Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Custom Bid For Services Jg24 Ipt244 Agency Line Up For Inspection Of Furnace Tubes Using Emat Elec
|
| Description |
|
| Organisation | INDIAN OIL CORPORATION LIMITED | Ministry of Petroleum and Natural Gas |
| Tender Id | GEM/2024/B/5410227 |
|
Reference Number |
- |
| Tender Fee | - |
| EMD | - |
| Tender Value | - |
| Place | |
| Link |
View Original Tender Notice
https://bidplus.gem.gov.in/all-bids |
| Start Date | September 19, 2024 17:18 |
| End Date |
Expired
03/10/2024
Expired 743 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Award of Contract & Bid Results
Custom bid for services - arc for high temperature thickness guaging using emat in mr
Custom bid for services - arc for high temperature thickness guaging using emat in mr
Read moreCustom bid for services - in situ inspection of tubes by rfet remote field electromagnetic technique during the overhauling of unit 10 bmd1 btps obra sonebhadra
Custom bid for services - in situ inspection of tubes by rfet remote field electromagnetic technique during the overhauling of unit 10 bmd1 btps obra sonebhadra
Read moreArresting of oil leak in 90mva power transformer by gasket replacement in radiator butterfly valve and its inspection door using oil filtration machine and crane at kgtps maruthur
Arresting of oil leak in 90mva power transformer by gasket replacement in radiator butterfly valve and its inspection door using oil filtration machine and crane at kgtps maruthur
Read moreTtps mechii tm i unitiii conducting tube cleaning in the inner surface of the condenser for its entire 10 02m length using a flexible hose fitted with nylon brush and fine water tube jet arrangement subsequent jet cleaning and inspection of
Ttps mechii tm i unitiii conducting tube cleaning in the inner surface of the condenser for its entire 10 02m length using a flexible hose fitted with nylon brush and fine water tube jet arrangement subsequent jet cleaning and inspection of
Read moreTtps mech ii bm unit v drum inspection cleaning of drum internals doors overhauling of phosphate dozing system water washing and cleaning of i pass furnace ii pass boiler structure by water jet in unit v boiler during overhaul for the year 2026 2027
Ttps mech ii bm unit v drum inspection cleaning of drum internals doors overhauling of phosphate dozing system water washing and cleaning of i pass furnace ii pass boiler structure by water jet in unit v boiler during overhaul for the year 2026 2027
Read moreInspection of 01 no. bridge and 04 no. of bow string girder robs of gc section of ddu division using high resolution image &video capture uav drone under sse/br/ddu. (br no.345/dn between station gaya-mpo at km-466/21-467/15, and bow string girder spans of robs (1x60m) between dos-phe at km-556/25-27, rob(1x60m) in bet. station phe-kwd at km-562/11-13, rob(1x60m) phe-kwd at km-564/19-21,rob(1x60m) between kwd-ssm at km-566/19-21).
Inspection of 01 no. bridge and 04 no. of bow string girder robs of gc section of ddu division using high resolution image &video capture uav drone under sse/br/ddu. (br no.345/dn between station gaya-mpo at km-466/21-467/15, and bow string girder spans of robs (1x60m) between dos-phe at km-556/25-27, rob(1x60m) in bet. station phe-kwd at km-562/11-13, rob(1x60m) phe-kwd at km-564/19-21,rob(1x60m) between kwd-ssm at km-566/19-21).
Read moreControl valve characteristics,calibration of thermocouple,dynamic response of the u tube manometer,interacting non interacting system,proportional p and proportional integral pi controllers for flow and level control,time constant of the stirred tank heater,temperature control trainer with computer system,pressure control trainer,p i i p convertor,capacitance method,nephelometer or turbidimeter,hot air oven,muffle furnace,jar test apparatus,high volume air sampler pm10,fine particulate sampler pm2.5,biochemical oxygen demand analyzer,cod reflux apparatus with cod digester,bomb calorimeter,biogas digester or anaerobic digester,melting point apparatus,ball mill,air compressor,oil free vacuum pump,ultra violet flourescene inspection cabinet
Control valve characteristics,calibration of thermocouple,dynamic response of the u tube manometer,interacting non interacting system,proportional p and proportional integral pi controllers for flow and level control,time constant of the stirred tank heater,temperature control trainer with computer system,pressure control trainer,p i i p convertor,capacitance method,nephelometer or turbidimeter,hot air oven,muffle furnace,jar test apparatus,high volume air sampler pm10,fine particulate sampler pm2.5,biochemical oxygen demand analyzer,cod reflux apparatus with cod digester,bomb calorimeter,biogas digester or anaerobic digester,melting point apparatus,ball mill,air compressor,oil free vacuum pump,ultra violet flourescene inspection cabinet
Read moreApplying 2 coats of bone white approved colour cem to gopuras sikharsa over base coat after moss lichen removal using ammonia and coir brush including all material and labor,erection and removal of cip lock double scaffolding with 40mm ms tubes challis clamps bracing and safety features for gopura painting works,providing 1st class teack wood panelled door finely carved to match temple design including aldrops hinges towe bolts fixture and complete installtion charges,scaping rust with emery paper and applying two coats of synthetic enamel paint over a base coat on existing grill fencing and gates including material and labor,removal of old damaged precast roof slabs at store room disposal debris within 2km and scaffolding erection removal as directed by site in charge,providing reinforeced cement concrete slab over store room including required centering shuttering and finishing excluding reinforcement cost,supplying straighening cutting bending placing and binding mild steel medium tensile steel bars for pr
Applying 2 coats of bone white approved colour cem to gopuras sikharsa over base coat after moss lichen removal using ammonia and coir brush including all material and labor,erection and removal of cip lock double scaffolding with 40mm ms tubes challis clamps bracing and safety features for gopura painting works,providing 1st class teack wood panelled door finely carved to match temple design including aldrops hinges towe bolts fixture and complete installtion charges,scaping rust with emery paper and applying two coats of synthetic enamel paint over a base coat on existing grill fencing and gates including material and labor,removal of old damaged precast roof slabs at store room disposal debris within 2km and scaffolding erection removal as directed by site in charge,providing reinforeced cement concrete slab over store room including required centering shuttering and finishing excluding reinforcement cost,supplying straighening cutting bending placing and binding mild steel medium tensile steel bars for pr
Read moreof your Industry type