Tender Details

Particulars Details
Title
Widening And Improvement To Wadala Sahur Manikwada Road Mdr 05 In Km 5/00 To 11/500 In Ta. Ashti Dist Wardha
Description
Widening And Improvement To Wadala Sahur Manikwada Road Mdr 05 In Km 5/00 To 11/500 In Ta. Ashti Dist Wardha
Organisation Government of Maharashtra
Tender Id 2023_PWR_931010_1
Reference
Number
PWD ARVI BUDGET WORK
Tender Fee 3540
EMD 3.51 Lakh
Tender Value
Place SUPERITENDING ENGINEER P.W.CIRCLE CHANDRAPUR
Link https://mahatenders.gov.in
Start Date August 01, 2023 20:30
End Date

25/08/2023 ( Expired 639 days ago )

Search Similar tenders?
Join for More
Relevant Opportunities
Similar Tenders
Improvement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr

Improvement strengthening of existing carriageway including widening of 2 lane section to 4 lane between km. 0.00 to km.12.30 in tumakuru town limit and 4 laning from design km 53.80 to design km 56.05 of nh 206 in kibbanahalli village tumakuru distr

Read more
Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode

Construction of foot over bridge at parshuram ghat, kamthe and sawarde and service road, bus bay with bus shelter etc in km 205.400 to km 241.300 parshuram ghat.arawali section dist. ratnagiri in state of maharashtra on epc mode

Read more
Widening and improvement of shangshak-tengnoupal road pkg-3 (from km. 78.250 to km. 126.250) of nh-102a into 2 lane with hard shoulder in the state of manipur under annual plan 2024-25 through epc mode (job no. 102a/mn/2024-25/42)

Widening and improvement of shangshak-tengnoupal road pkg-3 (from km. 78.250 to km. 126.250) of nh-102a into 2 lane with hard shoulder in the state of manipur under annual plan 2024-25 through epc mode (job no. 102a/mn/2024-25/42)

Read more
One time improvement of bypassed stretches from km 0 700 to 2 700 km 4 300 to 5 600 km 6 000 to 7 500 of maharashtra state border to bodhan section of nh63 extended in the state of telangana

One time improvement of bypassed stretches from km 0 700 to 2 700 km 4 300 to 5 600 km 6 000 to 7 500 of maharashtra state border to bodhan section of nh63 extended in the state of telangana

Read more
Wbpwd(r)/se/ chc/nit-01/ 25-26/1 / kandi bharatpur salar road from ch. 9.544 km to 10.644 km, widening and strengthening work under murshidabad highway division ii in the district of murshidabad, project id pd252632356s000.

Kandi bharatpur salar road from ch. 9.544 km to 10.644 km, widening and strengthening work under murshidabad highway division ii in the district of murshidabad, project id pd252632356s000.

Read more
Improvement of mdr-30 to sugar factory approach road (vr-103) km 0/735 to 1/630. tq. selu dist. parbhani.

Improvement of mdr-30 to sugar factory approach road (vr-103) km 0/735 to 1/630. tq. selu dist. parbhani.

Read more
Strengthening road safety works including improvement and routine o and m of delhi-gurgaon section of nh-48 other works along the project highway from km. 14.300 to 42.000 (rao tula ram marg in delhi to kherki dhaula fp in haryana) in delhi haryana

Strengthening road safety works including improvement and routine o and m of delhi-gurgaon section of nh-48 other works along the project highway from km. 14.300 to 42.000 (rao tula ram marg in delhi to kherki dhaula fp in haryana) in delhi haryana

Read more
Widening and strengthening of soyala osian road km 0/0 to 51/0 (mdr-384)

Widening and strengthening of soyala osian road km 0/0 to 51/0 (mdr-384)

Read more
Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode

Balance work of four laning of nh965g from km 41 369 baramati to km 83 500 indapur design length 42 131 km and one time improvement of selected stretches package ii in the state of maharashtra under bharatmala pariyojana on epc mode

Read more
Mdr-32 to sadegaon road (vr-123) km 0/00 to 3/00.tq. and dist. parbhani.

Mdr-32 to sadegaon road (vr-123) km 0/00 to 3/00.tq. and dist. parbhani.

Read more
Click Here to Download Dockets
of your Industry type
Get customized tender Recommendations for your Enterprise