Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Urgent Through Cut Repairing And Reconditioning Of Steel Cord Belt For Conveyor 9 C At Nigahi Chp
|
| Description |
Urgent Through Cut Repairing And Reconditioning Of Steel Cord Belt For Conveyor 9 C At Nigahi Chp
|
| Organisation | Northern Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_NCL_333782_1 |
|
Reference Number |
NGH/EM/e-Tender/25-26/01 dtd. 05.04.2025 |
| Tender Fee | 0 |
| EMD | 75400 |
| Tender Value | - |
| Place | NCL Nigahi Area |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=346010 |
| Start Date | April 07, 2025 16:30 |
| End Date |
Expired
10/04/2025
Expired 549 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Annual estimate for cold vulcanization belt joints for the 1400mm width conveyors from 3,4,3a/b,bc-5,6 ,7a/b, 8a/b,9a/b to 17a/b , 3e/f, bf1/2 , boom and intermediate conveyors in mm-i and mm-iv sub-divisions/chp/ktps-v and vi stages for the balance period of the financial year 2026-27 and replacement of damaged full length conveyor belt with new belt including hot vulcanization belt joints for the conveyor 11b.
Read moreEpc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).
Epc contract for design, supply, erection, commissioning, testing and trial run of coal evacuation system by belt conveyors and dispatch through rapid loading system (rls) with silo at vk chp (6 mtpa), kgm area, including operation and maintenance during the five-year defect liability period (dlp).
Read moreBelt jointing work of longitudinal (through cut repairing) for 1600mm steel cord belts for chp, kocp.
Belt jointing work of longitudinal (through cut repairing) for 1600mm steel cord belts for chp, kocp.
Read moreof your Industry type