Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Shifting Of 2300 Mm Dia. Ms Pipe Line And Its Accessories In Mohanpura Left Bank Lift Irrigation Network Under Mohanpura Major Project.
|
| Description |
Shifting Of 2300 Mm Dia. Ms Pipe Line And Its Accessories In Mohanpura Left Bank Lift Irrigation Network Under Mohanpura Major Project.
|
| Organisation | Engineer-in-Chief - Water Resources Department | State Govt. and UT |
| Tender Id | 2025_WRD_441922_1 |
|
Reference Number |
1167/2025-26/Einc/Etendering/ dt. 05-08-2025 |
| Tender Fee | 16534 |
| EMD | 3.1 Lakh |
| Tender Value | - |
| Place | Rajgarh |
| Link |
View Original Tender Notice
https://mptenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=521486 |
| Start Date | September 08, 2025 19:00 |
| End Date |
Expired
24/09/2025
Expired 386 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Operation and maintenance for 03 years of punasa lift irrigation scheme including its distribution network by pipeline of culturable command area (cca) 35008 ha on turn-key basis including watch and ward of complete scheme as per detail scope of work
Operation and maintenance for 03 years of punasa lift irrigation scheme including its distribution network by pipeline of culturable command area (cca) 35008 ha on turn-key basis including watch and ward of complete scheme as per detail scope of work
Read moreBenchtop icp-ms system - main instrument accessories consumables and software,high-efficiency recirculating water chiller system for icp-ms,fume hood unit 150 cm x 60 cm x 60 cm with exhaust ducting and blower,microwave sample digestion system with rotor and vessels,15 kva true online ups system with isolation transformer and battery bank,computer system with control software led monitor and printer for icp-ms,modular laboratory workbenches and furniture for icp-ms laboratory,triple quadrupole gc-ms or ms system - main instrument accessories consumables and software,high-temperature pyrolyzer unit for advanced polymer and material analysis,instrument gas piping network with regulators tubing and multi-gas control panel,laboratory deep freezer -20 c for sample storage,15 kva true online ups system with isolation transformer and battery bank for gc-ms or ms,computer system with control software led monitor and printer for gc-ms or ms,modular laboratory workbenches and furniture for gc-ms or ms laboratory
Benchtop icp-ms system - main instrument accessories consumables and software,high-efficiency recirculating water chiller system for icp-ms,fume hood unit 150 cm x 60 cm x 60 cm with exhaust ducting and blower,microwave sample digestion system with rotor and vessels,15 kva true online ups system with isolation transformer and battery bank,computer system with control software led monitor and printer for icp-ms,modular laboratory workbenches and furniture for icp-ms laboratory,triple quadrupole gc-ms or ms system - main instrument accessories consumables and software,high-temperature pyrolyzer unit for advanced polymer and material analysis,instrument gas piping network with regulators tubing and multi-gas control panel,laboratory deep freezer -20 c for sample storage,15 kva true online ups system with isolation transformer and battery bank for gc-ms or ms,computer system with control software led monitor and printer for gc-ms or ms,modular laboratory workbenches and furniture for gc-ms or ms laboratory
Read moreRefurbishment of mohanpura left bank lift system.
Refurbishment of mohanpura left bank lift system.
Read moreRefurbishment of mohanpura left bank lift system.
Refurbishment of mohanpura left bank lift system.
Read moreRefurbishment of existing mohanpura project left bank lift system.
Refurbishment of existing mohanpura project left bank lift system.
Read moreOn turnkey basis management, operation and maintenance of existing pressurized irrigation schemes/sub projects under mohanpura major project for 5 years covering 5 years of mohanpura left bank lift system, 4 years of mohanpura rbc sub-project with it
On turnkey basis management, operation and maintenance of existing pressurized irrigation schemes/sub projects under mohanpura major project for 5 years covering 5 years of mohanpura left bank lift system, 4 years of mohanpura rbc sub-project with it
Read moreConstruction of pipe line distribution network and intake chamber for left bank canal km 7 under shirapur lift irrigation scheme dist solapur
Construction of pipe line distribution network and intake chamber for left bank canal km 7 under shirapur lift irrigation scheme dist solapur
Read morePipe distribution network gravity main-i and gravity main-ii on left bank canal and its distributories of nagan medium project tal navapur dist nandurbar
Pipe distribution network gravity main-i and gravity main-ii on left bank canal and its distributories of nagan medium &#x0d project tal navapur dist nandurbar
Read moreBank desires to acquire premises on lease its bahadur ke branch ludhiana due to shifting from its existing location
Bank desires to acquire premises on lease its bahadur ke branch ludhiana due to shifting from its existing location
Read moreLaying of ms riser pipe rd 0 to 600 for samrala major lift scheme
Laying of ms riser pipe rd 0 to 600 for samrala major lift scheme
Read moreof your Industry type