Tender Details
Particulars | Details |
---|---|
Title |
Dr.Nttps
|
Description |
Procurement Of Vertical Submersible Pump For Draining The Water Mixed With Coal Powder At 1 A, 1 B,1 C1,1 D,2 A1,2 B1,6 A6 B Under Ground Conveyors
|
Organisation | Information Technology, Electronics and Communications Andhra Pradesh | State Govt. and UT |
Tender Id |
AAAAAAAAAA Login to view |
Reference Number |
AAAAAAAAAA Login to view |
Tender Fee | 0 |
EMD | 0 |
Tender Value | |
Place | AP |
Link |
AAAAAAAAAA Login to view |
Start Date | May 22, 2025 23:30 |
End Date |
12/06/2025 ( 0 days left ) Search Similar tenders? |
Join for More Relevant Opportunities |
Dr.nttps/supply of pressure and temperature gauges
Dr.nttps/supply of pressure and temperature gauges
Read moreDr.nttps/procurement of universal numerical relay test kit, make: omicron
Dr.nttps/procurement of universal numerical relay test kit, make: omicron
Read moreDr.nttps-providing hill protection and shotcreting to the hill slope on both sides of tunnel road leading to c-colony, dr.nttps, ibrahimpatnam
Dr.nttps-providing hill protection and shotcreting to the hill slope on both sides of tunnel road leading to c-colony, dr.nttps, ibrahimpatnam
Read moreProcurement of liquid neutral sodium silicate glass for all the stage of dr.nttps
Procurement of liquid neutral sodium silicate glass for all the stage of dr.nttps
Read moreDr.nttps-stage-iv-reconstruction of collapsed compound wall on northern side of stage-iv periphery along the security path near the fire station
Dr.nttps-stage-iv-reconstruction of collapsed compound wall on northern side of stage-iv periphery along the security path near the fire station.
Read moreDr.nttps
Procurement of vertical submersible pump for draining the water mixed with coal powder at 1a, 1b,1c1,1d,2a1,2b1,6a6b under ground conveyors
Read moreDr.nttps
Removal and refixing of insulation either damaged or required for repair works on fg,pa,sa duct walls raph,valves,valves piping, water wall tubes around soot blowers, steam headers and dampers etc of units 5 6 as and when required and including annual overhaul period during year 2025-26.
Read moreof your Industry type