Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Engagement Of User Fee Agency Through Efor Nayagaon And Loni Toll Plaza Design Chainage Km.00.000 To Km.51.262 And Km.51.262 To Km.101.740 To Two Lane With Paved Shoulder/Four Lane In The State Of Maharashtra
|
| Description |
Engagement Of User Fee Agency Through Efor Nayagaon And Loni Toll Plaza Design Chainage Km.00.000 To Km.51.262 And Km.51.262 To Km.101.740 To Two Lane With Paved Shoulder/Four Lane In The State Of Maharashtra
|
| Organisation | National Highways Authority of India | Public Sector Undertakings |
| Tender Id | 2025_NHAI_231807_1 |
|
Reference Number |
NHAI/13013/547/CO/ 25-26/EQ/Nayagaon FP |
| Tender Fee | 0 |
| EMD | 0 |
| Tender Value | - |
| Place | NHAI HQ |
| Link |
View Original Tender Notice
https://etenders.gov.in/eprocure/app?page=FrontEndTenderDetailsExternal&service=page&tnid=261766 |
| Start Date | April 02, 2025 14:30 |
| End Date |
Expired
08/04/2025
Expired 543 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Consultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Consultancy services of independent engineer services for upgradation to 2 lane with paved shoulders from design km 0.000 to km 48.742 and km 61.732 to km 102.284 of bagasara-una section of nh-351k in the state of gujarat on hybrid annuity mode
Read moreIncidental management for toll fee plaza km 25 near badi ghati village (6 lane) (ii) toll fee plaza km 111 near kuchera village (6 lane) on ajmer-nagaur road nh 89 (new nh-58) at chainage 0/00 to 148/250
Incidental management for toll fee plaza km 25 near badi ghati village (6 lane) (ii) toll fee plaza km 111 near kuchera village (6 lane) on ajmer-nagaur road nh 89 (new nh-58) at chainage 0/00 to 148/250
Read moreIncidental management for toll fee plaza km 25 near badi ghati village (6 lane) (ii) toll fee plaza km 111 near kuchera village (6 lane) on ajmer-nagaur road nh 89 (new nh-58) at chainage 0/00 to 148/250
Incidental management for toll fee plaza km 25 near badi ghati village (6 lane) (ii) toll fee plaza km 111 near kuchera village (6 lane) on ajmer-nagaur road nh 89 (new nh-58) at chainage 0/00 to 148/250
Read moreConstruction work of 12 lane toll plaza on agra inner ring road ii phase chainage 11550
Construction work of 12 lane toll plaza on agra inner ring road ii phase chainage 11550
Read moreConstruction work of 12 lane toll plaza on agra inner ring road ii phase chainage 11550
Construction work of 12 lane toll plaza on agra inner ring road ii phase chainage 11550
Read moreUp gradation to two four lane with paved shoulder configuration of nh 652 from tuljapur naldurge akkalkot road chainage from km 00.000 to km 30.982 in the state of maharashtra on epc mode length 30.982km
Up gradation to two four lane with paved shoulder configuration of nh 652 from tuljapur naldurge akkalkot road chainage from km 00.000 to km 30.982 in the state of maharashtra on epc mode length 30.982km
Read moreEngagement of user fee agency on the basis of cb through etender nayagaon toll plaza and loni toll plaza in the state of maharashtra on epc and upkeep/maintenance of adjacent toilet blocks including recouping the consumable items
Engagement of user fee agency on the basis of cb through etender nayagaon toll plaza and loni toll plaza in the state of maharashtra on epc and upkeep/maintenance of adjacent toilet blocks including recouping the consumable items
Read moreRepair and mainenance of toll plaza on bharatpur bayana gangapur bhadoti road sh 01 (km. 7/00 to 119/500) veerampur toll (km. 26/500), suroth toll (km. 64/500), sewa toll (km. 108/270) total 03 nos. toll plaza
Repair and mainenance of toll plaza on bharatpur bayana gangapur bhadoti road sh 01 (km. 7/00 to 119/500) veerampur toll (km. 26/500), suroth toll (km. 64/500), sewa toll (km. 108/270) total 03 nos. toll plaza
Read moreWidening to four lane with paved shoulders from design chainage km. 27.780 sh chainage km. 459.500) to km. 57.320 sh chainage km. 489.040 belur to hassan section of nh - 373 in the state of karnataka in epc mode
Widening to four lane with paved shoulders from design chainage km. 27.780 sh chainage km. 459.500) to km. 57.320 sh chainage km. 489.040 belur to hassan section of nh - 373 in the state of karnataka in epc mode
Read moreShifting and installation of toll equipment from km 132.965 (jagjitpura) to toll plaza at km 127.400 village malian
Shifting and installation of toll equipment from km 132.965 (jagjitpura) to toll plaza at km 127.400 village malian
Read moreof your Industry type