Tender Details

Particulars Details
Title
Mtps I Tm Unit Ii Providing New Rubber Lining At Inner Surface Area Of Phosphate And Hydrazine Chemical Tanks By Replacing The Existing Damaged Lining Overhauling And Assembling Of Stirrer Mechanism During Aoh 2023 2024
Description
Mtps I Tm Unit Ii Providing New Rubber Lining At Inner Surface Area Of Phosphate And Hydrazine Chemical Tanks By Replacing The Existing Damaged Lining Overhauling And Assembling Of Stirrer Mechanism During Aoh 2023 2024
Organisation Government of Tamil Nadu
Tender Id 2023_EB_368692_1
Reference
Number
CE / MTPS-I / SE / M-I / TM / OT. 288 /2023-24.
Tender Fee 0
EMD 2400
Tender Value -
Place Office of the Superintending Engineer /M-I/MTPS-I
Link
View Original Tender Notice

https://tntenders.gov.in

Start Date September 12, 2023 14:30
End Date
Expired 18/09/2023

Expired 1126 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Mtps i tm unit ii overhauling of tlocbps h2cbps hydrazine dozing pumps phosphate dozing pumps and heater drip pumps during aoh of 2026 27

Mtps i tm unit ii overhauling of tlocbps h2cbps hydrazine dozing pumps phosphate dozing pumps and heater drip pumps during aoh of 2026 27

Read more
Mtps i tm unit ii overhauling of beacon rotork ind modact actuator with renewal of oil seals o rings wheel retainer ring replacing the defective worm wheel limit switch drive shaft checking the mechanism and oil filling during unit ii aoh 2026 27

Mtps i tm unit ii overhauling of beacon rotork ind modact actuator with renewal of oil seals o rings wheel retainer ring replacing the defective worm wheel limit switch drive shaft checking the mechanism and oil filling during unit ii aoh 2026 27

Read more
Mtps i tm unit ii inspection and overhauling of boiler feed booster pump 2a and allied works aoh of 2026 27

Mtps i tm unit ii inspection and overhauling of boiler feed booster pump 2a and allied works aoh of 2026 27

Read more
Mtps i tm unit ii complete overhauling of hp bypass and lp bypass spray valves and oil supply unit during aoh 2026 2027

Mtps i tm unit ii complete overhauling of hp bypass and lp bypass spray valves and oil supply unit during aoh 2026 2027

Read more
Mtps i tm unit ii overhauling of hp lp by pass valve actuator and its spray valve actuators including servicing of oil filters during the aoh of 2026 27

Mtps i tm unit ii overhauling of hp lp by pass valve actuator and its spray valve actuators including servicing of oil filters during the aoh of 2026 27

Read more
Mtps i tm unit ii carrying out bullet cleaning by specially designed phosphor bronze bullet shot of lhs and rhs of condenser tubes in condenser during aoh of 2026 27

Mtps i tm unit ii carrying out bullet cleaning by specially designed phosphor bronze bullet shot of lhs and rhs of condenser tubes in condenser during aoh of 2026 27

Read more
Mtps i mill plant unit ii dismantling and assembling of coal pipes with bends and renewal of eroded pipes of length at about 15 mtr length along with bends between mill outlet elbow and fuel inlet elbow during aoh 2026 27

Mtps i mill plant unit ii dismantling and assembling of coal pipes with bends and renewal of eroded pipes of length at about 15 mtr length along with bends between mill outlet elbow and fuel inlet elbow during aoh 2026 27

Read more
Mtps i mill plant unit ii dismantling the eroded 90 degree ceralin coal bends from coal pipe lines and reconditioning the released one and assembling the reconditioned bends in an appropriate manner in the coal flow system during aoh 2026 27

Mtps i mill plant unit ii dismantling the eroded 90 degree ceralin coal bends from coal pipe lines and reconditioning the released one and assembling the reconditioned bends in an appropriate manner in the coal flow system during aoh 2026 27

Read more
Mtps i tm unit ii cleaning hydraulic testing of lub oil coolers working oil coolers dismantling cleaning and assembling of suction strainers of bfps ceps renewal of bfp leak off line and suction discharge flange gaskets inspection oh of mechanical

Mtps i tm unit ii cleaning hydraulic testing of lub oil coolers working oil coolers dismantling cleaning and assembling of suction strainers of bfps ceps renewal of bfp leak off line and suction discharge flange gaskets inspection oh of mechanical

Read more
Mtps i tm unit ii overhauling and flange gasket renewing of valves in heater drain pegging steam to deaerator condenser air auxiliary steam and drain water lines and gasket renewing of valves in unit ii during aoh 2026 27

Mtps i tm unit ii overhauling and flange gasket renewing of valves in heater drain pegging steam to deaerator condenser air auxiliary steam and drain water lines and gasket renewing of valves in unit ii during aoh 2026 27

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise