Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Cutting, Uprooting And Removal Of Trees
|
| Description |
Cutting, Uprooting And Removal Of Trees
For The Work Of Widening From Dl To
Four Lane From Km 170/2 172/0 (Km
308/4 306/6 Of Nh 948), Widening
From Dl To Dl Ps From Km 176/0
204/8 (Km 302/6 273/8 Of Nh 948)
Including Strengthening In Km 180
|
| Organisation | Central Public Procurement Portal 1 |
| Tender Id | 2023_MoRTH_767178_1 |
|
Reference Number |
TN.No.5/23-24/DO/Dt.9.8.23 |
| Tender Fee | 10620 |
| EMD | 50000 |
| Tender Value | - |
| Place | O/o DE (NH) Coimbatore |
| Link |
View Original Tender Notice
https://eprocure.gov.in |
| Start Date | August 16, 2023 23:50 |
| End Date |
Expired
19/09/2023
Expired 1118 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Supply of plasma cutting machines for unit-xi boiler
Supply of plasma cutting machines for unit-xi boiler
Read moreRemoval of silt under the manholes for maintenance of underground draiange in vikarabad municipality under municipal general funds
Removal of silt under the manholes for maintenance of underground draiange in vikarabad municipality under municipal general funds
Read moreExpression of interest (eoi) for dismantling and disposal/removal of materials of old government rcc building in greater warangal municipal corporation
Expression of interest (eoi) for dismantling and disposal/removal of materials of old government rcc building in greater warangal municipal corporation
Read moreEstimate for jungle clearance and accumulated earth removal from km 11.215 to 20.635 of wazeerabad major under nslbc of damercherla mandal, nalgonda dist(2nd call)
Estimate for jungle clearance and accumulated earth removal from km 11.215 to 20.635 of wazeerabad major under nslbc of damercherla mandal, nalgonda dist(2nd call)
Read moreSupply and installation of various finishing work items like false ceiling, cnc cutting, upvc/glass windows and doors, acp work etc. in patna zoo
Supply and installation of various finishing work items like false ceiling, cnc cutting, upvc/glass windows and doors, acp work etc. in patna zoo
Read moreRemoval of water stagnation by laying of swd from ypr kaman to existing pipe culvert at adibatla tcs road in ward 55 adibatla adibatla circle - 15 ghmc.
Removal of water stagnation by laying of swd from ypr kaman to existing pipe culvert at adibatla tcs road in ward 55 adibatla adibatla circle - 15 ghmc.
Read moreProcurement of 33kv xlpe 3cx120 sq.mm cable for removal of one span of 33kv feeder no.13 and 14 oht lines at ocp3, chp by aws, rg-1 area
Procurement of 33kv xlpe 3cx120 sq.mm cable for removal of one span of 33kv feeder no.13 and 14 oht lines at ocp3, chp by aws, rg-1 area
Read moreEstimate for jungle clearance and accumulated earth removal on wazeerabad major, chillapur major, r1 minor, l2 minor and l2/r1 sub minors of wazeerabad major in miryalaguda mandal, nalgonda(d) .(allotted for st communities)(2nd call).
Estimate for jungle clearance and accumulated earth removal on wazeerabad major, chillapur major, r1 minor, l2 minor and l2/r1 sub minors of wazeerabad major in miryalaguda mandal, nalgonda(d) .(allotted for st communities)(2nd call).
Read moreProviding civic amenities in view of urs-e-shareef to murad shaw dhoti dargah at murad nagar by providing white wash to compound wall jungle cutting under mehdipatnam ward -141 in mehdipatnam circle no.33 gz ghmc (item no.4)
Providing civic amenities in view of urs-e-shareef to murad shaw dhoti dargah at murad nagar by providing white wash to compound wall jungle cutting under mehdipatnam ward -141 in mehdipatnam circle no.33 gz ghmc (item no.4)
Read moreHiring of 1 no. 0.50 to 0.75 cu.m long boom shovel with 20 meters boom length for removal of fire coal and repair of existing ground level 16000t capacity bunkers in ocp3 chp, rg2 for a period of 100 hrs or 30 days whichever is earlier.
Hiring of 1 no. 0.50 to 0.75 cu.m long boom shovel with 20 meters boom length for removal of fire coal and repair of existing ground level 16000t capacity bunkers in ocp3 chp, rg2 for a period of 100 hrs or 30 days whichever is earlier.
Read moreof your Industry type