Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Round The Clock Surveillance Of Machineries Of Ash Recovery Pump House And Its Related Electrical And Pipe Lines Up To Stps Plant For 02 Years
|
| Description |
Round The Clock Surveillance Of Machineries Of Ash Recovery Pump House And Its Related Electrical And Pipe Lines Up To Stps Plant For 02 Years
|
| Organisation | THE WEST BENGAL POWER DEVELOPMENT CORPORATION LTD. | State Govt. and UT |
| Tender Id | 2025_WBPDC_803639_1 |
|
Reference Number |
WBPDCL/STPS/NIT/E3869/24-25 |
| Tender Fee | 0 |
| EMD | 42040 |
| Tender Value | |
| Place | AdBuilding 1st floor stps |
| Link |
View Original Tender Notice
https://wbtenders.gov.in/nicgep/app?page=FrontEndTenderDetailsExternal&service=page&tnid=1785094 |
| Start Date | February 06, 2025 21:30 |
| End Date |
Expired
20/02/2025
Expired 497 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Centralized rate contract of filter bags for fae towers and silo of ash handling plant for two years
Centralized rate contract of filter bags for fae towers and silo of ash handling plant for two years
Read moreRepair/ replacement of main filtration plant at upper gorkha camp including distribution pipe lines and connected items at wellington area under ge wellington
Repair/ replacement of main filtration plant at upper gorkha camp including distribution pipe lines and connected items at wellington area under ge wellington
Read moreAnnual maintenance contract of 02 number 25kw industrial air conditioner installed in 24 96 draglines saurav and gaurav of bina project for 02 years. (work to be carried out at ncl site).
Annual maintenance contract of 02 number 25kw industrial air conditioner installed in 24 96 draglines saurav and gaurav of bina project for 02 years. (work to be carried out at ncl site).
Read moreSupply of potable water from allikulam to voc wharf pump house through private water lorry for a period of one year as and when required inside green gate at vocpa.
Supply of potable water from allikulam to voc wharf pump house through private water lorry for a period of one year as and when required inside green gate at vocpa.
Read moreRound the clock surveillance of machineries of ash recovery pump house and its related electrical and pipe lines up to stps plant for 02 years
Round the clock surveillance of machineries of ash recovery pump house and its related electrical and pipe lines up to stps plant for 02 years
Read moreRound the clock surveillance of machineries of ash recovery pump house and its related electrical lines and pipe lines up to stps plant
Round the clock surveillance of machineries of ash recovery pump house and its related electrical lines and pipe lines up to stps plant
Read more02 yrs rc for round the clock surveillance of ash slurry pipe lines of u5 and 6 from outside boundary to ash pond under ahpmm dept stps tit bit maintenance if required
02 yrs rc for round the clock surveillance of ash slurry pipe lines of u5 and 6 from outside boundary to ash pond under ahpmm dept stps tit bit maintenance if required
Read moreRc for maintenance of ash slurry and recovery pipe lines from respective pump house to discharge point for 2 years under ahp (m/ m), stps.
Rc for maintenance of ash slurry and recovery pipe lines from respective pump house to discharge point for 2 years under ahp (m/ m), stps.
Read moreRc for maintenance of ash slurry and recovery pipe lines from respective pump house to discharge point for 2 years under ahp (m/ m), stps.
Rc for maintenance of ash slurry and recovery pipe lines from respective pump house to discharge point for 2 years under ahp (m/ m), stps.
Read moreAnnual contract for round the clock surveillance of ash slurry pipe lines of u 5 and 6 from outside boundary to ash pond under ahp mm dept stps tit bit maintenance if required
Annual contract for round the clock surveillance of ash slurry pipe lines of u 5 and 6 from outside boundary to ash pond under ahp mm dept stps tit bit maintenance if required
Read moreof your Industry type