Tender Details
Particulars | Details |
---|---|
Title |
Infrastructure Development Works In Parkal Municipality Under Tufidc Phase Iii Grants
|
Description |
Parkal Municipality Infrastructure Developmental Works In Parkal Municipality Under Tufidc Phase Iii Grants Construction Of Swd From Bus Stand To Towards Jyothi Rice Mill Both Side, Construction Of Swd From Bus Stand Sairam Medical To Towards Culvert Near Union Bank Both Side Construction Of Swd From Mla Camp Office Towards Culvert Near Union Bank, Construction Of Swd From Culvert Near Union Bank To Towards Culvert Near Maruthi Traders On Bhupalpally Road, Construction Of Swd From Mb Ohbr To Towards Culvert Near Old Cms Godown Construction Of Swd From Culvert Near Old Cms Godown To Towards Dharma Reddy Samail Construction Of Swd From K.Praveen Kumar House To Sai Durga Tractor Room Exist Drain On Bhupalpally Road, Laying Of Bt Road From Seetarampur To Huzurabad Road At Cotton Mill In Parkal And Laying Of Cc Roads Drains In Ward No. 2, 3, 10, 12, 14, 18, 19 And 20 In Parkal Municipality (3rd Call)
|
Organisation | Information Technology Electronics and Communication Department Telangana | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 11800 |
EMD | 11.26 Lakh |
Tender Value | |
Place | TS |
Link |
AAAAAAAAAA Login to view |
Start Date | April 22, 2025 16:00 |
End Date |
29/04/2025 ( 6 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Pkg-i - undersea power cable package (ca-01) for 220kv undersea export power cable and underground land cable under development of transmission system for offshore wind zone phase-i (500 mw vgf) off the coast of gujarat for subzone b3
Pkg-i - undersea power cable package (ca-01) for 220kv undersea export power cable and underground land cable under development of transmission system for offshore wind zone phase-i (500 mw vgf) off the coast of gujarat for subzone b3
Read moreImplementation of lt auxiliary items for smart metering works in sikkim under revamped reforms-based and results-linked, distribution sector scheme
Implementation of lt auxiliary items for smart metering works in sikkim under revamped reforms-based and results-linked, distribution sector scheme
Read moreVac, tvs along with electrical and scada works for 16 ug stations in corridor-3 of phase-2 cmrl project including tunnel and ramp sections between the stations
Vac, tvs along with electrical and scada works for 16 ug stations in corridor-3 including tunnel and ramp sections between the stations
Read moreVac, tvs along with electrical and scada works for 6 ug stations in c5 and 12 ug stations in c3 of phase-2 cmrl project including integration at occ level.
Vac, tvs along with electrical and scada works for 6 ug stations in c5 and 12 ug stations in c3 including integration at occ level.
Read moreConstruction of vup (vehicle under pass) at moominabad intersection, underpass at nowgam railway road and fob (foot over bridge) at children hospital on srinagar bypass nh 44 in the ut of jnk under road safety works on epc mode
Construction of vup (vehicle under pass) at moominabad intersection, underpass at nowgam railway road and fob (foot over bridge) at children hospital on srinagar bypass nh 44 in the ut of jnk under road safety works on epc mode
Read moreProcurement of additional civil works for g plus 2 seoc building and g plus 3 asdma building in guwahati assam including 3 years of o and m period under airbmp
Procurement of additional civil works for g plus 2 seoc building and g plus 3 asdma building in guwahati assam including 3 years of o and m period under airbmp
Read moreAAAAAAAAAA
Login to viewGap filling with hdpe pipe line raigaon jharna and repairing of damaged pipe line during construction of drain installation of valve and other allied works for zi to zv under jaigaon development authority jda under alipurduar division phe dte.
Read moreOperation and maintenance of two laning with paved shoulders of lambia raipur section of nh 458 from km 163.800 to km 218.563 (total length 54.763 km) under nhdp phase iv in the state of rajasthan
Operation and maintenance of two laning with paved shoulders of lambia raipur section of nh 458 from km 163.800 to km 218.563 (total length 54.763 km) under nhdp phase iv in the state of rajasthan
Read moreDevelopment o-m of dr.syama prasad mookerjee tunnel (chenani nashri tunnel) 2lane new tube and chenani nashri tunnel and udhampur-ramban (km67.000-km89.000 km130.000-151.000) and ramban marog (km151.000-km156.900) on dbfot basis in jk under nh(o)
Development o-m of dr.syama prasad mookerjee tunnel (chenani nashri tunnel) 2lane new tube and chenani nashri tunnel and udhampur-ramban (km67.000-km89.000 km130.000-151.000) and ramban marog (km151.000-km156.900) on dbfot basis in jk under nh(o)
Read moreAppointment of general consultant for construction of greenfield vadhvan port project at dahanu in maharashtra for landlord component of works under epc
Appointment of general consultant for construction of greenfield vadhvan port project at dahanu in maharashtra for landlord component of works under epc
Read moreof your Industry type