Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Fabrication And Erection Of Receiving Chute Liner Plate, Horizontal Plate And Side Plate Of Unit No. 202 After Dismantling The Same At 17 Mtr Level In Hms Section Of Kathara Washery
|
| Description |
Fabrication And Erection Of Receiving Chute Liner Plate, Horizontal Plate And Side Plate Of Unit No. 202 After Dismantling The Same At 17 Mtr Level In Hms Section Of Kathara Washery
|
| Organisation | Central Coalfields Limited | Public Sector Undertakings |
| Tender Id | 2025_CCL_331530_1 |
|
Reference Number |
PO/KTW/EnM/eTen/24-25/168 Dated-06.03.2025 |
| Tender Fee | 0 |
| EMD | 2500 |
| Tender Value | - |
| Place | Kathara Washery |
| Link |
View Original Tender Notice
https://coalindiatenders.nic.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=343662 |
| Start Date | March 07, 2025 16:30 |
| End Date |
Expired
17/03/2025
Expired 576 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Fabrication and erection of receiving chute with liner plate fitted its channel, angle, plate etc. of unit no. 979 belt conveyor in rlb section at kathara washery
Fabrication and erection of receiving chute with liner plate fitted its channel, angle, plate etc. of unit no. 979 belt conveyor in rlb section at kathara washery
Read moreFabrication and erection of reject chute liner plate whole replacement by 8 mm plate and rod net change with supporting frame at 4.8 mtr level in hms section of kathara washery
Fabrication and erection of reject chute liner plate whole replacement by 8 mm plate and rod net change with supporting frame at 4.8 mtr level in hms section of kathara washery
Read moreRepair, fabrication and erection of receiving chute and its channel, angle and liner plate etc. of unit no. 108 vibrator at 00 level in rcb section of kathara washery
Repair, fabrication and erection of receiving chute and its channel, angle and liner plate etc. of unit no. 108 vibrator at 00 level in rcb section of kathara washery
Read moreDismantling, fabrication and erection of motor base structure of unit no. 181 and receiving chute its channel, angle, plate etc. of unit 202 at in rcb section at kathara washery
Dismantling, fabrication and erection of motor base structure of unit no. 181 and receiving chute its channel, angle, plate etc. of unit 202 at in rcb section at kathara washery
Read moreFabrication and erection of receiving chute of feeder 08 in raw coal section at kathara washery
Fabrication and erection of receiving chute of feeder 08 in raw coal section at kathara washery
Read moreFabrication and erection of a) receiving chute and liner plate of unit no. 201, discharge chute of unit no. 205 and discharge chute liner plate of unit no. 267 b)receiving chute and liner plate etc of unit no. 211 and 212 in sec-i c)return water pipe
Fabrication and erection of a) receiving chute and liner plate of unit no. 201, discharge chute of unit no. 205 and discharge chute liner plate of unit no. 267 b)receiving chute and liner plate etc of unit no. 211 and 212 in sec-i c)return water pipe
Read moreRepair, fabrication and erection of 949 belt conveyor discharge chute and 950 belt conveyor receiving chute in rlb section of kathara washery
Repair, fabrication and erection of 949 belt conveyor discharge chute and 950 belt conveyor receiving chute in rlb section of kathara washery
Read moreFabrication and erection of 215 crusher body liner plate both side arms, pinion etc. fitting of sec-i of hms section at kathara washery
Fabrication and erection of 215 crusher body
 liner plate both side arms, pinion etc. fitting of
 sec-i of hms section at kathara washery
Read moreMaking of rail wheel in telpher of hms section at kathara washery
Making of rail wheel in telpher of hms section at kathara washery
Read moreFabrication and erection of whole body channels, strips, angles and projection joist of unit no. 210 screen after dismantling the same at 9 mtr level in hms section of kathara washery
Fabrication and erection of whole body channels, strips, angles and projection joist of unit no. 210 screen after dismantling the same at 9 mtr level in hms section of kathara washery
Read moreof your Industry type