🏭 Bharat Sanchar Nigam Limited (Bsnl) Rfp For Dismantling And Construction Services 🏭 Bharat Sanchar Nigam Limited (Bsnl), A Government Of India Enterprise, Has Issued A Request For Proposal (Rfp) For The Dismantling Of An Existing 40 Metre Ground Base Tower And The Subsequent Construction Of A New 40 Metre Tower Foundation At Jhumritelaiya Recall. 📅 Proposal Submission Deadline: April 13, 2024, 6:00 Pm The Project Scope Includes The Dismantling Of The Existing Tower, Construction Of The New Foundation, Erection Of The New Tower, And Allied Works Such As Painting Of The Removed Members. Interested Bidders Must Submit A Tender Fee Of Inr 590 And An Earnest Money Deposit (Emd) Of Inr 28857. Proposals Should Be Detailed, Outlining The Methodology, Timelines, And Compliance With Safety And Quality Standards. Keywords: Bharat Sanchar Nigam Limited, Dismantling, Construction, Tower Foundation, Jhumritelaiya, Rfp, Telecommunication Infrastructure, Earnest Money Deposit, Tender Fee
Particulars Details
Title
Dismantling Of 40 Metre Ground Base Tower And Construction Of 40 Metre Tower Foundation Erection With Removed Member Painting And Allied Works At Jhumritelaiya Recall
Description
Dismantling Of 40 Metre Ground Base Tower And Construction Of 40 Metre Tower Foundation Erection With Removed Member Painting And Allied Works At Jhumritelaiya Recall
Organisation Bharat Sanchar Nigam Limited (Govt of India Enterprise) | Public Sector Undertakings
Tender Id 2024_BSNL_193029_1
Reference
Number
68/NIT/EE(C)/BCD/ RCH/2023-24
Tender Fee 590
EMD 28857
Tender Value -
Place Jhumritelaiya
Link
View Original Tender Notice

https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=211393

Start Date April 06, 2024 23:30
End Date
Expired 13/04/2024

Expired 917 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Dismantling, transportation, design and construction of foundation, erection of 45 m high self-supporting lattice steel tower at akashvani mahabubnagar as per specification

Dismantling, transportation, design and construction of foundation, erection of 45 m high self-supporting lattice steel tower at akashvani mahabubnagar as per specification

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching

Read more
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc for 226.80 sq mtr,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches for 24.30 cu mtr,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc for 277.38 cu mtr,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse for 35.64 cu mtr,earth work excavation for foundation in trenches to a depth of more than 3 meters for 219.51 cu mtr,providing and laying lime concrete mixed with 50 percent lime for 33.21 cu mtr,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones for 25.92 cu mtr,construction of rr masonry gravity retaining wall in in lime mortar for 283.50 cu mtr,reconstruction of rr masonry base with available stones in lime mortar for 35.64 cu mtr,reconstr

Read more
Dismantling and shifting of 40 metre ground based tower from urgam

Dismantling and shifting of 40 metre ground based tower from urgam

Read more
Dismantling of 40 metre ground based tower at village hajipur under noida-ba.

Dismantling of 40 metre ground based tower at village hajipur under noida-ba.

Read more
Dismantling of 40 metre ground based tower at village dhanora under greater noida.

Dismantling of 40 metre ground based tower at village dhanora under greater noida.

Read more
Dismantling and shifting of 40 metre ground based tower from rajender nagar roorkee and 30 metre roof top tower from ranipur more haridwar

Dismantling and shifting of 40 metre ground based tower from rajender nagar roorkee and 30 metre roof top tower from ranipur more haridwar

Read more
Providing foundation for 40 metre tower including erection, earthing, providing engine and bts beds at kallakurichi

Providing foundation for 40 metre ground based bhilai type tower including erection, earthing, providing engine and bts beds in government medical college premises at kallakurichi

Read more
Dismantling of existing 40 metre ground based tower and its transportation from sector 28 gandhinagar

Dismantling of existing 40 metre ground based tower and its transportation from sector 28 gandhinagar

Read more
Dismantling of existing 40 metre ground based tower and its transportation from vasna rathod, dehgam, gandhinagar

Dismantling of existing 40 metre ground based tower and its transportation from vasna rathod, dehgam, gandhinagar

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise