Repairing Of 03 Three Nos Worn Out Front Idlers Of P And H 2300 Xpa Lr Shovel Of Rajmahal Project
|
Description |
Repairing Of 03 Three Nos Worn Out Front Idlers Of P And H 2300 Xpa Lr Shovel Of Rajmahal Project
|
Organisation | Eastern Coalfields Limited | Public Sector Undertakings |
Tender Id | 2025_ECL_330695_1 |
Reference Number |
ECL/RJML/GM(EXCV)/ 24-25/E-TEN/306 DT 23.02.2025 |
Tender Fee | 0 |
EMD | 3200 |
Tender Value | |
Place | RAJMAHAL AREA, DHANKUNDA, PO-BARASIMRA, DIS-GODDA |
Link | https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=342789 |
Start Date | March 01, 2025 14:30 |
End Date |
11/03/2025 ( Expired 42 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Repairing of 02 nos roll back cylinder 02 nos lift cylinder 02 nos steering cylinder lhd 02 nos push ram cylinder lhd machine no 953 or 886 01 no bucket motor lhd mc no 953 for eimco elecon make 811 lhd and repairing of 04 nos of h
Repairing of 02 nos roll back cylinder 02 nos lift cylinder 02 nos steering cylinder lhd 02 nos push ram cylinder lhd machine no 953 or 886 01 no bucket motor lhd mc no 953 for eimco elecon make 811 lhd and repairing of 04 nos of h
Read moreAnnual maintenance contract for air conditioner fitted in p and h- 1900al, sl. no. 3 shovel of khadia project for a period of 365 days.
Annual maintenance contract for air conditioner fitted in p and h- 1900al, sl. no. 3 shovel of khadia project for a period of 365 days.
Read moreRepairing of base assembly of 24/96 gaurav dragline by changing of worn out and damaged plates by new plates of sizes (20mm to 25mm).
Repairing of base assembly of 24/96 gaurav dragline by changing of worn out and damaged plates by new plates of sizes (20mm to 25mm).
Read moreSupply, retrofitting, testing and commissioning of one (01) no. of 11.5 kv, 3500 amps and three (03) nos. of 11.5 kv, 5000 amps circuit breakers.
Supply, retrofitting, testing and commissioning of one (01) no. of 11.5 kv, 3500 amps and three (03) nos. of 11.5 kv, 5000 amps circuit breakers.
Read moreInstallation of 03 (three) nos. endless haulage at (9r/16xcut, 41r/25xcut and 49r/25xcut) mk seam and two-time complete pulley shifting of haulage installed at 49r/25xcut in every 200m at bhadra 7/8 ug mine, bhadra sub-area, jamuna kotma area.
Installation of 03 (three) nos. endless haulage at (9r/16xcut, 41r/25xcut and 49r/25xcut) mk seam and two-time complete pulley shifting of haulage installed at 49r/25xcut in every 200m at bhadra 7/8 ug mine, bhadra sub-area, jamuna kotma area.
Read moreRepairing/rebuilding of worn out housing of arm(02 no.), boom (02 nos. ) boom cylinder foot pin ( 02 nos.), arm cylinder eye (04 nos.), boom foot housing (02 no.) and bucket cylinder eye (02 nos.) and then co-axial line boring to its original size i
Repairing/rebuilding of worn out housing of arm(02 no.), boom (02 nos. ) boom cylinder foot pin ( 02 nos.), arm cylinder eye (04 nos.), boom foot housing (02 no.) and bucket cylinder eye (02 nos.) and then co-axial line boring to its original size i
Read moreRepairing and rewinding of 03 nos. h.t. induction motors, i) rating 223 kw, 3.3 kv, make ngef, ii) rating 375 kw, 3.3 kv, make crompton greaves and iii) rating 1130 kw, 6.6 kv, make cg power of pump section at dipka expansion project.
Repairing and rewinding of 03 nos. h.t. induction motors, i) rating 223 kw, 3.3 kv, make ngef, ii) rating 375 kw, 3.3 kv, make crompton greaves and iii) rating 1130 kw, 6.6 kv, make cg power of pump section at dipka expansion project.
Read moreRepairing/overhauling of 03 nos. of pumps(02 nos. of flowmore make pump, model no fm 590 bd 250x200,3 stage (duty parameters 120lpsx250 mtrs) pump and 01 nos. of fm 590 bd 250x200,3 stage (duty parameters 180lpsx250 mtrs) ) as per the direction
Repairing/overhauling of 03 nos. of pumps(02 nos. of flowmore make pump, model no fm 590 bd 250x200,3 stage (duty parameters 120lpsx250 mtrs) pump and 01 nos. of fm 590 bd 250x200,3 stage (duty parameters 180lpsx250 mtrs) ) as per the direction
Read moreConstruction of 03 nos mini boaring submersible pump rewiring repairing of office extension and repairing of lt line and sf of 06 nos pole sf of led light 18 nos and panel pole painting cabling etc works nmy modinagar
Construction of 03 nos mini boaring submersible pump rewiring repairing of office extension and repairing of lt line and sf of 06 nos pole sf of led light 18 nos and panel pole painting cabling etc works nmy modinagar
Read moreRepairing / rebuilding of 8 nos. worn out bucket of 24/96 draglines and 3 nos. worn out bucket of 10/70 draglines, working at bina project.
Repairing / rebuilding of 8 nos. worn out bucket of 24/96 draglines and 3 nos. worn out bucket of 10/70 draglines, working at bina project.
Read moreof your Industry type