complex at lothal gujarat through epc mode

Read more
Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Rfp for construction of gonda bypass (western part) of nh 330b to four lane with paved shoulder configuration design length of 20.570 km under hybrid annuity mode (ham) in the state of uttar pradesh

Read more
Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).

Construction of mnb 28.880 on digras darwha karanja section in (km ch.0.00 to 74.351) nh361c two lanes with paved shoulder in the state of maharashtra. (at risk and cost of contractor).

Read more
Construction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.

Construction of new platform no. 7 at vadodara(p) ir station adjacent to vadodara hsr station in connection with high speed railway alignment.

Read more
Plantation and maintenance of plants at maharana pratap khel gaon for 1-year (2026-2027) 2811

Plantation and maintenance of plants at maharana pratap khel gaon for 1-year (2026-2027) 2811

Read more
Appointment of an agency for conceptualizing and conducting heritage walk at brihanmumbai municipal corporation (bmc) headquarters

Appointment of an agency for conceptualizing and conducting heritage walk at brihanmumbai municipal corporation (bmc) headquarters

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise