Tender Details

About Tender

🌉 Procurement Bid Invitation: Construction Of Bridge Over Satluj River 🌉 The Public Works Department (Pwd), State Government And Union Territories, Invites Bids From Reputable Contractors For The Engineering, Procurement, And Construction (Epc) Of A 301.00 Metre Long Bridge Over The Satluj River At Village Bhajwani, District Bilaspur, Himachal Pradesh. 📅 Bid Submission Deadline: April 8, 2024, 11:00 Am Tender Fee: Inr 12,000 Earnest Money Deposit (Emd): Inr 19,90,000 Interested Bidders Must Possess The Requisite Expertise And Experience In Bridge Construction Projects. Proposals Should Encompass Detailed Project Plans, Cost Estimates, And Timelines For Completion, Adhering To The Specifications And Standards Set Forth In The Tender Documents. Keywords: Construction, Bridge, Satluj River, Epc, Pwd, State Government And Ut, Himachal Pradesh, Tender, Bid Submission
Particulars Details
Title
Construction Of 301.00 Metre Long Bridge Over Satluj River Vill. Bhajwani In Distt. Bilaspur Hp Epc Mode
Description
Construction Of 301.00 Metre Long Bridge Over Satluj River Vill. Bhajwani In Distt. Bilaspur Hp Epc Mode
Organisation PWD | State Govt. and UT
Tender Id 2024_PWD_88423_1
Reference
Number
Construction of 301.00 metre long bridge over Satluj River Vill. Bhajwani in Distt. Bilaspur HP EPC
Tender Fee 12000
EMD 1.99 Crore
Tender Value
Place Bilaspur H.P.
Link https://hptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=131305
Start Date March 14, 2024 19:30
End Date

08/04/2024 ( Expired 405 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Construction of rob with approaches in lieu of railway crossing lc 20 on nh 161h at km 24.913 in the state of maharashtra on epc mode

Construction of rob with approaches in lieu of railway crossing lc 20 on nh 161h at km 24.913 in the state of maharashtra on epc mode

Read more
Reconstruction of narrow minor bridge 3 nos. to four lane configuration n.h.63 section kuslamb yedshi at ch. 4.113 and 9.748 and 10.203 on epc mode in the state of maharashtra

Reconstruction of narrow minor bridge 3 nos. to four lane configuration n.h.63 section kuslamb yedshi at ch. 4.113 and 9.748 and 10.203 on epc mode in the state of maharashtra

Read more
Reconstruction of distressed minor bridge over dhari jhora at km 617.945 of nh-31 -new nh-17 under nh division ix in the district of jalpaiguri, west bengal on epc mode job-568.

Reconstruction of distressed minor bridge over dhari jhora at km 617.945 of nh-31 -new nh-17 under nh division ix in the district of jalpaiguri, west bengal on epc mode job-568.

Read more
Construction of limited height subway (lhs)/rub near proposed at km 503/0-1 (lc no-85) on nh-89 (ajmer nagaur section) in the state of rajasthan on epc mode

Construction of limited height subway (lhs)/rub near proposed at km 503/0-1 (lc no-85) on nh-89 (ajmer nagaur section) in the state of rajasthan on epc mode

Read more
Consultancy services for authoritys engineer for supervision of construction of four lane of chausa_buxar bypass from km 45.000 to km 65.915 (package 2) of nh 319a in the state of bihar on epc mode.

Consultancy services for authoritys engineer for supervision of construction of four lane of chausa_buxar bypass from km 45.000 to km 65.915 (package 2) of nh 319a in the state of bihar on epc mode.

Read more
Rectification of blackspot through long term measures by construction of 3-lane unidirectional vup with service road near roladungri at km 326.570 (black spot id gj-02-129) on nh-48 in the state of gujarat on epc mode

Rectification of blackspot through long term measures by construction of 3-lane unidirectional vup with service road near roladungri at km 326.570 (black spot id gj-02-129) on nh-48 in the state of gujarat on epc mode

Read more
Construction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section

Construction on epc mode of greenfield alignment to nhdl specifications with paved shoulders from naku of design km 0.00 to nakula of design km 9.130 of total design length 9.130 km on road chungthang-lachen monastry-log bridge-muguthang-naku section

Read more
Construction of major bridge over river umngot under nesids (roads)

Construction of major bridge including immediate approaches over river umngot on jongksha-kharang-dienglieng-nongjrong-moodymmai-wahiajer road, meghalaya under nesids (roads) (length - 110 m)

Read more
Construction of major bridge across godavari river at dusalgaon village at km. 75.660 design km. 29.040 and reconstruction of minor bridge across irrigation canal at ch. 57.665 design km 11.045 along parbhani gangakhed road nh 752k in the state of mh

Construction of major bridge across godavari river at dusalgaon village at km. 75.660 design km. 29.040 and reconstruction of minor bridge across irrigation canal at ch. 57.665 design km 11.045 along parbhani gangakhed road nh 752k in the state of mh

Read more
Construction of flyover at chainage km 165.020 (pastikudi) on nh-26 including approaches in the state of odisha on epc mode.

Construction of flyover at chainage km 165.020 (pastikudi) on nh-26 including approaches in the state of odisha on epc mode.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise