Tender Details

Particulars Details
Title
Tromeel,Magnetic Seprator,Drum Pulley,Feeding Hopper,Vibrating Screen With 10 Mm Hole Size,Discharge
Description
Organisation Urban Development Department Uttar Pradesh |
Tender Id GEM/2025/B/6221285
Reference
Number
-
Tender Fee -
EMD -
Tender Value -
Place
Link
View Original Tender Notice

https://bidplus.gem.gov.in/all-bids

Start Date May 16, 2025 22:35
End Date
Expired 31/05/2025

Expired 504 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Award of Contract & Bid Results

Tender Status: active
Additional Information: Average Turn Over of Last 3 Years: Lakhs Experience with Gov. Required: Years
Buyer Name: Amit Kumar
Department: Urban Development Department Uttar Pradesh
Organisation: N/a
Similar Tenders
Procurement of head anf tail pulley for inline magnetic seprator at ntpctelangana

Procurement of head anf tail pulley for inline magnetic seprator at ntpctelangana

Read more
Repairing / maintenance of conveyor take up structure , take up drum and bend pulley of reclaimer discharge belt no. 2 of bhojudih coal washery.

Repairing / maintenance of conveyor take up structure , take up drum and bend pulley of reclaimer discharge belt no. 2 of bhojudih coal washery.

Read more
Demounting, repairing, pressing and fitment work of bearing, sleeve and bearing block on discharge drum pulley, and repairing of discharge end structure of boom conveyor of stacker 2 under chp-cpp, piparwar area.

Demounting, repairing, pressing and fitment work of bearing, sleeve and bearing block on discharge drum pulley, and repairing of discharge end structure of boom conveyor of stacker 2 under chp-cpp, piparwar area.

Read more
Rectification/modification of drive base frame arrangement and under feeding hopper after g/box, drive and non-drive pulley dismantling and re-installation, alignment of unit 121aandb belt conveyor main plant of kedla washery.

Rectification/modification of drive base frame arrangement and under feeding hopper after g/box, drive and non-drive pulley dismantling and re-installation, alignment of unit 121aandb belt conveyor main plant of kedla washery.

Read more
A)repairing and overhauling of take-up drum size 1600 x 400 x 10mm (left and right side) and repairing of take up drum drive pulley size 800 x 400 x 16 mm of new bunker washed coal in rlb section b)dismantling of head snub drum size 1600 x 400x 10 mm

A)repairing and overhauling of take-up drum size 1600 x 400 x 10mm (left and right side) and repairing of take up drum drive pulley size 800 x 400 x 16 mm of new bunker washed coal in rlb section b)dismantling of head snub drum size 1600 x 400x 10 mm

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise