Tender Details

Particulars Details
Title
Landslide Stabilisation Scheme Bhoodanam Phase I In Pothukal Panchayathof Malappuram District
Description
Dlt Retaining Wall And Cross Check Alt Works Spgb And Agrostology
Organisation Government of Kerala
Tender Id 2023_DSSC_607155_1
Reference
Number
pG(1)769/2023-LSS
Tender Fee 2760
EMD 50000
Tender Value -
Place Thiruvananthapuram
Link
View Original Tender Notice

https://etenders.kerala.gov.in

Start Date September 26, 2023 23:30
End Date
Expired 06/10/2023

Expired 1087 days ago

Search Similar tenders?

Tender Support

Get help with filing, GeM registration, documents, or relevant tender alerts.

Similar Tenders
Supply, erection, testing, commissioning of (i) 132/11kv ss at buggamadharam (ii) 132kv dc line to proposed 132/11kv ss at buggamadharam from existing 220/132kv sithapuram ss (3.60 km) and (iii) 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under rajiv gandhi lift irrigation scheme on turnkey basis.

Supply, erection, testing, commissioning of (i) 132/11kv ss at buggamadharam (ii) 132kv dc line to proposed 132/11kv ss at buggamadharam from existing 220/132kv sithapuram ss (3.60 km) and (iii) 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under rajiv gandhi lift irrigation scheme on turnkey basis.

Read more
Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis

Supply of material / equipment including transportation, insurance, delivery, erection, testing, commissioning and civil construction works of (i) erection of 132/11kv sub-station at vellatur (v), chintalapalem (m) (ii) erection of 132kv dc line to the proposed 132/11kv vellatur ss from existing 220/132 kv sithapuram ss (20 km), (iii) erection of 2 nos. 132kv feeder bays at existing 220/132kv sithapuram ss in suryapet district under mukthyala branch canal lift irrigation scheme on turnkey basis.

Read more
Landslide stabilisation works in thottakkad scheme, karassery panchayat, kozhikode district

Stone pitched graded bund bamboo planting agrostological measures retaining wall cross check

Read more
General-landslide stabilisation scheme edavanna panchayathpulikkalchola- pulikkalchola (phase ii)-general civil work

Dry rubble retaining wall - 1.25m height &amp#x0d random rubble retaining wall - 1.25m height - 10m&amp#x0d dry rubble retaining wall - 1.50m height - 16 m&amp#x0d dry rubble retaining wall - 2.0m height - 15m&amp#x0d rcc retaining wall - 2.50m height - 7.0m&amp#x0d crosschecks

Read more
Soil and water conservation works in bhoodanam phase ii lss scheme

Construction of gabion retaining wall and cross cecks

Read more
Kappamkolly landslide stabilization scheme phase ii

Cement concrete retaining wall at kunnamanagalam vayalthodu

Read more
Idinjakunnu landslide area stabilization scheme(phase-3)

1.retaining wall(blasted rubble) for stream bank stabilization(1.5m ht)-42 rm, 2.retaining wall(blasted rubble)for stream bank stabilization(2.0m ht)-46 rm,3. stone pitched graded bund(quarried stone)-850 sqm, bamboo planting-100 nos

Read more
Lanslide stabilisation works in ambalappara scheme kuttampuzha panchayat in ernakulam district

Drainage line works dr masonry retaining wall using conveyed blasted rubble and jungle stone

Read more
General-budget work-govt. ayurveda hospital, velimukku in malappuram district - phase i-budget work-construction of new building for govt. ayurveda hospital, velimukku in malappuram district (vallikkunnu l.a.c.) - phase i-composite work

Rcc framed structure - ground floor of the&amp#x0d building can be completed upto finishing and the&amp#x0d structural works of the first floor portion&amp#x0d between the gl-9 and 12.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise