Tender Details

Particulars Details
Title
Top Loading Balance, Weighing Balance, Rotatory Shaker, Hygrometer With Sensor
Description
Top Loading Balance, Weighing Balance, Rotatory Shaker, Hygrometer With Sensor
Organisation National Institute of Technology, Karnataka (NITK) | Central Govt. Ministry/Department
Tender Id 2025_NITK_787752_1
Reference
Number
NITK/CH/KR/NABL/24-25/1145
Tender Fee 0
EMD 0
Tender Value
Place NITK Surathkal
Link https://eprocure.gov.in/epublish/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1092115
Start Date February 05, 2025 20:30
End Date

18/02/2025 ( Expired 116 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Repairing of road with wbm on top of the dyke of ash pond logoon # 1 and 2 at dvc, dstps, andal

Repairing of road with wbm on top of the dyke of ash pond logoon # 1 and 2 at dvc, dstps, andal

Read more
Microfudic syringe pump with pressure sensor

Microfudic syringe pump with pressure sensor

Read more
Dc of twin tunnel by shield tbm, cut and cover tb, underground ramp and four underground and balance work of nk station with entry/exits including retrieval/ls, af, ws..si and dw..of inderlok-indraprastha corridor of delhi mrts project of phase-iv.

Dc of twin tunnel by shield tbm, cut and cover tb, underground ramp and four underground and balance work of nk station with entry/exits including retrieval/ls, af, ws..si and dw..of inderlok-indraprastha corridor of delhi mrts project of phase-iv.

Read more
Procurement of essential equipment i.e., analytical balance, de-humidifier, muffle furnace, hot air oven and hot plate along with installation and commissioning at coal testing laboratory, stps, mppgcl, sarni.

Procurement of essential equipment i.e., analytical balance, de-humidifier, muffle furnace, hot air oven and hot plate along with installation and commissioning at coal testing laboratory, stps, mppgcl, sarni.

Read more
Up-gradation of chiller plant manager (cpm) for three trane makes chillers (350 tr. each) installed at metro bhawan with 4 years camc of cpm including sensor after dlp period.

Up-gradation of chiller plant manager (cpm) for three trane makes chillers (350 tr. each) installed at metro bhawan with 4 years camc of cpm including sensor after dlp period.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise