Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
About Tender
🚂 Procurement Opportunity: Design And Commissioning Of Substation Project 🏭🔧 The Ministry Of Railways, Central Government, Invites Bids From Experienced Contractors For The Design, Supply, Erection, Testing, And Commissioning Of A Substation At Jind City (Jcy/Sp) And The Conversion Of A Single Line Subordinate Substation (Ssp) To A Double Line Ssp At Jind. 📅 Bid Submission Deadline: April 05, 2024, 3:00 Pm Earnest Money Deposit (Emd): Inr 217600 Interested Bidders Should Review The Complete Tender Document For Detailed Project Specifications, Requirements, And Submission Guidelines. Keywords: Ministry Of Railways, Substation Project, Design, Supply, Erection, Testing, Commissioning, Central Government Tender, Jind City, Jcy/Sp, Ssp Conversion, Emd| Particulars | Details |
|---|---|
| Title |
Design, Supply, Erection, Testing &Amp Commissioning Of Sp At Jind City (Jcy/Sp) And Con Of Single Line Ssp To Double Line Ssp At Jind.
|
| Description |
For Complete Deion And Other Details, Please Refer To Tender
|
| Organisation | Ministry of Railways | Central Govt. Ministry/Department |
| Tender Id | 74044016 |
|
Reference Number |
49A-TRD-NDLS-2023-24 |
| Tender Fee | 0 |
| EMD | 2.18 Lakh |
| Tender Value | - |
| Place | New Delhi |
| Link |
View Original Tender Notice
https://www.ireps.gov.in/ireps/works/pdfdocs/042024/74044016/viewNitPdf_4505714.pdf |
| Start Date | March 12, 2024 22:58 |
| End Date |
Expired
05/04/2024
Expired 926 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Design, supply, erection, testing, commissioning of laying of cable for the connection of sp/ssp/ in ndls-cpyz section of delhi division of northern railway for raising of speed to 160 kmph
Design, supply, erection, testing, commissioning of laying of cable for the connection of sp/ssp/ in ndls-cpyz section of delhi division of northern railway for raising of speed to 160 kmph
Read moreDesign, supply, erection, testing and commissioning of 25 kv system ac ohe in dahod - katwara (incl.) section, with modification and conversion of existing rau ssp into rau sp in connection with dhd-ind new line project of ratlam division, western railway.
Design, supply, erection, testing and commissioning of 25 kv system ac ohe in dahod - katwara (incl.) section, with modification and conversion of existing rau ssp into rau sp in connection with dhd-ind new line project of ratlam division, western railway.
Read moreDesign, supply, erection, testing and commissioning of 2x25 kv auto-transformer (at) feeding system, including 220/55 kv krishnarajapuram (kjm) traction substation, belandur road (blrr) sectioning post (sp) and banaswadi(band) sub-sectioning post (ssp), in bangalore-jolarpettai section in bangalore division of south western railway
Design, supply, erection, testing and commissioning of 2x25 kv auto-transformer (at) feeding system, including 220/55 kv krishnarajapuram (kjm) traction substation, belandur road (blrr) sectioning post (sp) and banaswadi(band) sub-sectioning post (ssp), in bangalore-jolarpettai section in bangalore division of south western railway
Read moreName of work: design, supply, erection, testing and commissioning of ohe electrification (25 kv ac, 50 hz) and psi works (sp/ssp) in connection with idh yard remodelling (phase-ii) and ohe electrification (2x25 kv ac,50 hz) of bhandai flyover for etawah-bound down trains , agra division, n.c. railway.
Name of work: design, supply, erection, testing and commissioning of ohe electrification (25 kv ac, 50 hz) and psi works (sp/ssp) in connection with idh yard remodelling (phase-ii) and ohe electrification (2x25 kv ac,50 hz) of bhandai flyover for etawah-bound down trains , agra division, n.c. railway.
Read moreDesign, supply, erection, testing & commissioning of traction sub stations (scott/v connected) with associated switching posts (sp/ssp) for 2 x 25 kv feeding system along with provision of associated scada system in upgradation of electric traction system from 1x25kv to 2x25kv traction system for kumandih- garhwa section of ecr to meet 3000 mt loading target.
Design, supply, erection, testing & commissioning of traction sub stations (scott/v connected) with associated switching posts (sp/ssp) for 2 x 25 kv feeding system along with provision of associated scada system in upgradation of electric traction system from 1x25kv to 2x25kv traction system for kumandih- garhwa section of ecr to meet 3000 mt loading target.
Read moreDesign, supply, erection, testing and commissioning of eot crane (double girder) 5t capacity including all spares and accessories as per technical specification no. els-ed-spec/eotc-1 and drawing
Design, supply, erection, testing and commissioning of eot crane (double girder) 5t capacity including all spares and accessories as per technical specification no. els-ed-spec/eotc-1 and drawing
Read moreSurvey/route plan/design/drawings of 132 kv eht lines from grid sub station to traction substations, survey/design/ drawing of eht line crossings infringing proposed railway track & associated ohe works, wiring diagram, general power supply diagram, sectioning diagram and pegging plans related to ohe work, tss/sp/ssp location plans surveys and ohe/psi design & drawing of section for new line/ doubling projects ( nke-rxl-smi & mfp-smi, mansi-khagaria,goldenganj-katihar etc.) over
Survey/route plan/design/drawings of 132 kv eht lines from grid sub station to traction substations, survey/design/ drawing of eht line crossings infringing proposed railway track & associated ohe works, wiring diagram, general power supply diagram, sectioning diagram and pegging plans related to ohe work, tss/sp/ssp location plans surveys and ohe/psi design & drawing of section for new line/ doubling projects ( nke-rxl-smi & mfp-smi, mansi-khagaria,goldenganj-katihar etc.) over
Read moreWork of design, supply, erection, testing and commissioning of 220 kv outdoor gas insulated switchgear (gis) with double bus arrangement for 100 mva ict bay and bus coupler bay, as replacement of the existing 220 kv ais bays at 220/110/33 kv ponda su
Work of design, supply, erection, testing and commissioning of 220 kv outdoor gas insulated switchgear (gis) with double bus arrangement for 100 mva ict bay and bus coupler bay, as replacement of the existing 220 kv ais bays at 220/110/33 kv ponda su
Read moreDesign, supply, erection, testing & commissioning of 25 kv, 50 hz, single phase, ac electrification including new ssp at gorakhpur station of ljn division, ohe work at maharajganj station of bsb division & ohe modification work at various proposed rob under electrical construction unit gorakhpur (at lc no - 115 spl in bhatni yard, lc 67c in padrauna, lc no.4 in indara) in ne railway.
Design, supply, erection, testing & commissioning of 25 kv, 50 hz, single phase, ac electrification including new ssp at gorakhpur station of ljn division, ohe work at maharajganj station of bsb division & ohe modification work at various proposed rob under electrical construction unit gorakhpur (at lc no - 115 spl in bhatni yard, lc 67c in padrauna, lc no.4 in indara) in ne railway.
Read moreApplying 2 coats of bone white approved colour cem to gopuras sikharsa over base coat after moss lichen removal using ammonia and coir brush including all material and labor,erection and removal of cip lock double scaffolding with 40mm ms tubes challis clamps bracing and safety features for gopura painting works,providing 1st class teack wood panelled door finely carved to match temple design including aldrops hinges towe bolts fixture and complete installtion charges,scaping rust with emery paper and applying two coats of synthetic enamel paint over a base coat on existing grill fencing and gates including material and labor,removal of old damaged precast roof slabs at store room disposal debris within 2km and scaffolding erection removal as directed by site in charge,providing reinforeced cement concrete slab over store room including required centering shuttering and finishing excluding reinforcement cost,supplying straighening cutting bending placing and binding mild steel medium tensile steel bars for pr
Applying 2 coats of bone white approved colour cem to gopuras sikharsa over base coat after moss lichen removal using ammonia and coir brush including all material and labor,erection and removal of cip lock double scaffolding with 40mm ms tubes challis clamps bracing and safety features for gopura painting works,providing 1st class teack wood panelled door finely carved to match temple design including aldrops hinges towe bolts fixture and complete installtion charges,scaping rust with emery paper and applying two coats of synthetic enamel paint over a base coat on existing grill fencing and gates including material and labor,removal of old damaged precast roof slabs at store room disposal debris within 2km and scaffolding erection removal as directed by site in charge,providing reinforeced cement concrete slab over store room including required centering shuttering and finishing excluding reinforcement cost,supplying straighening cutting bending placing and binding mild steel medium tensile steel bars for pr
Read moreof your Industry type