Tender Details
Beyond this tender, use our platform to source any product, service, or solution.
Get direct quotes or register as a qualified provider.
| Particulars | Details |
|---|---|
| Title |
Repairs To Walls, Roof Sheeting , Plaster , Earth Filling , Windows In Blasts Pens And E/M Installations At Af Stn Nal
|
| Description |
As Described In Bill Of Quantities
|
| Organisation | Defence eProcurement Portal |
| Tender Id | 2023_MES_600612_1 |
|
Reference Number |
GE (AF) NAL/T-37/2023-24 |
| Tender Fee | 500 |
| EMD | 60000 |
| Tender Value | - |
| Place | GE AF NAL |
| Link |
View Original Tender Notice
https://defproc.gov.in |
| Start Date | June 16, 2023 14:30 |
| End Date |
Expired
28/06/2023
Expired 1204 days ago |
Tender Support
Get help with filing, GeM registration, documents, or relevant tender alerts.
Repair to drain, path, toe walls, earth filling and other allied services at wsa-i, ii and provn of smart periodical services to certain md accn at vayu vihar at af stn adampur
Repair to drain, path, toe walls, earth filling and other allied services at wsa-i, ii and provn of smart periodical services to certain md accn at vayu vihar at af stn adampur
Read moreErection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Erection of box type scaffolding by using available scaffolding pipes fixing of scaffolding pipes with nuts and bolts etc,documentation and careful removal or dismantling of bulged out or cracked portion of the fort walls adjacent to the breaches,removal of loose earth inside the breach and disposal of the surplus excavated earth away from the monument etc,careful removal of disturbed random rubble base stones below the fort wall and stacking them for reuse,earth work excavation for foundation in trenches to a depth of more than 3 meters,providing and laying lime concrete mixed with 50 percent lime,providing rr masonry footings in cm one in four ratio in stepped manner over the pcc bed with hard granite stones,construction of rr masonry gravity retaining wall in in lime mortar,reconstruction of rr masonry base with available stones in lime mortar,reconstruction of the fallen fortification wall in lm,back filling the breach with gravelly earth mixed with boulders with proper compaction,providing stone pitching
Read moreEarth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed
Earth work in excavation,pcc up to plinth level with 1 to 4 to 8,brick work for foundation and plinth cement mortar 1to4,brick masonry with common cement,steel reinforcement for r c c work fe 500d,propping for lintels beams plinth beams bressumers,centering and shuttering including strutting propping etc,centering and shuttering including strutting propping etc,centering and shuttering uncluding strutting propping etc,pcc for work up to plinth level 1 to 2 to 4,pcc for column above pl finishing and reinforcement 1 to 1 point 5 to 3,rcc for rb and roof slab,15 mm cement plaster on rough side of single or half brick,15mm cement plaster on rough side of single or half brick wall of mix 1 to 4,supply and laying of stone aggregate of size 90 mm to 45 mm,ceramic glazed floor tiles of size 300 into 300 mm,acrylic smooth exterior paint of required shade 13 point 46 point 1 new work,filling available excavated earth lead up to 50 m and lift upto 1 point 5m,wood work in frames of doors s clerestory s,glazed
Read moreRepairs to walls, roof sheets , plaster , earth filling , windows in blasts pens at af stn nal
As described in bill of quantities
Read moreRepair to walls, roof sheeting, plaster, earth filling, windows in blast pens at af stn at nal
As described in bill of quantities
Read moreRepair to floor, plinth, plaster, roof sheeting, earth filling, joinery etc and maint of grass cutting and earth filling in wsa in tech area at af stn halwara
Repair to floor, plinth, plaster, roof sheeting, earth filling, joinery etc and maint of grass cutting and earth filling in wsa in tech area at af stn halwara
Read moreRepair to floor, plinth, plaster, roof sheeting, earth filling, joinery etc in wsa in tech area at af stn halwara
Repair to floor, plinth, plaster, roof sheeting, earth filling, joinery etc in wsa in tech area at af stn halwara
Read moreBrick work,plaster work,steel structure,roofing,roof ridges,electrical work,welding,earth filling,p
Read more
Brick work,plaster work,steel structure,roofing,roof ridges,electrical work,welding,earth filling,p
Read more
Filling of earth with rcc walls and floors near fan house, surakachhar 3 and 4 mine.
Filling of earth with rcc walls and floors near fan house, surakachhar 3 and 4 mine.
Read moreof your Industry type