Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
About Tender
🏭 Urgent: Sheet Replacement For Boilers At Rcf Factory, Chembur 🏭 Rashtriya Chemicals And Fertilizers Ltd., A Central Government Undertaking, Is Seeking Bids For The Sheet Replacement Of Boilers No. 1, 2, And 3 In The Steam Generation Plant At Its Rcf Factory Located In Chembur, Mumbai (400074). 📅 Bid Submission Deadline: July 19, 2024, 2:00 Pm Interested Bidders Should Provide Detailed Technical And Financial Proposals, Including The Methodology For Execution, Safety Protocols, And Timelines For Completion. Keywords: Sheet Replacement, Boiler, Steam Generation Plant, Rashtriya Chemicals And Fertilizers Ltd, Rcf Factory, Chembur, Mumbai, Central Government Tender, Engineering Services, Maintenance ServicesParticulars | Details |
---|---|
Title |
Sheet Replacement Of Boiler No.1,2,3 In Steam Genration Plant At Rcf Factory, Chembur, Mumbai 400074
|
Description |
Sheet Replacement Of Boiler No.1,2,3 In Steam Genration Plant At Rcf Factory, Chembur, Mumbai 400074
|
Organisation | Rashtriya Chemicals and Fertilizers Ltd. | Central Govt. Ministry/Department |
Tender Id | 2024_RCFL_814089_1 |
Reference Number |
RCF/CC/CES/F-10/2425/719 |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | chembur |
Link | https://eprocure.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=860195 |
Start Date | July 27, 2024 17:30 |
End Date |
03/08/2024 ( Expired 315 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 399) on new b.g. line from khurda road-bolangir and its approaches at km. 138/435 (village kardakotha) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 357) on new b.g. line from khurda road-bolangir and its approaches at km. 156/088 (village baringi) of nh-57 in the state of odisha on epc mode
Read moreConstruction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Construction of four lane road over bridge (rob no. 413) on new b.g. line from khurda road- bolangir and its approaches at km. 134.274 (charichhak) of nh-57 in the state of odisha on epc mode
Read moreReconstruction of 3 nos. of damaged bridges of nh-326 at toyaput nallah at ch. km 261/060, khudipadar nallah at ch. 268/780 km and debagarh river at ch. 270/260 km on nh-326 in the state of odisha. (bid ref no. 11 ce nh of 2024-25)
Reconstruction of 3 nos. of damaged bridges of nh-326 at toyaput nallah at ch. km 261/060, khudipadar nallah at ch. 268/780 km and debagarh river at ch. 270/260 km on nh-326 in the state of odisha. (bid ref no. 11 ce nh of 2024-25)
Read moreConstruction of 06 nos married accomodation for officers at hq ce project swastik on gangtok-chungthang road under 129 rcc 758 brtf project swastik in state of sikkim job no. 30/278
Construction of 06 nos married accomodation for officers at hq ce project swastik on gangtok-chungthang road under 129 rcc 758 brtf project swastik in state of sikkim job no. 30/278
Read moreConst. of flyovers vups at lalacheruvu at km. 907.300 (bs id no ap 03 297 itc junc km. 909.000 bs id no ap (03)298)and at vemagiri (bs id no ap(03)291 n 292)on nh216a in andhra pradesh on epc mode
Const. of flyovers vups at lalacheruvu at km. 907.300 (bs id no ap 03 297 itc junc km. 909.000 bs id no ap (03)298)and at vemagiri (bs id no ap(03)291 n 292)on nh216a in andhra pradesh on epc mode
Read moreDismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Dismantling of the existing boundary wall and reconstruction of the same, along with the construction of a concrete drain alongside the wall approximately 1705.00 meters in length from gate no. 3 to the main gate at oils phq campus, narangi, guwahati, assam, including supply of all materials except cement
Read moreConstruction of r.c.c.drain in ward no 2 manish verma house to ramjan bhaijan house at chourai
Construction of r.c.c.drain in ward no 2 manish verma house to ramjan bhaijan house at chourai
Read moreReplacement of ahu cooling coils installed at various underground metro stations of line 2, 3 and 6 in dmrc network.
Replacement of ahu cooling coils installed at various underground metro stations of line 2, 3 and 6 in dmrc network.
Read moreConstruction of drain with precast in navjeevan vihar at ward no 33
Construction of drain with precast in navjeevan vihar at ward no 33
Read moreof your Industry type