Tender Details
Check your funding eligibility in 2 minutes.
Answer a few questions and our team will contact you with your best options.
Particulars | Details |
---|---|
Title |
Shifting Of Existing Water Pipelines Coming Across Different Changes Of Under Construction4 Lane R Oad Between Ranchi Purliya Road Namkum Rob To Angara Section Under D.W. And S. Division, Ranchi East, Ranchi
|
Description |
Shifting Of Existing Water Pipelines Coming Across Different Changes Of Under Construction4 Lane R Oad Between Ranchi Purliya Road Namkum Rob To Angara Section Under D.W. And S. Division, Ranchi East, Ranchi
|
Organisation | DWSD EinC | State Govt. and UT |
Tender Id | 2024_DWSD_84559_1 |
Reference Number |
SHIFTING 30/2023-24 |
Tender Fee | 10000 |
EMD | 4.57 Lakh |
Tender Value | |
Place | ranchi |
Link | https://jharkhandtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=113356 |
Start Date | March 01, 2024 15:00 |
End Date |
06/03/2024 ( Expired 489 days ago ) Search Similar tenders? |
Join for More Relevant Opportunities |
Repairs to existing road under risk and cost to four lane of karad tasgaon (from km 0/000 to km 58/830) section of nh 266 on epc mode in the state of maharashtra. (regarding panel replacement)
Repairs to existing road under risk and cost to four lane of karad tasgaon (from km 0/000 to km 58/830) section of nh 266 on epc mode in the state of maharashtra. (regarding panel replacement)
Read moreMaintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Maintenance rectification work under risk and cost for rehabilitation and up gradation of nh 753f of section ii sillod fardapur road design ch km 60 630 to km 99 660 l 32 63 km to four lane with earthen shoulder descope length km 87 700 to 94 100 c
Read moreConsultancy services for preparation of detailed project report (dpr) for construction of 4 lane elevated corridor from natesan nagar rob (km 38.220 of nh-45a) to ariyankuppam bridge (km 40.780 of nh-45a) and widening of existing road to 4 lane road
Consultancy services for preparation of detailed project report (dpr) for construction of 4 lane elevated corridor from natesan nagar rob (km 38.220 of nh-45a) to ariyankuppam bridge (km 40.780 of nh-45a) and widening of existing road to 4 lane road
Read moreLink road between jhargram-jamboni road and parihati-jamboni-fekoghat road from 0.00 km. to 3.50 km. - widening and strengthening work in the district of jhargram (2nd call)
Link road between jhargram-jamboni road and parihati-jamboni-fekoghat road from 0.00 km. to 3.50 km. - widening and strengthening work in the district of jhargram under jhargram division, p.w.dte under ridf-xxx., project id - pd242529252s000
Read moreFdr / maintenance of different roads under sabroom pwd (r and b) sub-division during the year 2025-26/ sh - soling, paver block, repair to pot holes, road side protection, removal of unsuitable soil etc.
Fdr / maintenance of different roads under sabroom pwd (r and b) sub-division during the year 2025-26/ sh - soling, paver block, repair to pot holes, road side protection, removal of unsuitable soil etc.
Read moreShifting/di of existing utilities such as sewer line, water pipelines, storm water line etc. and execution of enabling miscellaneous civil work from haryana border(near mcdtoll nh-48) to rajiv chowk namo bharat station for namo bharat corridor
Shifting/di of existing utilities such as sewer line, water pipelines, storm water line etc. and execution of enabling miscellaneous civil work from haryana border(near mcdtoll nh-48) to rajiv chowk namo bharat station for namo bharat corridor
Read moreShifting height raising of 220 kv sc shamli baghpat transmission line under etd shamli due to crossing of proposed panipat-shamli section of nh709ad pkg1 between tower location no 5 and 6 at ch 32160
Shifting height raising of 220 kv sc shamli baghpat transmission line under etd shamli due to crossing of proposed panipat-shamli section of nh709ad pkg1 between tower location no 5 and 6 at ch 32160
Read moreReplacement of old 100mm dia ac pipe line with 110mm dia hdpe pipe line and 150mm dia ac pipe line with 160mm dia hdpe pipe line at sc colony main road and sanjeevaiah nagar 1st line to vasantharaya puram 1st line for avoid contamination of water and improvement of water supply in div no.53 under ae-14 section.
Replacement of old 100mm dia ac pipe line with 110mm dia hdpe pipe line and 150mm dia ac pipe line with 160mm dia hdpe pipe line at sc colony main road and sanjeevaiah nagar 1st line to vasantharaya puram 1st line for avoid contamination of water and improvement of water supply in div no.53 under ae-14 section.
Read moreCs for ae for road safety improvement of existing four lane section of dehradun lal tappar nepali farm section of nh-7 (501.930 to 531.330) and nepali farm motichur section of nh-34 (531.330 to 538.750) on epc mode in uttarakhand under nh (o).
Cs for ae for road safety improvement of existing four lane section of dehradun lal tappar nepali farm section of nh-7 (501.930 to 531.330) and nepali farm motichur section of nh-34 (531.330 to 538.750) on epc mode in uttarakhand under nh (o).
Read moreUpgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Upgradation of 2-4 lane with paved shoulders of hansi-barwala road section of nh-148b (existing km. 170.668 to km. 194.938 (design length 24.27 km)) on epc mode in the state of haryana under nh (o)
Read moreof your Industry type